U-603622, May 2003 Monthly Operating Report for Clinton Unit 1
| ML031640146 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 06/05/2003 |
| From: | Iliff W AmerGen Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| U-603622 | |
| Download: ML031640146 (5) | |
Text
AmerGen An Exelon/British Energy Company Clinton Power Station R.R. 3 Box 228 Clinton, IL 61727-9351 I OCFR50.36 U-603622 June 5, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461 Supject:
May 2003 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending May 31, 2003.
Respectfully, W. S. I 2J e
Regulatory Assurance Manager Clinton Power Station MJSIbIf Attachments cc:
Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety 1S~A-
ATTACHMENT 1 CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month May 2003 None i
ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 50-461 Clinton 1 05/31/03 M. J. Sloan (2171937-3280 752 999 1013 1023 1022 1025 1032 1041 1042 1042 1040 1041 1042 1042 1043 May 2003 MONTH I
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 1025 1024 1026 1026 1024 1025 1023 1025 1024 1026 1026 1025 1025 1026 1026 1025 x-a J-w
ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO.
50-461 UNIT Clinton 1 DATE 05/31/03 COMPLETED BY TELEPHONE M. J. Sloan (217)937-3280 OPERATING STATUS
- 1.
REPORTING PERIOD:
May 2003 GROSS HOURS IN REPORT PERIOD: 744
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3473 MAX. DEPEND. CAPACTY (MDC) (MWe-Net):
1022 DESIGN ELECTRICAL RATING (MWe-Gross):
1062
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
None
- 4.
REASONS FOR RESTRICTION (IF ANY):
N/A
- 5.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 6.
REACTOR RESERVE SHUTDOWN HOURS
- 7.
HOURS GENERATOR ON LINE
- 8.
UNIT RESERVE SHUTDOWN HOURS
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)
- 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 11.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 12.
REACTOR SERVICE FACTOR
- 13.
REACTOR AVAILABILITY FACTOR
- 14.
UNIT SERVICE FACTOR
- 15.
UNIT AVAILABILITY FACTOR
- 16.
UNIT CAPACITY FACTOR (Using MDC)
- 17.
UNIT CAPACITY FACTOR (Using Design MWe)
- 18.
UNIT FORCED OUTAGE RATE THIS MONTH 744.0 0.0 744.0 0.0 2.348.812 787.779.0 758.477 100.0%
100.0%
100.0%
100.0%
109.6%
100.2%
0.0%
YR TO DATE 3579.0 0.0 3566.4 0.0 11.235.963.0 3.764.589.0 3.630.046.5 98.8%
98.8%
98.4%
-98.4%
107.7%/o 98.5%
0.0%
CUMULATIVE 92.315.8 0.0 90.155.9 4.0 250.865.708.6 83.186.302 79.454.944 67.90/
67.9%
66.3%
66.3%
62.8%
57.4%
6.5%
19
- SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):
TYPE DATE DURATION N/A
- 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
ATTACHMENT 4 UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY M. J. Sloan REPORT MONTH May 2003 TYPE FORCED NO.
DATE F:
SCHEDULED DURATION (HOURS)
REASON (1)
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)
CORRECTIVE ACTIONS/COMMENTS NONE (1)
Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)
(2)
Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain) 50-461 Clinton I 05/31/03
,,,I