U-603670, April 2004 Monthly Operating Report for Clinton Power Station

From kanterella
Jump to navigation Jump to search
April 2004 Monthly Operating Report for Clinton Power Station
ML041420302
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/13/2004
From: Lliff W
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-603670
Download: ML041420302 (2)


Text

Amerga3e An Exelon Company Clinton Power Station R. R. 3, Box 228 Clinton, IL 61727 1 OCFR50.36 U-603670 May 13, 2004 U.S. Nuclear-Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

April 2004 Monthly Operating Report Please find in the Attachment the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending April 30, 2004.

Respectfully, W. S. Iliff Regulatory Assurance Manager Clinton Power Station JLP/blf Attachment cc:

Regional Administrator - NRC Region ll NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Emergency Management Agency

.m CLINTON POWER STATION ATTACHMENT TO U-603670 OPERATING DATA REPORT Page 1 of 1 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

Reporting Period:

50-461 Clinton 1 May 12, 2004 P. K. Ryan (217) 937-2201 April 2004

1.

Design Electrical Rating:

2.

Maximum Dependable Capacity (MWe-Net):

1,062.00 1,022.00

3.

Number of Hours the Reactor was Critical:

4.

Number of Hours Generator On-line:

5.

Reserve Shutdown Hours:

6.

Net Electrical Energy Generated (MWHrs):

This Month 719.00 719.00 0.00 747,264.00 Yr-to-Date

.2356.20 2,250.94 Cumulative 99,774.75 97,475.67 4.00 86,663,928.30 0.00 2,140,041.60 Unit Shutdowns Type Method of F: Forced Duration Shutting Cause & Corrective No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Action Comments

SUMMARY

There were no planned or unplanned energy losses in April.

(1) Reason:

A Equipment Failure (Explain)

B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & License Examination FAAdrrinistratiee G Operational Error (Explain)

H Other (Explain)

(2) Method:

1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other(Explain)

Challenges Main Steam Safety/Relief Valves: None