U-603633, September 2003 Monthly Operating Report for Clinton Unit 1

From kanterella
Jump to navigation Jump to search
September 2003 Monthly Operating Report for Clinton Unit 1
ML032880447
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/07/2003
From: Iliff W
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-603633
Download: ML032880447 (5)


Text

I9:

AmerGen An Exelon/British Energy Company Clinton Power Station R.R. 3 Box 228 Clinton, IL 61727-9351 1 OCFR50.36 U-6036a0 Octoberi1,2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating Ucense No. NPF-62 NRC Docket No. 50-461

Subject:

September 2003 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending September 30,2003.

Respectfully, WS, W. S. Iiff Regulatory Assurance Manager Clinton Power Station MKB/blf Attachments cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety

Geller

ATTACHMENT 1 CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month September 2003 None

D-.

ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 UNIT Clinton 1 DATE 09/30/03 COMPLETED BY M. K. Baetz TELEPHONE (217)937-2201 MONTH September 2003 1 1042 17 1018 2 _ 1041 18 1017 3 _ 1041 19 1019 4 _ 1041 20 1iR 5 _ 1040 21 1018 6 _ 1044 22 1017 7 831 23 1019 8 _ 1016 24 1019 9 _ 1009 25 1019 10 _ 1019 26 1019 11 _ 101R 27 1014 s s

_ 7 12 - 1019 28 1022 13 - 1018 29 1017 14 - 1019 30 1017 15 _ 1018 16 1018

11 ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO. 50-461 UNIT _ Clinton 1 DATE 09/30/03 COMPLETED BY M. K. Baetz TELEPHONE (217)937-2201 OPERATING STATUS

1. REPORTING PERIOD: September 2003 GROSS HOURS IN REPORT PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3473 MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 1022 DESIGN ELECTRICAL RATING (MWe-Gross): 1062
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6507.0 95.243.8
6. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
7. HOURS GENERATOR ON LINE 720.0 6494.4 93.083.9
8. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 4.0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.199.280 20.518.779 260.148.524.6
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 761.777.5 6.916.598.5 86.338.312
11. NET ELECTRICAL ENERGY GENERATED (MWH) 731.688 6.659.160.2 82.484.057
12. REACTOR SERVICE FACTOR 100.0% 99.3% 68.5%
13. REACTOR AVAILABILITY FACTOR 100.0% 99.3% 68.5%
14. UNIT SERVICE FACTOR 100.0% 99.1% 67.0%
15. UNIT AVAILABILITY FACTOR 100.0% 99.1% 67.0%
16. UNIT CAPACITY FACTOR (Using MDC) 109.3% 109.3% 63.8%
17. UNIT CAPACITY FACTOR (Using Design MWe) 99.9% 100.0% 58.4%
18. UNIT FORCED OUTAGE RATE 0.0% 0.0% 6.3%
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

TYPE DATE DURATION Refuel (Cl R09) 02/03/04 18 Days

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

ATTACHMENT 4 UNIT SHUTDOWNS DOCKET NO. 50-461 UNIT Clinton 1 DATE 09/30/03 COMPLETED BY M. K. Baetz REPORT MONTH SeDtember 2003 METHOD OF TYPE SHUTTING DOWN FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE F: SCHEDULED (HOURS) REASON (1) REDUCING POWER ACTIONS/COMMENTS (2)

NONE (1) Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D- Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)

(2) Method 1- Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain)