Text

Amergent An Exelon Company Clinton Power Station R. R. 3, Box 228 Clinton, IL 61727 1 OCFR50.36 U-603688 August 12, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

July 2004 Monthly Operating Report Please find in the Attachment the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending July 31, 2004.

Respectfully, W. S. Iliff Regulatory Assurance Manager Clinton Power Station JLP/blf Attachment cc:

Regional Administrator - NRC Region IlI NRC Senior Resident Inspector - Clinton Power Station Illinois Emergency Management Agency - Division of Nuclear Safety

OPERATING DATA REPORT Attachment to U-603688 DOCKET NO.

50-461 UNIT NAME Clinton 1 DATE August 11, COMPLETED BY P.K. Ryan TELEPHONE (217) 937-;

REPORTING PERIOD:

,2004 2201 July 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,062.00 1,022.00 This Month Yr-to-Date Cumulative

3.

Number of Hours the Reactor was Critical 642.45 4,462.65 101,881.20

4.

Number of Hours Generator On-line 616.42 4,239.61 99,464.34

5.

Reserve Shutdown Hours 0.00 0.00 4.00 a-6.-Net Electrical Energy.Generated (MWHrs)

.- _636,993.18 __4,141,138.78 _88,665,025.48 -

UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments C1 F44 07/13/2004 F

127.58 A

3 On July 13, 2004 at 1610, Clinton scrammed when lightning struck a 345 kV transmission line near the plant. A relay associated with the main power transformer actuated prematurely during the event, causing a generator load reject.

SUMMARY

Clinton experienced a forced outage on July 13 when a lightning strike caused a generator load reject. A planned replacement of the reactor recirculation pump B seal was performed during the outage.

1 2

Reason:

Method:

A Equipment Failure (Explain) 1 Manual B

Maintenance or Test 2

Manual Trip/Scram C

Refueling 3

Automatic Trip/Scram D

Regulatory Restriction 4

Continuation E

Operator Training & License Examination 5

Other (Explain)

F Administration

~G -G Operational Error (Explain)_

H Other (Explain)

I Challenges to Main Steam Safety Relief Valves: None I