U-603583, September 2002 Monthly Operating Report for Clinton Power Station
| ML022940500 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 10/09/2002 |
| From: | Iliff W AmerGen Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| U-603583 | |
| Download: ML022940500 (5) | |
Text
Amerge n An Exelon/British Energy Company Clinton Power Station R.R 3 Box 228 Clinton, IL 61727-9351 1 OCFR50.36 U-603583 October 9, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
September 2002 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending September 30, 2002.
Respectfully, W.<
W.'S. "ll~fff Regulatory Assurance Manager Clinton Power Station MJS/blf Attachments cc:
Regional Administrator - NRC Region III NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety P
ATTACHMENT 1 CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month September 2002 None
ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-461 Clinton 1 09/30/02 M. J. Sloan (217)937-3280 September 2002 1019 1019 1019 1019 1020 1019 1019 843 1015 1011 1020 1019 1019 1022 1020 1020 MONTH 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1019 1019 1020 1019 1019 1021 1020 1020 981 1061 1018 1019 1019 1018
ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO.
50-461 UNIT Clinton 1 DATE 09/30/02 COMPLETED BY TELEPHONE M. J. Sloan (217)937-3280 OPERATING STATUS
- 1.
REPORTING PERIOD:
September 2002 GROSS HOURS IN REPORT PERIOD: 720
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3473 MAX. DEPEND. CAPACITY (MDC) (MWe-Net):
1022 DESIGN ELECTRICAL RATING (MWe-Gross):
1062
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
None
- 4.
REASONS FOR RESTRICTION (IF ANY):
N/A NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)
GROSS ELECTRICAL ENERGY GENERATED (MWH)
NET ELECTRICAL ENERGY GENERATED (MWH)
REACTOR SERVICE FACTOR REACTOR AVAILABILITY FACTOR UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (Using MDC)
UNIT CAPACITY FACTOR (Using Design MWe)
UNIT FORCED OUTAGE RATE THIS MONTH 720 0 00 720 0 00 2.326,5070 759,760 5 729,480 1000%
1000%
1000%
100 0%
1089%
996%
00%
YR TO DATE 5716.6 00 5596.8 00 17,151,928 5,633,594 0 5,397,9266 872%
87.2%
854%
854%
886%
849%
20%
CUMULATIVE 86,527.8 00 84,380 5 40 232,669,267 6 77,079,224 73,565,365 665%
665%
648%
648%
608%
556%
6 9%
- 19.
SHUTDOWNS SCHEDULED OVER NEXT SIX EACH):
TYPE DATE NONE MONTHS (TYPE, DATE, DURATION OF DURATION
- 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
- 5.
- 6.
- 7.
- 8.
- 9.
10
- 11.
- 12.
13 14
- 15.
16
- 17.
18.
ATTACHMENT 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT DATE COMPLETED BY M. J. Sloan REPORT MONTH September 2002 TYPE FORCED NO.
DATE F:
SCHEDULED DURATION (HOURS)
REASON (1)
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)
CORRECTIVE ACTIONS/COMMENTS 1
9/8/02 S
18 hrs B
1 Downpower for required surveillances and rod sequence exchange. Performed 9031.07, Turbine Control Valve Testing, which must be performed at 60% power.
(1)
Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)
(2)
Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain) 50-461 Clinton 1 09/30/02