Amer@

An Exelon/British Energy Company Clinton Power Station R R 3 Box 228 Clinton, IL 61727-9351 1 OCFR50.36 U-603599 March 6, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

February 2003 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending February 28, 2003.

Respectfully, W. S. Iliff Regulatory Assurance Manager Clinton Power Station MJS/blf Attachments cc:

Regional Administrator - NRC Region III NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety

-Tlýaq

ýý L

ATTACHMENT 1 CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month February 2003 None

ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-461 Clinton 1 02/28/03 M. J. Sloan (217)937-3280 February 2003 1025 1025 1024 1023 1023 1025 1025 1024 1025 1023 1024 1024 1023 1025 1024 965 MONTH 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1022 1023 1023 1024 1025 1025 1024 1024 1024 1024 1025 1O25

,r-ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO.

50-461 UNIT Clinton 1 DATE 02/28/03 COMPLETED BY TELEPHONE M. J. Sloan (217)937-3280 OPERATING STATUS

1.

REPORTING PERIOD:

February 2003 GROSS HOURS IN REPORT PERIOD: 672

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

3473 MAX. DEPEND. CAPACITY (MDC) (MWe-Net):

1022 DESIGN ELECTRICAL RATING (MWe-Gross):

1062

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

None

4.

REASONS FOR RESTRICTION (IF ANY):

N/A NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

GROSS ELECTRICAL ENERGY GENERATED (MWH)

NET ELECTRICAL ENERGY GENERATED (MWH)

REACTOR SERVICE FACTOR REACTOR AVAILABILITY FACTOR UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (Using MDC)

UNIT CAPACITY FACTOR (Using Design MWe)

UNIT FORCED OUTAGE RATE THIS MONTH 672 0 00 672.0 00 2,122,840 711,7145 686,722 1000%

1000%

100 0 %

1000%

1099%

1005%

0 0%

YR TO DATE 14160 00 14160 00 4,464,021 0 1,495,835 0 1,442,9435 1000%

1000%

1000%

1000%

1096%

1002%

0.0%

CUMULATIVE 90,152 8 00 88,005.5 40 244,093,766 6 80,917,548 77,267,841 674%

674%

658%

65.8%

62.1%

568%

6 7%

19.

SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

TYPE DATE DURATION NONE

20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

5.
6.
7.

8 9

10 11 12 13 14 15 16 17 18.

ATTACHMENT 4 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH February 2003 TYPE FORCED NO.

DATE F:

SCHEDULED DURATION (HOURS)

REASON (1)

DOCKET NO.

UNIT DATE COMPLETED BY METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2) 50-461 Clinton 1 02/28/03 M. J. Sloan CORRECTIVE ACTIONS/COMMENTS 1

02/16/03 SCHEDULED 4 HRS 3 MIN B

1 PERFORM 9031.07, MAIN TURBINE CONTROL VALVE TEST.

(1)

Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)

(2)

Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain)