ML20040E671

From kanterella
Jump to navigation Jump to search
Third & Final Supplemental Deficiency Rept Re Reactor Pressure Vessel Shroud Head & Moisture Separator Assembly Fire,Initially Reported on 800613.Cleanup Program Completed. Assembly Will Operate as Designed
ML20040E671
Person / Time
Site: Phipps Bend Tennessee Valley Authority icon.png
Issue date: 01/27/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8202050228
Download: ML20040E671 (1)


Text

TENNESSEE VALLEY AUTHORITY 60- fr3 l CHATTANOOGA, TENNk,bhe%pg g ,q{,', ,,

400ChestnutStreet^ Tower,Ilj{.

27, 1982 January?d FEB l ng*50 m Mr. James P. O'Reilly, Regional Administrator *

(p\ \

U.S. Nuclear Regulatory Commission '-

4 Region II - Suite 3100 > UCCi:; ?l0 g,

v-101 Marietta Street {/

Atlanta, Georgia 30303  % gyD u4

' }932n 5bg m

Dear Mr. O'Reilly:

N/3"P'59.P.. 'g.1 .Tvv$

PHIPPS BEND NUCLEAR PLANT UNIT 1 - REPORTABLE DEFICIENCY - RPV? /?'

SHROUD HEAD AND MOISTURE SEPARAT0P ASSEMBLY FIRE (NCR PBNP-106}'- ,7- '

SUPPLEMENTAL REPORT Initial notification of the subject deficiency was made to NRC-0IE, Region II, Inspector R. W. Wright on June 13, 1980. The final report was submitted on December 19, 1980. The first and second supplemental reports were submitted on May 21 and September 3, 1981, respectively. In accordance with 10 CFR 50.55(e) this letter constitutes our third supplemental report and finalizes TVA's response on this matter.

The shroud head and moisture separator asse.9tbly cleanup program has been successfully completed. GE has assured TVA that the assembly will operate as designed. The detailed results of the assembly cleanup program are located for NRC inspection in the BWR Sectior of the TVA Regulatory Staff, 400 Chestnut Street Tower II, Chattanooga, Tennessee.

A seven-day extension was discussed with and approved by NRC-0IE Inspector Austin Hardin on January 7, 1982; a five-day extension was discussed with Charles Burger on January 14, 1982. An additional seven-day extension was discussed with and approved by F. S. Cantrell on January 19, 1982. If you have any questions, please call Jim Domer at FTS 858-2725.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Man ger Nuclear Regulation and Safety cc: Mr. R. C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

-~g

. moral COPY -

8202050228 820127 DR ADOCK 05000 An Equai opportunity Employer ]{g Ab