U-603681, June 2004 Monthly Operating Report,For Clinton Power Station
| ML042020338 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 07/12/2004 |
| From: | Lliff W AmerGen Energy Co, Exelon Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| U-603681 | |
| Download: ML042020338 (2) | |
Text
/
Amer~ens.
An Exelon Company Clinton Power Station R. R. 3, Box 228 Clinton, IL 61727 1 OCFR50.36 U-603681 July 12, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
June 2004 Monthly Operating Report Please find in the Attachment the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending June 30, 2004.
Respectfully, h/s X
W. S. Iliff Regulatory Assurance Manager Clinton Power Station JLP/bIf Attachment cc:
Regional Administrator - NRC Region ill NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Emergency Management Agency
OPERATING DATA REPORT Attachment to U-603681 DOCKET NO.
50 UNIT NAME Cli DATE Jul COMPLETED BY P.
TELEPHONE (21 REPORTING PERIOD:
-461 inton 1 ly 07, 2004 K. Ryan
- 17) 937-2201 June 2004
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,062.00 1,022.00 This Month Yr-to-Date Cumulative
- 3.
Number of Hours the Reactor was Critical 720.00 3,820.20 101,238.75
- 4.
Number of Hours Generator On-line 720.00 3,623.19 98,847.92
-5., Reserve Shutdown Hours.,
0.00 -
0.00
__ 4.00
- 6.
Net Electrical Energy Generated (MWHrs) 756,957.00 3,504,145.60 88,028,032.30 UNIT SHUTDOWNS Type Method of F: Forced Duration l Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- There were no planned or forced losses in June.
1 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain) 2 Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
I Challenges to Main Steam Safety Relief Valves: None I
Page 1 of 1