First Interim Deficiency Rept Re Nonconformance in Intake Pumping Station Door & Hatch Design,Initially Reported 820604.Final Rept Will Not Be Issued Until Decision to Resume Facility Const Reached
ML20055A073
Person / Time
Site: 05000000, Hartsville, Phipps Bend
Issue date: 07/07/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8207150451
Download: ML20055A073 (2)


Text

-

TENNESSEE VALLEY AUTHORITY ,

CH ATTANOOGA, TENNESS'EE 7 1 400 Chestnut Street TowerI II

-,i..,./

Julg,,,1q82 I? Av 3a

~

HTRD-50-518/82-15, -520/82-15 ' '

  • PBRD-50-553/82-10 U.S. Nuclear Regulatory Commission Region II ATTN: James P. O'Reilly, Regional Administrator 101 M uletta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

HARTSVILLE NUCLEAR PLANT A AND PHIPPS BEND NUCLEAR PLANT UNIT 1 -

REPORTABLE DEFICIENCY - INTAKE PUMPING STATION DOORS' AND HATCHES' DESIGN

-HTRD-50-518/82-15, -520/82-15, - PBRD-50-553/82-10 The subject deficiency was initially reported to NRC-0IE, Region II, Inspector Ross Butcher on June 4, 1982. In accordance with paragraph 50.55(e) of 10 CFR Part 50, we are enclosing the first interim report on the subject deficiency.

TVA has elected to defer construction activities for these projects.

Deferral does not mean that the projects will be cancelled but that TVA is minimizing its expenditures and construction efforts until such time that TVA has sufficient information to indicate whether these projects should be completed or cancelled. Therefore, we will not be submitting a final report for this nonconformance until a final decision is made regarding these projects. If have any questions, please call Jim Domer at FTS 858-2725.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M.' Mills, M nager Nuclear Licens ng Enclosure cc: Mr. R. C. DeYoung, Director (Enclosure) l Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 .

8207150451 820707 i QFFICIAL COPY PDR ADOCK 05000518 L._ . . . -- - -

O PDR An Equal Opportunity Employer

i .

ENCLOSURE HARTSVILLE NUCLEAR PLANT A AND PHIPPS BEND NUCLEAR PLANT INTAKE PUMPING STATION DOORS' AND HATCHES' DESIGN 10CFR50.55(e) REPORT NO. 1 (INTERIM)

HTRD-50-518/82-15, -520/82-15 PBRD-50-553/82-10 Description of Deficiency The igtake pumping station concrete structure was designed for three lb/in pressure differential; h'owever, the doors and hatches were not.

The design of doors and hatches to withstand tornado-induced depressurization was not addressed in any design criteria; therefore, they were overlooked during the original design of the intake pumping station.

Interim Progress Due to the deferral of HTN and PBN, reports on these NCRs will be postponed until the time that construction is resumed.