U-604754, Submittal of Integrated Initial License Training Examination Materials

From kanterella
Jump to navigation Jump to search
Submittal of Integrated Initial License Training Examination Materials
ML23115A333
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/06/2023
From: Chalmers T
Constellation Energy Generation
To:
NRC/RGN-III
References
U-604754
Download: ML23115A333 (1)


Text

'

Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604754 April 6, 2023 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRc* Docket No. 50-461 Constellation.

Subject:

Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials, which Clinton Power Station (CPS) is submitting in support of the initial license exam scheduled for the weeks of 07 /17 /23 through 07 /28/23, at CPS.

This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.

These examination materials have been developed in accordance with NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors," Revision 12. Please note that reference materials are included in the package.

As of the 150-day submittal, modifications have been made to the Integrated Examination Outlines with regards to Scenarios 1 and 3 and the SRO Administrative JPM outline to improve content and ensure Critical Task validity. These changes improve examination quality and are in compliance with NUREG-1021, Revision 12, "Operator Licensing Examination Standards for Power Reactors."

In accordance with NUREG-1021, Revision 12, Section ES-1.3, Examination Security, please ensure that these materials are withheld from public disclosure until after the examinations are complete.

There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter please contact Ms. Amanda Corrigan, Senior Manager Site Training at (217) 937-4000. For questions concerni119 examination material_s please contact Mr: Matthew Beeler, Lead Operations Instructor, at (21"7) 937-4078.

  • l Respectfully I Chalmers,}§'*g~:~,:,;i,y Tom 2023.04.06

... 07;1 :56 -05'00' Thomas D. Chalmers Site Vice President Clinton Power Station

U.S. Nuclear Regulatory Commission U-604754 Page 2 of 2

Enclosures:

(Mailed to Ted Wingfield, NRG Region Ill Chief Examiner)

RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:

Operating Test Quality Checklist (Form 2.3-2)

Events and Evolutions Checklist (Form 3.4-1)

Written Exam Quality Checklist (Form 2.3-4)

Examination Security Agreements (Form 1.3-1)

Record of Rejected K/As (Form 4.1-1) cc:

Chief, NRG Operator Licensing Branch (without Enclosures)

NRG Senior Resident Inspector - Clinton Power Station (without Enclosures)

NRG Project Manager, NRR - Clinton Power Station (without Enclosures)

NRC Document Co I Desk without Enclosures