December 2002 Monthly Operating Report for Clinton Power Station
ML030170611
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/09/2003
From: Iliff W
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-603592
Download: ML030170611 (5)


Text

AmerGe An Exelon/British Energy Company Clinton Power Station R R. 3 Box 228 Clinton, IL 61727-9351 10CFR50 36 U-603592 January 9, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

December 2002 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending December 31, 2002.

Respectfully, W. S. Iliff Regulatory Assurance Manager Clinton Power Station MJS/blf Attachments cc:

Regional Administrator - NRC Region III NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety

ATTACHMENT 1 CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month December 2002 None

.4

.4.

ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-461 Clinton 1 12/31/02 M. J. Sloan (217)937-3280 December 2002 1025 1024 1022 1023 1023 1024 1025 1025 1024 1024 1025 1025 1025 1025 1025 1024 MONTH 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 1025 1026 1026 1025 1025 1024 1024 1025 1026 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1023 1024 1024 1025 1025 1025

ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO.

50-461 UNIT Clinton 1 DATE 12/31/02 COMPLETED BY TELEPHONE M. J. Sloan (217)937-3280 OPERATING STATUS

1.

REPORTING PERIOD:

December 2002 GROSS HOURS IN REPORT PERIOD: 744

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt)"

3473 MAX. DEPEND. CAPACITY (MDC) (MWe-Net):

1022 DESIGN ELECTRICAL RATING (MWe-Gross) 1062

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net).

None

4.

REASONS FOR RESTRICTION (IF ANY)

N/A NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

GROSS ELECTRICAL ENERGY GENERATED (MWH)

NET ELECTRICAL ENERGY GENERATED (MWH)

REACTOR SERVICE FACTOR REACTOR AVAILABILITY FACTOR UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (Using MDC)

UNIT CAPACITY FACTOR (Using Design MWe)

UNIT FORCED OUTAGE RATE THIS MONTH 744 0 00 744 0 00 2,357,135 0 789,659 5 762,212 1000%

1000%

1000%

1000%

110 2%

1007%

0 0%

YR TO DATE 7925 6 00 7805 8 00 24,112,406 7,976,0830 7,657,459 905%

905%

891%

891%

940%

890%

1.4%

CUMULATIVE 88,736 8 00 86,589 5 40 239,629,745 6 79,421,713 75,824,897 670%

670%

654%

654%

61.6%

56.3%

6 8%

19.

SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

TYPE DATE DURATION NONE

20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A 5

6.
7.

8 9

10.
11.
12.
13.
14.
15.
16.
17.

18.

ATTACHMENT 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT DATE COMPLETED BY REPORT MONTH December 2002 TYPE FORCED NO.

DATE F:

SCHEDULED DURATION (HOURS)

REASON (1)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)

CORRECTIVE ACTIONS/COMMENTS NONE (1)

Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)

(2)

Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain) 50-461 Clinton 1 12/31/02 M. J. Sloan