U-603580, August 2002 Monthly Operating Report for Clinton Unit 1
| ML022670041 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/11/2002 |
| From: | Iliff W AmerGen Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| U-603580 | |
| Download: ML022670041 (5) | |
Text
Amery Cn An Exelon/British Energy Company Clinton Power Station R.R. 3 Box 228 Clinton, IL 61727-9351 1 OCFR50.36 U-603580 September 11, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
August 2002 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending August 31, 2002.
Respectfully, 6k/.J.
- w. s. iif/z Regulatory Assurance Manager Clinton Power Station MJS/blf Attachments cc:
Regional Administrator - NRC Region III NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety
.--
ATTACHMENT 1 CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month Auqust 2002 None
ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-461 Clinton 1 08/31/02 M. J. Sloan (217)937-3280 Auaust 2002 1025 1027 1028 1027 1025 1029 1029 1029 1030 1030 1024 1027 1027 1029 1029 1030 1031 1031 1030 1030 MONTH 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1031 1030 1031 1032 1032 1031 1031 1030 1031 1031 1033
el--
ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO.
50-461 UNIT Clinton 1 DATE 08/31/02 COMPLETED BY TELEPHONE M. J. Sloan (217)937-3280 OPERATING STATUS
- 1.
REPORTING PERIOD:
Auqust 2002 GROSS HOURS IN REPORT PERIOD: 744
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3473 MAX. DEPEND. CAPACITY (MDC) (MWe-Net):
1022 DESIGN ELECTRICAL RATING (MWe-Gross):
1062
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
None
- 4.
REASONS FOR RESTRICTION (IF ANY):
N/A NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)
GROSS ELECTRICAL ENERGY GENERATED (MWH)
NET ELECTRICAL ENERGY GENERATED (MWH)
REACTOR SERVICE FACTOR REACTOR AVAILABILITY FACTOR UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (Using MDC)
UNIT CAPACITY FACTOR (Using Design MWe)
UNIT FORCED OUTAGE RATE THIS MONTH 744 0 0.0 744 0 0.0 2,447,134 0 797,663 5 765,868 1000%
1000%
1000%
1000%
110 7%
101.2%
0 0%
YR TO DATE 4996.6 00 4876.8 00 14,825,421 4,873,833 5 4,668,446 6 85 7%
857%
836%
836%
861%
830%
2 3%
CUMULATIVE 85,807.8 0.0 83,660 5 4.0 230,342,760 6 76,319,464 72,835,885 66.3%
663%
646%
646%
605%
553%
7.0%
- 19.
SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):
TYPE DATE DURATION NONE
- 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
18
ATTACHMENT 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT DATE COMPLETED BY A
50-461 Clinton 1 08/31/02 M. J. Sloan REPORT MONTH August 2002 TYPE FORCED NO.
DATE F:
SCHEDULED DURATION (HOURS)
REASON (1)
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)
CORRECTIVE ACTIONS/COMMENTS NONE (1)
Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)
(2)
Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain)