Interim Deficiency Rept CP-86-69 Re Failure to Incorporate Restraining/Support Requirements Into Project Procedures & Specs.Initially Reported on 861002.Evaluation to Determine IEEE 420 Applicability Underway.Next Rept by 861219
ML20211H181
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/28/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-69, TXX-6066, NUDOCS 8611050013
Download: ML20211H181 (1)


Text

--

Log # TXX-6066 File # 10110 908.1 TEXAS UTILITIES GENERATING. COMPANY October 28, 1986 EMEhff?5E

  • kk Mr. Eric H. Johnson, Director L[. :I. 0CT 311986 p, Division of Reactor Safety and Projects ..'1 U. S. Nuclear Regulatory Commission d! ~{

611 Ryan Plaza Drive, Suite 1000 __________--

Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 SUPPORT OF CLASS 1E WIRING SDAR: CP-86-69

Dear Mr. Johnson:

On October 2,1986, we verbally notified your Mr. I. Barnes.of a deficiency regarding the failure to incorporate specific restraining / support requirements defined by IEEE Standard 420-1973, " Class 1E Control Switchboards," into project specifications and procedures. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

An engineering evaluation is in process which will determine the applicability of IEEE 420 to specific equipment. This includes an equipment qualification report review to determine if unsupported field cables were installed during seismic testing and a procedural review to determine if deficiencies exist in prescribing support / restraint requirements.

After the defined evaluations and reviews are completed, an equipment inspection will be performed to identify non-conforming equipment (if any).

We anticipate submitting our next report on this issue no later than December 19, 1986.

Very truly yours, hl 8611050013 e61028 W. G. Counsil PDR ADOCK.05000445 S PDR DAR/amb c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)