Third Interim Deficiency Rept Re Failure of GE to Advise Util of GE-initiated Potentially Reportable Conditions Concerning NSSS Stride Design Deficiency Repts,Initially Reported 810810.Next Rept Will Be Submitted by 820305
ML20039F388
Person / Time
Site: Hartsville, Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 01/05/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-81 10CFR-050.55E, 10CFR-50.55E, 10CFR50.55E, NUDOCS 8201120405
Download: ML20039F388 (2)


Text

Y., TENNESSEE VALLEY AUTHORITY .w, CH ATTANOOG A, TEN N ESSEE 37401 s[f, l *

' ~'

400 Chestnut Street Tower II o 9

January 5, 1982' ff / ~il . y n

HTRD-50-518/81-20, -519/81-16, ,

-520/81-18, -521/81-16 l PBRD-50-553/81-21, -554/81-15 l l

Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

l HARTSVILLE AND PHIPPS BEND NUCLEAR PLANTS - GE SUPPORT OF 10 CFR PART 50.55(e) REPORTING - HTRD-50-518/81-20, -519/81-16, -520/81-18,

-521/81 PBRD-50-553/81-21, -554/81-15 The subject deficiency was initially reported to NRC-0IE, Region II, Inspector P. A. Taylor on August 10, 1981 as NCR's HTN QAB 8101 and PBN QAB 8101. Our first interim report was submitted on September 9,1981.

In accordance with paragraph 50.55(e) of 10 CFR Part 50 we are enclosing the third interim report on the subject deficiency. TVA anticipates transmitting the next report on or before March 5, 1982. If you have any questions, please call Jim Domer at FTS 858-2725.

Very truly yours, TENNES3sE VALLEY AUTHORITY g

[0 }

'br . Mills, Man {g}er'f

?

$QgEl'/Go ou Nuclear Regulation and Safe 4)y

" ' c y11982w ;E Enclosure <, .

~
iq.9 a '

cc: Mr. R. C. DeYoung, Director (Enclosure) 'ec47Ir ff Office of Inspection and Enforcement g\

U.S. Nuclear Regulatory Commission ,*'.s ..TQq~i @

Washington, DC 20555 i

hh 'E d @

S b

m- o-e

~ y

, u d" y.

ENCLOSURE HARTSVILLE AND PHIPPS BEND NUCLEAR PLANTS GE SUPPORT OF 10CFR50.55(e) REPORTING HTRD-50-518/81-20, -519/81-16, -520/81-18 -521/81-16

~

PBRD-50-553/81-21, -554/81-15 10CFR50.55(e)-

REPORT NO. 3 (INTERIM)__

Description of Deficiency This nonconformance concerns the possible failure of .TVA to comply with the reporting regulations of 10 CFR 50.55(e). This is due to GE neither advising TVA of GE-initiated potentially reportable conditions (PRC's) related to NSSS end GE or C. F. Braun-initiated STRIDE Design Deficiency

~

Reports (SDDR's), nor evaluating these PRC's and SDDR's for reportability -

per 10 CFR 50.55(e). This deficiency originated from a TVA QA audit.

(audit No. 81V-18) held at General Electric in San Jose, California.

Interim Progress GE met with the NRC's James H. Sniezek (assistant to R. C. DeYoung) on December 10, 1981, to discuss GE's position regarding reportability l determinations for NSSS-related PRCs. Further resolution of this concern will be addressed in our next report which we anticipate transmitting-to l you on or before Maren 5, 1982.

For STRIDE SDDR's, GE/CFBraun has agreed to identify nonconforming conditions under the guidelines of both 10 CFR 21 and 10 CFR 50.55(e) and to evaluate these conditions for reportability under 10 CFR 21 and 10 CFR 50.55(e). They vill advise TVA of their determination of reportability and will transmit copies of all SDDR's to TVA.