Text

Ameren-An Exelon/British Energy Company Clinton Power Station R.R. 3 Box 228 Clinton, IL 61727-9351 1 OCFR50.36 U-603620 May 7, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

April 2003 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending April 30, 2003.

Respectfully, Regulator Assurance Manager Clinton Power Station MJS/blf Attachments cc:

Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety a

ATTACHMENT 1 CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month April 2003 None

ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 17 18 19 20 21 22 23 24 25 26 27 28 29 30 50-461 Clinton 1 04/30/03 M. J. Sloan (217)937-3280 1025 1025 1026 1025 1025 1025 1025 1025 1025 1025 1026 1023 1024 1023 MONTH April 2003 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 1025 1025 1025 1025 1025 983 1023 1023 1025 1007 34 0

235 995 1012 1024

\\

J B

ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO.

50-461 UNIT Clinton 1 DATE 04/30/03 COMPLETED BY TELEPHONE M. J. Sloan (217)937-3280 OPERATING STATUS

1.

REPORTING PERIOD:

April2003 GROSS HOURS IN REPORT PERIOD:

719

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

3473 MAX. DEPEND. CAPACITY (MDC) (MWe-Net):

1022 DESIGN ELECTRICAL RATING (MWe-Gross):

1062

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

None

4.

REASONS FOR RESTRICTION (IF ANY):

N/A

5.

NUMBER OF HOURS REACTOR WAS CRITICAL

6.

REACTOR RESERVE SHUTDOWN HOURS

7.

HOURS GENERATOR ONLINE

8.

UNIT RESERVE SHUTDOWN HOURS

9.

GROSS THERMAL ENERGY GENERATED (MWH)

10.

GROSS ELECTRICAL ENERGY GENERATED (MWH)

11.

NET ELECTRICAL ENERGY GENERATED (MWH)

12.

REACTOR SERVICE FACTOR

13.

REACTOR AVAILABILITY FACTOR

14.

UNIT SERVICE FACTOR

15.

UNIT AVAILABILITY FACTOR

16.

UNIT CAPACITY FACTOR (Using MDC)

17.

UNIT CAPACITY FACTOR (Using Design MWe)

18.

UNIT FORCED OUTAGE RATE THIS MONTH 675.0 0.0 662.4 0.0 2.068.695 691,783.0 666.612 93.9%

93.9%

92.1 %

92.1%

99.7%

91.2%

0.0%

YR TO DATE 2835.0 0.0 2822.4 0.0 8,887.151.0 2.976.810.0 2.871.569.5 98.5%

98.5%

98.0%

98.0%

107.2%

98.1%

0.0%

CUMULATIVE 91.571.8 0.0 89.411.9 4.0 248,516.896.6 82.398.523 78,696.467

_67.7%

67.7%

66.1%

66.1%

62.6%

57.2%

6.6%

19.

SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

TYPE DATE DURATION N/A

20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

IA ATTACHMENT 4

'4 UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY M. J. Sloan REPORT MONTH TYPE FORCED DATE F:

SCHEDULED DURATION (HOURS)

REASON (1)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)

CORRECTIVE ACTIONS/COMMENTS CIM13 04/11/03 SCHEDULED 56.6 HOURS B

2 PLANNED OUTAGE TO REPAIR THE 'B' REACTOR RECIRCULATION FLOW CONTROL VALVE. DURING THE DOWN-POWERING EVOLUTION, A MANUAL REACTOR SCRAM WAS INITIATED AT APPROXIMATELY 33%

POWER DUE TO HIGH VIBRATION LEVELS OBSERVED ON THE MAIN TURBINE BEARINGS.

(1)

Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (expjain)

(2)

Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain)

April 2003 NO.

50-461 Clinton 1 04/30/03