TENNFSSEE VALLEY AUTHORITY CHATTANOOGA. TENNESS g 37401 400 Chestnut Street Tower II g <,c o 1:
Ib:
September 15, 1981 HTRD-50-518/81-22, -519/81-18
-520/81-20, -521/31-18
.,._3 g
PBRD-50-553/81-24 -553/81-18 s.-
> /'/
4
$ h
.9; s.
Mr. James P. O'Reilly, Director b/
't 4
f Office of Inspection and Enforcement l
k3(j/%
~ '
U.S. Nuclear Regulatory Commission j
Region II - Suite M OO E
Qf Atlanta, Georgia 30303 Q' N,g
'O 1
101 Marietta Street
?
g h'
Q i !'
'Y
Dear Mr. O'Reilly:
~-
HARTSVILLE AND PHIPPS BEMD NUCLEAR PLANTS - REPORTABLE DEFICIENCY -
FAILURS T') HiDROTEST MECHANICAL PENETRATION ASSEMBLIES -HTRD-50-518/81-22,
-519/81-18, -520/81-20, -521/81 PBRD-50-553/81-24, -554/81-18 Initia1' notification of the subject deficiency was made to NRC-0IE, Region II, Inspector P. A. Taylor on August 14, 1981 as NCR HTA QEB 8101, HTB 0FB 8101, and FBN QEB 8102.
In compliance with paragraph 50.55(e),of 10 CFR Part. 50, we are enclosing the first interim report on the subject deficiency..We consider 10 CFR Part 21 applicable to this nonconformance. The original submittal date
~
to NRC was Jeptember 14, 1981. As discussed witP P. A. Taylor on September 14, 1981, TVA was not able to meet tf.at date.- TVA anticipates transmitting the next report ontor before Februaryc6', 198E..-If you have any questions rea.r.rding. this subject,.plaase call Jim Domer at FTS 857-2014 Very truly yours, TENNESSEE VALLEY AUTHORITY
,o L. M. Mills,. Manager Nuclear Regulation and Safety Enclosure ec:
Mr. Victor Stello, Director 1(Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 re/>7
/
I
~
8109240430 810915 l
PDR ADOCK 05000518 E
EE' An Equal Opportun'ity Employer J
, a,. - -
r.
9 ENCLOSURE PARTSVILLE AND PHIPPS BEND NUCLEAR PLANTS FAILURE TO HYDROTEST MECHANICAL PENETRATIC" ASSE"BLIES' FTRD-50-518/81-22, -519/81-18, -520/81-20, -521/8 :-18 PBBD-50-553/81-24, -554/81-18 10CFR50.55(e) REPORT' NO. 1 (INTERIM)
Description of Doriciency This deficiency concerns the failure-of General Electric Company,. San Jose, California, to hydrotest the GE-NSSS-supplied flued haad process line of the main steam penetrations before attachment c=' th guard pipe supplied by Ametek. Parar.raph NB6321 of ASME Section III requires that all mechanical welded joints of ASME Class I lines shall be left uninsulated an1 exposed for visual examination during hydrotesting. The m
guard pipe attached to the flued head process li.1e preverits proper inspection of the welds during hydrotesting of the system.
Interim Proeress TVA has notified GE of this nonconforming condition. GE is in the process of evaluating this deficiency to determine the necessary corre(iive actions. TVA will submit the next report to NBC on or before February 6, 1982.