ML20141A10831 March 1986Part 21 Rept 134 Re Potential Defect in K-1 Relay in Generator Voltage Regulator.Initially Reported on 860219. Corrective Action Must Take Into Account Equipment Operating Range of 100-137.5-volt Dc
ML20153G10219 February 1986Part 21 Rept Re Potential Defect in K-1 Relays of Dsr or Dsrv Standby Diesel Generators Mfg by Gould/Ite.Relays Have Incorrect Voltage Range.Dc Voltage Source or Voltage Regulator Circuitry Requires Mod
ML20087J6668 March 1984Followup Part 21 Rept Re Nuclear Valve/Actuator Stroking Time Possibly Lengthened Beyond 15 When Using hydrocarbon-based Lubricants.Ltrs to Affected Utils EnclStroke time
ML20078B3816 September 1983Part 21 Rept Re Matrix Actuator Model 33122-SR 80.Mounting Bolts Loosened & Spring Return Cylinder Began to Separate from Ctr Body of Actuator.Investigation Being Conducted by Xomox Corp
ML20083L97527 May 1983Part 21 Rept Re Failure of Circuit Breakers During Environ Testing.Test Results Indicate That Temp Sensitivity Problem May Be Generic to All Ite Imperial Corp thermal-magnetic Circuit Breakers Calibr for 40 C Svc
ML20076H16023 May 1983Pt 21 Rept Re Potential Defect in Transmitter Mfg by Rosemount,Inc Used in Control Sys Components Furnished to Listed Plants.All Components Involved Retrofitted W/New Circuit Boards.Matter Closed
ML20074A20426 April 1983Interim Deficiency Rept Re Misapplication of Ite Gould Circuit Breakers in post-LOCA Hydrogen Recombiners Supplied by Rockwell Intl.Initially Reported on 830328.Matter Under Investigation.Final Rept by 830808.Reported Per Part 21
ML20074A22211 March 1983Part 21 Rept Re Failure of post-LOCA Hydrogen Recombiner Component During IEEE-323 Qualification Program.Circuit Breaker Not Properly Selected for Specific Application.Plant Operators Notified of Deviation
ML20055A0737 July 1982First Interim Deficiency Rept Re Nonconformance in Intake Pumping Station Door & Hatch Design,Initially Reported 820604.Final Rept Will Not Be Issued Until Decision to Resume Facility Const Reached
ML20054J91123 June 1982Part 21 Rept Re Potential Defect in Couplings Drive Element of Dsrv or Dsr Standby Diesel Generator.Affected Licensees Will Be Notified No Later than 820715
ML20054K15323 June 1982Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects
ML20054H68218 June 1982Part 21 Rept Re Pneumatic Actuator Yoke Failure.List of Other Projects W/Similar Equipment Encl
ML20054G11211 June 1982Fourth Interim Deficiency Rept Re Link Rod assembly-Delaval Diesels.Due to Const Deferment Final Deficiency Rept Will Not Be Issued Pending Final Decision on Future of Projects. Also Reportable Per Part 21
ML20053E12028 May 1982Second Interim Deficiency Rept Re Check Valve Leak in Air Start Sys of Standby Diesel Generators,Initially Reported 820209.Evaluation by Vendor Underway.Also Reported Per Part 21
ML20052A60719 April 1982Suppl to Final Deficiency Rept Re Standby Gas Treatment Sys Charcoal Absorber,Initially Reported 800508.Util Unable to Meet Corrective Action Completion Date in 811209 Final Rept Due to Deferral of Const.Also Reported Per Part 21
ML20054B1102 April 1982Fifth Interim Deficiency Rept Re Review of Purchase Request Forms Initiated by Const,Initially Reported 810520.Util in Process of Analyzing Deficiencies.Next Rept Expected by 820715
ML20054B4931 April 1982Fifth Interim Deficiency Rept Re Pressure Drop in Svc Water Piping,Initially Reported on 801210.Deficiency Still Being Evaluated.Next Rept Will Be Provided by 820715
ML20050B5991 April 1982Fifth Interim Rept Re Pressure Drop in Essential Svc Water Piping,Originally Reported 801210.Util Still Evaluating Deficiency.Next Rept by 820715
ML20054B1071 April 1982Fifth Interim Deficiency Rept Re Completion of as-built Drawings,Initially Reported 820122.Evaluation Still in Progress.Next Rept Expected by 820715
ML20054B15029 March 1982First Interim Deficiency Rept Re SA 312 Pipe Less than Min Wall Thickness Mfg by Itt Grinnell,Initially Reported on 820219.All Loose Matl at Jobsite Replaced by Original Matl Supplier.Also Reported Per Part 21
ML20050B02219 March 1982Final Deficiency Rept 2 Re Failure of Transamerica Delaval to Correct Violations Identified During Audits 79V-38 & 80V-39 Promptly,Due to Improper QA Program Implementation, Initially Reported on 820114.Also Reported Per Part 21
ML20041F7565 March 1982Fourth Interim Deficiency Rept Re GE Support of 10CFR50.55(e),initially Reported 810810.Util Awaiting Addl Clarification from Nrc.Next Rept Expected by 820930
ML20049J4393 March 1982First Interim Deficiency Rept Re Check Valve Leak in Air Start Sys of Standing Diesel Generators,Initially Reported on 820209.Problem Under Investigation by Vendor.Next Rept Expected by 820528.Also Reported Per Part 21
ML20049J45825 February 1982Suppl Deficiency Rept Re High Pressure Core Spray Component Wiring Discrepancies.Util Unable to Complete Corrective Actions by 820205 as Committed in 811116 Ltr.Drawings Require Vendor Revisions.Drawings Expected by 820805
ML20049J48725 February 1982Final Deficiency Rept Re Failure to Hydrotest Mechanical Penetration Assemblies,Originally Reported on 810814.STRIDE Spec 400-09 Revised.Also Reported Per Part 21Hydrostatic
ML20071H59919 February 1982Final Deficiency Rept Re Fillet Weld Misspec for Skewed Tee Joints,Initially Reported 801208.Nonconforming Welds Redesigned to Conform to American Inst of Steel Const & Aws Requirements.Drawing Revised & Reissued
ML20069C00416 February 1982Fourth Interim Deficiency Rept Re Review of Purchase Request Forms Initiated by Const,Initially Reported on 810520.Batch Search Performed to Locate Forms.Results Being Transmitted for Review.Next Rept Expected by 820402
ML20071H30612 February 1982Fourth Interim Deficiency Rept Re SGTS Design Deficiency, Initially Reported on 801212.Problem Will Be Resolved by Enlarging Size of Water Drains or Placing Timer on Spray Sys.Also Reported Per Part 21
ML20041A42410 February 1982Deficiency Rept Re Failure of Transamerica Delaval to Promptly Correct Deficiencies,Initially Reported 820114. Deficiency Sheet Discussed W/Delaval Mgt.Next Rept by 820320.Also Reported Per Part 21
ML20040E53227 January 1982Third Interim Deficiency Rept Re Reactor Core Isolation Cooling Steam Line Break,Initially Reported 810630.Util Still Investigating GE Proposed Solution to Add 1-inch Bypass to Limit Downstream Flow in Event of Rupture
ML20040E67127 January 1982Third & Final Supplemental Deficiency Rept Re Reactor Pressure Vessel Shroud Head & Moisture Separator Assembly Fire,Initially Reported on 800613.Cleanup Program Completed. Assembly Will Operate as Designed
ML20040E64326 January 1982Fifth Interim Deficiency Rept Re Alleged Atlas Machine & Iron Works Falsification of QA Documentation Packages for Nine Drywell Framed Embedments,Initially Reported on 810528. Welding Tests Will Be Verified.Next Rept Due by 820618
ML20040C58218 January 1982Fourth Interim Deficiency Rept on Deficiency 14 & Final Rept on Deficiency 21 Re Completion of as-built Drawings, Initially Reported 810122.Unit-unique as-built Drawing Program Being Investigated.Addl Rept by 820331
ML20040C70818 January 1982First Interim Deficiency Rept Re Possible Out of Phase Transfer of Emergency Bus for Stride Design,Initially Reported 811218.GE Studying Design Change to Resolve Problem.Next Rept Will Be Submitted by 830301
ML20039F3885 January 1982Third Interim Deficiency Rept Re Failure of GE to Advise Util of GE-initiated Potentially Reportable Conditions Concerning NSSS Stride Design Deficiency Repts,Initially Reported 810810.Next Rept Will Be Submitted by 820305
ML20040G82031 December 1981Geologic Foundation Rept,Fault Descriptions, Revision 2
ML20069B30017 December 1981Fifth Interim Deficiency Rept Re Rosemount Model 1152 & 1151 Pressure Transmitters,Initially Reported 800603. Investigation of Use of Transmitters Continuing.Next Rept by 820622
ML20069B27416 December 1981Fourth Interim Deficiency Rept Re Failure by Itt Grinnell to Use Proper Testing Methods,Initially Reported 810304.Vendor to Perform Magnetic Particle or Liquid Penetrant Insps & Nondestructive Exams on Fittings.Next Rept by 820622Liquid penetrant
ML20062N09010 December 1981First Interim Deficiency Rept Re Atlas 811013-16 QA Documentation for Auxiliary Fuel Bldg Structural Steel, Initially Reported on 811113 & 1204.Independent Steel Evaluation Underway.Next Rept Due by 820520
ML20039C1359 December 1981Revised Final Deficiency Rept Re Separation of Standby Gas Treatment Sys Charcoal Adsorber Perforated Screens,Initially Reported 800508.Screen to Frame Separations Will Be Repaired by 820405.Also Reported Per Part 21
ML20062M9128 December 1981Final Deficiency Rept Re Laminated 2-inch Diameter Steel Rods from Federal Pipe & Steel Corp,Initially Reported on 810911.Cracks Caused by Imperfections in Dies Used in Fabrication.Rods Approved.Also Reportable Per Part 21
ML20011A66115 October 1981Final Deficiency Rept Re Defective Diesel Engine Oil Plugs, Initially Reported 810630.Transamerica Delaval Will Perform Required Insp & Repair at Site During Unpackaging & Installation of Diesel.Also Reportable Per Part 21
ML20010J64030 September 1981Second Interim Deficiency Rept Re Reactor Core Isolation Cooling Steam Line Break,Initially Reported on 810630.Also Reportable Per Part 21.Corrective Action Will Be Submitted by 820129
ML20010J51929 September 1981Final Deficiency Rept Re Standby Gas Treatment Sys Charcoal Adsorber,Initially Reported 800508.Perimeter of Perforated Screens Will Be Seal Welded by 811204.Also Reported Per Part 21
ML20010J27423 September 1981First Interim Deficiency Rept Re Incorrect QC Evaluation of Fillet Welds,Initially Reported on 810824.Reinspection Revealed 252 Unacceptable Welds.Util Will Determine Corrective Actions.Next Rept Provided by 810203
ML20010J12121 September 1981Fourth Interim Deficiency Rept Re Inadequate Welds on Embedded Pipe Sleeves to Plates,Initially Reported 801024. Deferral of Const Activities Has Not Allowed Significant Progress to Be Made on Problem.Final Rept by 820702
ML20010J08721 September 1981First Interim Deficiency Rept Re Incorrect Transmitters in Reactor Pressure Vessel Water Level Scram Units,Initially Reported 810820.Also Reportable Under Part 21.All Incorrect Transmitters & Trip Units Will Be ReplacedReactor Vessel Water Level
ML20010H40715 September 1981First Interim Deficiency Rept Re Failure to Hydrotest Mechanical Penetration Assemblies,Initially Reported 810814. GE Evaluating Deficiency to Determine Corrective Action.Next Rept by 820206.Also Reported Per Part 21
ML20010G89114 September 1981Final Deficiency Rept Re Reinforcing Bars Omitted from Radwaste Bldg Concrete Pour,Initially Reported on 810814. Commentary to QC Instruction C-207 Issued Which Provides Uniform Interpretation of Installation & Erection & QC
ML20010G63614 September 1981Final Deficiency Rept Re Crosby Safety Relief Valve Solenoids,Also Reportable Per Part 21.Assemblies Will Be Inspected Using Stricter Acceptance Criteria.Corrective Actions Will Be Completed by 840731