U-603555, April 2002 Monthly Operating Report for Clinton Power Station, Unit 1

From kanterella
Jump to navigation Jump to search
April 2002 Monthly Operating Report for Clinton Power Station, Unit 1
ML021420380
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/08/2002
From: Iliff W
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-603555
Download: ML021420380 (5)


Text

AmerGen An Exelon/British Energy Company Clinton Power Station R.R. 3 Box 228 Clinton, IL 61727-9351 Phone: 217 935-8881 10CFR50.36 U-603555 8E.100c May 8, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

April 2002 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending April 30, 2002.

Respectfully, 1A). .Sff W. S. Iliff Regulatory Assurance Manager Clinton Power Station MJS/blf Attachments cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety

>1

""/ 2'

ATTACHMENT 1 CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month April 2002 None

ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 UNIT Clinton 1 DATE 04/30/02 COMPLETED BY M. J. Sloan TELEPHONE (217)937-3280 MONTH April 2002 1 805 17 2 6 18 3 0 19 4 0 20 5 0 21 6 0 22 7 0 23 8 0 24 9 0 25 10 0 26 11 0 27 12 0 28 13 0 29 v 14 0 30 w 15 0 16 0

ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO. 50-461 UNIT Clinton 1 DATE 04/30/02 COMPLETED BY M. J. Sloan TELEPHONE (217)937-3280 OPERATING STATUS

1. REPORTING PERIOD: April 2002 GROSS HOURS IN REPORT PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2894 MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 930 DESIGN ELECTRICAL RATING (MWe-NET): 933
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMUL ATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL 27.6 2187.6 82,998.8
6. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
7. HOURS GENERATOR ON LINE 25.0 2185.0 80,968.7
8. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 4.0
9. GROSS THERMAL ENERGY GENERATED (MWH) 60698.0 6,283,601 221,800,940.6
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 20348.0 2,090,723.0 73,536,353
11. NET ELECTRICAL ENERGY GENERATED (MWH) 10,525 2,000,700.5 70,168,139
12. REACTOR SERVICE FACTOR 3.8% 76.0% 66.0%
13. REACTOR AVAILABILITY FACTOR 3.8% 76.0% 66.0%
14. UNIT SERVICE FACTOR 3.5% 76.0% 64.0%
15. UNIT AVAILABILITY FACTOR 3.5% 76.0% 64.0%
16. UNIT CAPACITY FACTOR (Using MDC) 1.6% 74.7% 59.6%
17. UNIT CAPACITY FACTOR (Using Design MWe) 1.6% 74.5% 59.4%
18. UNIT FORCED OUTAGE RATE 0.0% 0.0% 7.1%
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

TYPE DATE DURATION NONE

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

May 5, 2002

ATTACHMENT 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461 UNIT Clinton 1 DATE 04/30/02 COMPLETED BY M.J. Sloan REPORT MONTH March 2002 METHOD OF TYPE SHUTTING DOWN FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE F: SCHEDULED (HOURS) REASON (1) REDUCING POWER ACTIONS/COMMENTS (2) 01 04/02/02 Scheduled 695.0 C 1-Manual Refueling Outage No 8 (CIR08)

(1) Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)

(2) Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain)