Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217D306 | 13 October 1999 | SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation | Earthquake |
ML20217K459 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With | |
ML20217K774 | 30 September 1999 | Rev 1 to Vegp,Unit 1 Cycle 9 Colr | Shutdown Margin |
ML20217K804 | 30 September 1999 | Rev 1 to Vegp,Unit 2 Cycle 7 Colr | Shutdown Margin |
HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With | |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212A664 | 13 September 1999 | Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program | |
ML20216E506 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with | |
HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With | |
ML20210J963 | 2 August 1999 | SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 | Stroke time |
ML20210J927 | 2 August 1999 | SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding | Backfit |
ML20210P984 | 31 July 1999 | Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With | |
HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20209H121 | 30 June 1999 | Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With | |
HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 30 June 1999 | Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20207E763 | 3 June 1999 | Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable | Hydrostatic VT-2 Incorporated by reference |
HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with | 31 May 1999 | Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with | |
ML20196F971 | 31 May 1999 | Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling Outage | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
ML20195G173 | 31 May 1999 | Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with | |
ML20206G169 | 4 May 1999 | SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) | |
HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20206N214 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With | |
ML20206A656 | 21 April 1999 | Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code | Incorporated by reference |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20205A958 | 31 March 1999 | Rev 0 to VEGP Unit 1 Cycle 9 Colr | Shutdown Margin |
ML20205Q808 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with | |
ML20206C229 | 31 March 1999 | Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 | |
ML20207M189 | 11 March 1999 | SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld | Nondestructive Examination Incorporated by reference |
HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20207K605 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With | Coast down |
ML20209H395 | 15 February 1999 | Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 | Boric Acid Hydrostatic VT-2 Scaffolding |
ML20209H409 | 15 February 1999 | Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 | |
ML20202H985 | 29 January 1999 | Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1 | Time of Discovery Nondestructive Examination Incorporated by reference Scaffolding Backfit |
ML20199F804 | 13 January 1999 | Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage | Hydrostatic VT-2 Liquid penetrant |
ML20206P698 | 7 January 1999 | Ehnp Intake Structure Licensing Rept | Coatings Aging Management Earthquake |
HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20198S178 | 31 December 1998 | SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 | Boric Acid Nondestructive Examination VT-2 Dissimilar Metal Weld |
ML20199E756 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With | |
ML20196J493 | 7 December 1998 | Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 | |
ML20196E522 | 1 December 1998 | Rev 8 to ISI-P-014, ISI Program for VEGP-2 | Time of Discovery Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Scaffolding Backfit |
HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20198B857 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With | |
HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With | |
ML20195H213 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With | |
ML20155B612 | 28 October 1998 | Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable | |
HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20154L568 | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 | |
ML20153G248 | 24 September 1998 | SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Design basis earthquake Earthquake |
ML20239A253 | 3 September 1998 | SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl | High Radiation Area Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |