ML20217D30613 October 1999SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage InstallationEarthquake
ML20217K45930 September 1999Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With
ML20217K77430 September 1999Rev 1 to Vegp,Unit 1 Cycle 9 ColrShutdown Margin
ML20217K80430 September 1999Rev 1 to Vegp,Unit 2 Cycle 7 ColrShutdown Margin
HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With30 September 1999Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212A66413 September 1999Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program
ML20216E50631 August 1999Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with
HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With31 August 1999Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With
ML20210J9632 August 1999SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2Stroke time
ML20210J9272 August 1999SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal BindingBackfit
ML20210P98431 July 1999Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With
HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With31 July 1999Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20209H12130 June 1999Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With
HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With30 June 1999Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20207E7633 June 1999Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 AcceptableHydrostatic
VT-2
Incorporated by reference
HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with31 May 1999Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with
ML20196F97131 May 1999Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling OutageBoric Acid
Hydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
ML20195G17331 May 1999Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with
ML20206G1694 May 1999SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii)
HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With30 April 1999Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20206N21430 April 1999Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With
ML20206A65621 April 1999Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel CodeIncorporated by reference
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With31 March 1999Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20205A95831 March 1999Rev 0 to VEGP Unit 1 Cycle 9 ColrShutdown Margin
ML20205Q80831 March 1999Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with
ML20206C22931 March 1999Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2
ML20207M18911 March 1999SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential WeldNondestructive Examination
Incorporated by reference
HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With28 February 1999Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20207K60528 February 1999Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.WithCoast down
ML20209H39515 February 1999Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2Boric Acid
Hydrostatic
VT-2
Scaffolding
ML20209H40915 February 1999Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2
ML20202H98529 January 1999Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1Time of Discovery
Nondestructive Examination
Incorporated by reference
Scaffolding
Backfit
ML20199F80413 January 1999Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling OutageHydrostatic
VT-2
Liquid penetrant
ML20206P6987 January 1999Ehnp Intake Structure Licensing ReptCoatings
Aging Management
Earthquake
HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With31 December 1998Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20198S17831 December 1998SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2Boric Acid
Nondestructive Examination
VT-2
Dissimilar Metal Weld
ML20199E75631 December 1998Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With
ML20196J4937 December 1998Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15
ML20196E5221 December 1998Rev 8 to ISI-P-014, ISI Program for VEGP-2Time of Discovery
Non-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Scaffolding
Backfit
HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With30 November 1998Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20198B85730 November 1998Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With
HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With31 October 1998Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With
ML20195H21331 October 1998Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With
ML20155B61228 October 1998Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable
HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With30 September 1998Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With
ML20154L56830 September 1998Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2
ML20153G24824 September 1998SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) RequestSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Design basis earthquake
Earthquake
ML20239A2533 September 1998SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 EnclHigh Radiation Area
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference