TXX-4812, Interim Deficiency Rept CP-86-34 Re Anomalies Observed in Class 1E Inverters Supplied by Elgar Corp & Installed in Ac Distribution Sys.Evaluation Continuing.Submittal of Next Rept Anticipated by 860627

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-34 Re Anomalies Observed in Class 1E Inverters Supplied by Elgar Corp & Installed in Ac Distribution Sys.Evaluation Continuing.Submittal of Next Rept Anticipated by 860627
ML20198E885
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 05/19/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-34, TXX-4812, NUDOCS 8605280318
Download: ML20198E885 (1)


Text

Log # TXX-4812

, File # 10110

).:

TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER

  • 400 NORTM OIJVE STREET, L.B. El
  • DALLAS, TEXAS 78301 May 19, 1986 ONL* S?2CEh Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000

, Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NO. 50-445 UPS INVERTERS SDAR: CP-86-30 (INTERIM REPORT)

Dear Mr. Johnson:

On April 18, 1986, we verbally notified your Mr. R. Hall of a deficiency involving anomalies observed in Class 1E inverters supplied by Elgar Corporation of San Diego. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). These inverters are installed in the AC distribution system in Unit 1.

We are continuing our evaluation and anticipate submitting our next report by June 27, 1986.

Very truly yours, i

W. G. Counsil JCH/grr c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8605280318 DR 860519 ADOCK 05000445 PDR h

A DiVENION OF TEXA8 UT1LITIES REACTRIC COMPANY