AmerGen An Exelon/British Energy Company Clinton Power Station R.R. 3 Box 228 Clinton, IL 61727-9351 10CFR50.36 U-603568 July 11, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

June 2002 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending June 30, 2002.

Respectfully, W.

W . S. IlIf Regulatory Assurance Manager Clinton Power Station MJS/blf Attachments cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety

"ý'ýý")2'ý+

ATTACHMENT 1 CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month June 2002 None

ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 UNIT Clinton 1 DATE 06/30/02 COMPLETED BY M. J. Sloan TELEPHONE (217)937-3280 MONTH June 2002 1 1013 17 1034 2 1014 18 1023 3 1012 19 1025 4 1010 20 1026 5 1012 21 1026 6 1013 22 1026 7 1013 23 1027 8 1012 24 1025 9 1013 25 1025 10 1011 26 1027 11 1012 27 1028 12 1014 28 1031 13 1016 29 1030 14 1018 30 1029 15 1020 16 1011

ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO. 50-461 UNIT Clinton 1 DATE 06/30/02 COMPLETED BY M. J. Sloan TELEPHONE (217)937-3280 OPERATING STATUS

1. REPORTING PERIOD: June 2002 GROSS HOURS IN REPORT PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3473 MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 1022 DESIGN ELECTRICAL RATING (MWe-Gross): 1062
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS YR TO DATE CUMULATIVE MONTH
5. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 3534.4 84,345.6
6. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
7. HOURS GENERATOR ON LINE 720.0 3429.3 82,213.0
8. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 4.0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,336,265.0 10,094,633 225,611,972.6
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 764,434.0 3,335,794.0 74,781,424
11. NET ELECTRICAL ENERGY GENERATED (MWH) 734,215 3,192,997.3 71,360,435
12. REACTOR SERVICE FACTOR 100.0% 81.4% 65.9%
13. REACTOR AVAILABILITY FACTOR 100.0% 81.4% 65.9%
14. UNIT SERVICE FACTOR 100.0% 78.9% 64.2%
15. UNIT AVAILABILITY FACTOR 100.0% 78.9% 64.2%
16. UNIT CAPACITY FACTOR (Using MDC) 109.6% 79.0% 60.0%
17. UNIT CAPACITY FACTOR (Using Design MWe) 100.3% 77.6% 54.8%
18. UNIT FORCED OUTAGE RATE 0.0% 2.1% 7.1%
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

TYPE DATE DURATION NONE

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

ATTACHMENT 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461 UNIT Clinton 1 DATE 06/30/02 COMPLETED BY M. J. Sloan REPORT MONTH June 2002 METHOD OF TYPE SHUTTING DOWN FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE F: SCHEDULED (HOURS) REASON (1) REDUCING POWER ACTIONS/COMMENTS (2)

NONE (1) Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)

(2) Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain)