June 2004 Monthly Operating Report,For Clinton Power Station
ML042020338
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/12/2004
From: Lliff W
AmerGen Energy Co, Exelon Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-603681
Download: ML042020338 (2)


Text

/

Amer~ens.

An Exelon Company Clinton Power Station R. R. 3, Box 228 Clinton, IL 61727 10CFR50.36 U-603681 July 12, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

June 2004 Monthly Operating Report Please find in the Attachment the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending June 30, 2004.

Respectfully, h/s X W. S. Iliff ' ' :

Regulatory Assurance Manager Clinton Power Station JLP/bIf Attachment - --

cc: Regional Administrator - NRC Region ill NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Emergency Management Agency

OPERATING DATA REPORT Attachment to U-603681 DOCKET NO. 50 -461 UNIT NAME Cliinton 1 DATE Jully 07, 2004 COMPLETED BY P. K. Ryan TELEPHONE (2117) 937-2201 REPORTING PERIOD: June 2004

1. Design Electrical Rating 1,062.00
2. Maximum Dependable Capacity (MWe-Net) 1,022.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 3,820.20 101,238.75
4. Number of Hours Generator On-line 720.00 . 3,623.19 98,847.92

-5., Reserve Shutdown Hours., 0.00 - - 0.00 __ 4.00 -

6. Net Electrical Energy Generated (MWHrs) 756,957.00 3,504,145.60 88,028,032.30 UNIT SHUTDOWNS Type Method of F: Forced Duration l Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

There were no planned or forced losses in June.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

I Challenges to Main Steam Safety Relief Valves: None I

Page 1 of 1