AmerGea.

An Exelon Company Clinton Power Station R.R. 3, Box 228 Clinton, IL 61727 10CFR50.36 U-603655 FeDruary 16, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk -

Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

January 2004 Monthly Operating Report Please find in the Attachment the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending January 31,2004.

Respectfully, W. S. Iliff Regulatory Assurance Manager Clinton Power Station MKB/blf Attachment cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Emergency Management Agency

CLINTON POWER STATION A1TACHMENT DATA OPERATING REPORT Docket No: 50-461 Unit Name: Clinton Unit 1 Date: February 10,2004 Completed by: M. K. Baetz Telephone: (217) 937-2201 Reporting Period: January 2004

1. Design Electrical Rating: 1062
2. Maximum Dependable Capacity (MWe-Net): 1022 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor was Critical: 744.00 744.00 98162.55
4. Number of Hours Generator On-line: 744.00 744.00 95968.73
5. Reserve Shutdown Hours: 0.00 0.00 4.00
6. Net Electrical Energy Generated (MWHrs): 659140.00 659140.00 85183026.70 (1)Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram


D-Regulatory Restriction- - - - -

E Operator Training/License Examination 5 Other (Explain)

F Administrative G Operational Error (Explain)

H Other (Explain)

Summary:

Forced losses during the month of January were due to an extension of a downpower started on December 31, 2003 for an Electrohydraulic Control System (EHC) leak on a Main Turbine Control Valve.