July 25, 2022 EA-21-155 Mr. Terry Brown Site Vice President Energy Harbor Nuclear Corp.
Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATIONNOTIFICATION OF NRC SUPPLEMENTAL INSPECTION (95001) AND REQUEST FOR INFORMATION
Dear Mr. Brown:
By letter dated March 1, 2022, the U.S. Nuclear Regulatory Commission (NRC) communicated to you its intent to perform a supplemental inspection to review your evaluation of the root and contributing cause(s) and corrective actions for a finding of greater than Green significance (ML21356A058). The issue is discussed in NRC Inspection Report 05000346/2021092 (ML21356A058) for your Davis-Besse Nuclear Power Station.
On June 22, 2022, your staff notified the NRC of your readiness for the supplemental inspection to review the actions taken to address the performance issues. Therefore, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, beginning on August 29, 2022. This inspection procedure is conducted to provide assurance that the root cause and contributing causes of the identified issues are understood, the extent of condition and the extent of cause are identified, and the corrective actions are sufficient to prevent recurrence.
In order to minimize the impact to your staff and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for this inspection. Most of the documents identified are those that the inspectors will need prior to arrival at the plant.
If possible, we would request that this information be provided electronically to the inspectors.
Any material that is not available electronically should be mailed to the address identified in the enclosure.
We have discussed the schedule for the inspection with your staff and understand that our contact for this inspection at Davis-Besse Nuclear Power Station will be Mr. G. Wolf. If there are any questions regarding our schedule for the inspection or the material requested, please contact Mr. J. Hafeez at 630-829-9843. He may also be reached electronically at Ijaz.hafeez@nrc.gov.
T. Brown This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Richard Skokowski, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-346 License No. NPF-3
Enclosure:
Supplemental Inspection Document Request cc: Distribution via LISTSERV Dahbur, Alan signing on behalf of Skokowski, Richard on 07/25/22
T. Brown Letter to Terry Brown from Richard Skokowski dated July 25, 2022.
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATIONNOTIFICATION OF NRC SUPPLEMENTAL INSPECTION (95001) AND REQUEST FOR INFORMATION DISTRIBUTION:
Jessie Quichocho Robert Orlikowski RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDroIrib Resource John Giessner Mohammed Shuaibi Diana Betancourt-Roldan Allan Barker DRPIII DRSIII ADAMS Accession Number: ML22202A052 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII RIII NAME JHafeez:mb KLambert for DBetancourt ADahbur for RSkokowski DATE 07/22/2022 07/22/2022 07/25/2022 OFFICIAL RECORD COPY
SUPPLEMENTAL INSPECTION DOCUMENT REQUEST Enclosure Inspection Report: 05000346/2022040 Inspection Dates:
August 29, 2022 - September 2, 2022 Inspection Procedure:
IP 95001, Supplemental Inspection Please assemble the following documents and provide them to the inspector on or before the dates requested. Please provide the documents electronically via a Sharefile platform or CD-ROM / DVD format. The information sent should be current as of the date of your mailing.
Information provided onsite should be the latest approved documentation. The information should be transmitted in such a manner as to reach the addressee by the specified date.
Proprietary information and security related information should be clearly marked. Draft documentation should not be provided as part of this information request.
I.
Information Requested on or before July 29, 2022:
1.
Administrative procedures governing the sites corrective action program, including:
a.
The identification and resolution of problems; b.
Root cause, apparent cause and other types of causal evaluations; and c.
Common cause assessments, effectiveness reviews, and self-assessments.
2.
The causal evaluation report(s) and associated documents for the identified issues.
3.
All corrective actions implemented for the identified issue:
a.
Documentation supporting completion of any corrective actions; and b.
Current schedule and resource commitments for open corrective actions.
4.
The evaluation of the extent of condition and extent of cause of the issue.
5.
Ongoing, planned, or completed effectiveness reviews associated with the implemented corrective actions.
If unable to be provided electronically, this information should be sent to the following address: Mr. J. Hafeez, U.S. Nuclear Regulatory Commission, 2443 Warrenville Road, Suite 201, Lisle, IL 60532. If the information requested above will not be available, please contact Mr. Hafeez as soon as possible at 630-829-9843, or electronically at Ijaz.Hafeez@nrc.gov.