First Interim Deficiency Rept Re SA 312 Pipe Less than Min Wall Thickness Mfg by Itt Grinnell,Initially Reported on 820219.All Loose Matl at Jobsite Replaced by Original Matl Supplier.Also Reported Per Part 21
ML20054B150
Person / Time
Site: 05000000, Hartsville, Phipps Bend
Issue date: 03/29/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8204160353
Download: ML20054B150 (2)


Text

. . __ _ __ _ _

- , f 9

TENNESSEE VALLE.Y AUTHORITY

. ,R F C ? C ' ,

CHATTANOOGA. TENNESSEE 374of 400 Chestnut Street Towef II'

" E h 1g82 All : 0,:

HTRD-50-518/82-10, -519/82-09,

-520/82-10, -521/82-09 9 N,,/

PBRD-50-553/82-09, -554/82-09 9 m / q U.S. Nuclear Regulatory Commission 9 9.C//;;{U g h'#

9 \

Region II 2 p.

ATTN: James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 L b,9 03 g\#gg'[g S ' i; Atlanta, Georgia 30303 #FV /

0) j

Dear Mr. O'Reilly. g,

f/

HARTSVILLE AND PHIPPS BEND NUCLEAR PLANTS - REPORTABLE DEFICIENCY -

SA 312 PIPE LESS THAN MINIMUM WALL THICKNESS BY ITT GRINNELL -

HTRD-50-518/82-10, -519/82-09, -520/82-10, -521/82 PBRD-50-553/82-09, -554/82-09 The subject deficiencies were initially reported to NRC-0IE, Region II, j Inspector Ross Butcher on February 19, 1982 as NCR-8. In accordance with paragraph 50.55(e) of 10 CFR Part 50, we are enclosing the first interim report. We consider 10 CFR Part 21 applicable to this nonconformance.

4 As discussed with Austin Hardin on March 22, 1982, a one-week extension was granted on the submittal of this report. We anticipate transmitting

': our next report on or before August 23, 1982. If you have'any questions, please call Jim Domer at FTS 858-2725.

t Very truly yours, TENNESSEE VALLEY AUTHORITY

, -( s

\ .

Mi ills, ana -

Nuclear Regulation and Safety

! Enclosure cc: Mr. R. C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission l Washington, DC 20555 i

l pg1]CLE cop _

~

8204160353 820329 PDR ADOCK 05000518 8 S PDR An Equal Oppostunity Employer j

'l J

4 s

HTRD-50-518/82-10, -519/82-09

-520/82-10, -521/82-09 PBRD-50-553/82-09, -554/82-09 i

~

i ENCLOSURE HARTSVILLE AND PHIPPS BEND NUCLEAR PLANTS ~

SA 312 PIPE WITH LESS THAN MINIMUM WALL THICKNESS BY ITT GRINNELL 10CFR50.55(e) REPORT NO. 1 (INTERIM)

NCR-8 Description of Deficiency During normal shop inspection, several pieces of SA 312 (10-3/.4" x .365")

pipe supplied by ITT Grinnell of Kernersville, North Carolina,

, were found with wall thicknesses adjacent to the seam weld less than the minimum allowed by the ASME specifications governing wall thickness.

These pieces were made from pipe supplied to ITT Grinnell by Swepco Tube.

j Corporation, Clifton, New Jersey. Fifty-five spools and 342 feet of loose material were shipped to the site before discovery of this problem.

Interim Progress All material identified was ultrasonically inspected in the field. The inspection was performed on the longitudinal seam welds by ITT Grinnell personnel. A total of ten fabricated spools and five random lengths of loose material were identified as being below minimum wall thickness.

, After consulting with ITT Grinnell, all the loose material at the jobsite was replaced by the original material supplier. TVA was also informed that the defective sections within the fabricated spools would be cut out

and returned to Swepco to be rewelded.