U-603706, November 2004 Monthly Operating Report Clinton Power Station Unit 1
| ML043560181 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 12/14/2004 |
| From: | Lliff W AmerGen Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| U-603706 | |
| Download: ML043560181 (2) | |
Text
%-u.
-- ~
AmerG(en An Exelon Company Clinton Power Station R. R.3, Box 228 Clinton, IL 61727 1 OCFR50.36 U-603706 December 14, 2004 U. S. Nuclear Regulatory Commission ATTN:- Do-cinie`it C6ifrol Dek Washington, D.C. 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
November 2004 Monthly Operating Report Please find in the Attachment the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending November 30, 2004.
Respectfully, A/.S. a W. S. lliff Regulatory Assurance Manager Clinton Power Station
_JLP/blf Attachment cc:
Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector-Clinton Power Station Illinois Emergency Management Agency - Division of Nuclear Safety
.....................4
s 1OPERATING DATA REPORT Attachment to U-603706 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-461 Clinton 1 December 10, 2004 P. K. Ryan 217-937-2201 November 2004
- 1.
Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 1,062.00 1,022.00 This Month Yr-to-Date Cumulative
- 3.
Number of Hours the Reactor was Critical 720.00 7,391.65 104,810.20
- 4.
Number of Hours Generator On-line 720.00 7,168.61 102,393.34
- 5.
Reserve Shutdown Hours 0.00 0.00 4.00
~-
6:Net'Elfbtrcil 'Eery GGnierattd'(MWHri)_
758,516.00 7,217.959.78 91,741,846.48 UNIT SHUTDOWNS
SUMMARY
- The were no planned or forced losses in the month of November.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Challenges to Main Steam Safety Relief Valves: None 1
Page 1 of 1