U-603661, February 2004 Monthly Operating Report for Clinton Power Station
| ML040830596 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 03/12/2004 |
| From: | Iliff W AmerGen Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| U-603661 | |
| Download: ML040830596 (2) | |
Text
AmerGen,
An Exelon Company Clinton Power Station R. R. 3, Box 228 Clinton, IL 61727 1 OCFR50.36 U-603661 March 12, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
February 2004 Monthly Operating Report Please find in the Attachment the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending February 29, 2004.
Respectfully, W. S. Iliff Regulatory Assurance Manager Clinton Power Station MKB/blf Attachment cc:
Regional Administrator - NRC Region IIl NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Emergency Management Agency
CLINTON POWER STATION ATTACHMENT TO U-603661 DATA OPERATING REPORT Docket No:
Unit Name:
Date:
Completed by:
Telephone:
Reporting Period:
50-461 Clinton Unit 1 February 10, 2004 M. K. Baetz (217) 937-2201 February 2004 1.
2.
Design Electrical Rating:
1062 Maximum Dependable Capacity (MWe-Net):
1022
- 3.
Number of Hours the Reactor was Critical:
- 4.
Number of Hours Generator On-line:
- 5.
Reserve Shutdown Hours:
- 6.
Net Electrical Energy Generated (MWHrs):
This Month 183.80 110.32 0.00 56764.60 Year-to-Date Cumulative 927.80 98346.35 854.32 96079.05 0.00 4.00 715904.60 85239791.30 Unit Shutdowns Type Method of Forced Duration Reason Shutting Down Corrective No.
Date Scheduled (Hours)
(1) the Reactor or Actions/Comments Reducing Power (2)
C1 R09 2/2/04 Scheduled 548.03 C
1 Unit was shutdown for a planned refueling outage Cl R09 2/26/04 Scheduled 37.65 B
5 - reactor was not Removed turbine shutdown generator from the grid for scheduled turbine off-line testing as part of power ascension from C1 R09.
(1) Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training/License Examination F Administrative G Operational Error (Explain)
H Other (Explain)
(2) Method:
1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)
Challenges other than routine surveillance testing to Safety/Relief Valve Operations: None