U-603692, August 2004 Monthly Operating Reporting for Clinton Power Station

From kanterella
Jump to navigation Jump to search
August 2004 Monthly Operating Reporting for Clinton Power Station
ML042660379
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/13/2004
From: Lliff W
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-603692
Download: ML042660379 (2)


Text

Ameriae An Exelon Company Clinton Power Station R. R.3, Box 228 Clinton, IL 61727 1 0CFR50.36 U-603692 September 13, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

August 2004 Monthly Operating Report Please find in the Attachment the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending August 31, 2004.

Respectfully, W. S. lliff0 Regulatory Assurance Manager Clinton Power Station JLP/bIf Attachment cc:

Regional Administrator-NRC Region IlIl NRC Senior Resident Inspector-Clinton Power Station Office of Nuclear Facility Safety - Illinois Emergency Management Agency

OPERATING DATA REPORT Attachment to U-603692 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-461 Clinton 1 September 10,2004 P. K. Ryan (217) 937-2201 August 2004

1.

Design Electrical Rating

2. Maximum Dependable Capacity (MWe-Net) 1 06200 1,022.0 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 782,402.00 Yr-to-Date 5,206.65 4,983.61 0.00 4,923,540.78 Cumulative 102,625.20 100,208.34 4.00 89,447,427.48 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

There were no planned or forced losses in August.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

3 4

5 Manual Trip/Scram Automatic Trip/Scram Continuation Other (Explain)

Page 1 of 1