TXX-4529, Interim Deficiency Rept SDAR-180 Re Use of Nonrepresentative Sample in Determining Generic Values for Typical Conduit Span Calculations.Initially Reported on 850515.Evaluation Continuing.Completion Anticipated by 850906

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept SDAR-180 Re Use of Nonrepresentative Sample in Determining Generic Values for Typical Conduit Span Calculations.Initially Reported on 850515.Evaluation Continuing.Completion Anticipated by 850906
ML20137A613
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/09/1985
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-180, TXX-4529, NUDOCS 8508210440
Download: ML20137A613 (1)


Text

,

TEXAS UTILITIES GENERATING COMPANY NKT WAT 18 9WICH

  • 400 Nititill 4)R.IV E MTH EET. L.H. nl
  • lt48. LAM. TE A AM T3208
  • August 9,

.SM*Jaf?J.7.".'A 1985 TXX-4529 Mr. D.R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION CONDUIT SUPPORT SPANS I QA FILE: CP-85-19, SDAR-180 j FILE NO.: 10110 l

Dear Mr. Hunter:

On May 15, 1985 we verbally notified your Mr. D. Hunnicutt of a deficiency regarding the use of a nonrepresentative sample in determining generic values for typical conduit span calculations. We have submitted an interim report logged TXX-4489, dated June 11, 1985.

I We are continuing our evaluation and anticipate completion by September 6, 1985.

Very truly yours,

.2 /[/ @

W.G. Counsil WGC:tig 1

cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission @ @ @ [](\//[h' p

q #

Washington, DC 20555 pl

~

AUG 121985 n! .

,l1 ll g .

.a l

S 3C'M l g6-1Iq A ists'instDN tbt* IKRA N t'Til.ittKn Et,Kt'TNit' t'esMi*AN Y

,g l

L