November 2004 Monthly Operating Report Clinton Power Station Unit 1
ML043560181
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/14/2004
From: Lliff W
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-603706
Download: ML043560181 (2)


Text

%-u. -- ~

AmerG(en An Exelon Company Clinton Power Station R. R.3, Box 228 Clinton, IL 61727 10CFR50.36 U-603706 December 14, 2004 U. S. Nuclear Regulatory Commission ATTN:- Do-cinie`it C6ifrol Dek Washington, D.C. 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

November 2004 Monthly Operating Report Please find in the Attachment the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending November 30, 2004.

Respectfully, A/.S. a W. S. lliff Regulatory Assurance Manager Clinton Power Station

_JLP/blf Attachment cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector- Clinton Power Station Illinois Emergency Management Agency - Division of Nuclear Safety

,... .....................4

- s -- -

- 1OPERATING DATA REPORT Attachment to U-603706 DOCKET NO. 50-461 UNIT NAME Clinton 1 DATE December 10, 2004 COMPLETED BY P. K. Ryan TELEPHONE 217-937-2201 REPORTING PERIO November 2004

1. Design Electrical Rating 1,062.00
2. Maximum Dependable Capacity (MWe-Net) 1,022.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 7,391.65 104,810.20
4. Number of Hours Generator On-line 720.00 7,168.61 102,393.34
5. Reserve Shutdown Hours 0.00 0.00 4.00

~- 6:Net'Elfbtrcil 'Eery GGnierattd'(MWHri)_ 758,516.00 7,217.959.78 91,741,846.48 UNIT SHUTDOWNS

SUMMARY

The were no planned or forced losses in the month of November.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Challenges to Main Steam Safety Relief Valves: None

.. 1 Page 1 of 1