Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23257A241 | 19 September 2023 | Summary of August 15, 2023, Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss Proposed License Amendment Request Concerning Pressurizer Heaters for Arkansas Nuclear One, Unit 1 | Anticipated operational occurrence |
ML23047A382 | 21 March 2023 | Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting | |
ML22215A191 | 9 August 2022 | Summary of July 13, 2022, Teleconference Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests to Adopt Technical Specifications Task Force (TSTF) Traveler 505, Risk-Informed Extended Completion Times | Probabilistic Risk Assessment FLEX Large early release frequency Offsite Circuit |
ML22217A007 | 29 July 2022 | NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022 | COVID-19 Fuel cladding Preliminary White Finding |
ML22167A088 | 24 June 2022 | Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit | |
ML22147A093 | 6 June 2022 | 2021 Annual Assessment Public Meeting Summary | Pandemic Coronavirus COVID-19 |
ML22151A130 | 2 June 2022 | May 10, 2022, Summary of Teleconference Meeting W/Entergy Operations, Inc. to Discuss a Planned Alternative for a One-Time Schedule Extension for the In-Service Examination of Control Rod Drive Mechanism Penetration No. 1 in the Reactor Ves | Nondestructive Examination |
ML22125A245 | 9 May 2022 | May 3, 2022, Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for ANO, Units 1 & 2 Regarding Proposed Revision to Emergency Plan and On-Shift Staff Analysis | |
ML22003A056 | 10 January 2022 | Summary of December 16, 2021, Presubmittal Teleconference with Entergy Operations, Inc. to Discuss Proposed Amendment Request Concerning TS 3.4.4, RCS Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1 | |
ML21323A047 | 6 December 2021 | Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors | |
ML21288A039 | 18 October 2021 | September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor | |
ML21181A335 | 1 July 2021 | June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project | Probabilistic Risk Assessment |
ML21158A223 | 8 June 2021 | Meeting Summary for Ticap Workshop 3 | Probabilistic Risk Assessment Maintenance Rule Program |
ML21140A389 | 24 May 2021 | Riv Column 1 EOC 2020 Public Meeting Summary | Coronavirus COVID-19 |
ML21132A295 | 14 May 2021 | Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project | Probabilistic Risk Assessment Maintenance Rule Program |
ML21112A249 | 7 May 2021 | Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro | Anticipated operational occurrence Post Accident Monitoring Cyber Security Surveillance Frequency Control Program Foreign Material Exclusion |
ML21117A026 | 5 May 2021 | Summary of Teleconference with Entergy Operations, Inc. to Discuss Forthcoming LAR Concerning Reactor Coolant System Primary Activity and Primary-to-Secondary Leak Rate | |
ML21085A865 | 8 April 2021 | Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non | Post Accident Monitoring Cyber Security Surveillance Frequency Control Program Foreign Material Exclusion |
ML21075A032 | 2 April 2021 | Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes | Post Accident Monitoring Probabilistic Risk Assessment Cyber Security Surveillance Frequency Control Program Foreign Material Exclusion |
ML21071A286 | 1 April 2021 | Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY | Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Cyber Security Incorporated by reference Surveillance Frequency Control Program Foreign Material Exclusion |
ML21039A268 | 22 February 2021 | Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 | Post Accident Monitoring Cyber Security Incorporated by reference Surveillance Frequency Control Program Foreign Material Exclusion |
ML21032A013 | 19 February 2021 | 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station | Post Accident Monitoring Probabilistic Risk Assessment Cyber Security Incorporated by reference Surveillance Frequency Control Program Foreign Material Exclusion |
ML21027A231 | 9 February 2021 | Summary of January 25, 2021 Presubmittal Meeting with Entergy Operations, Inc. Planned LAR to Allow Receipt, Possession, and Use of Byproduct Materials from Other Entergy Stations for River Bend Station, Unit 1 | Probabilistic Risk Assessment |
ML21013A336 | 26 January 2021 | December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 | Ultimate heat sink Probabilistic Risk Assessment FLEX Large early release frequency |
ML21012A202 | 15 January 2021 | Summary of December 15, 2020, Category 1 Public Pre-Application Meeting with Entergy Operations, Inc. Regarding Proposed LAR to Relocate Specific Technical Specifications for Waterford Steam Electric Station, Unit 3 | Probabilistic Risk Assessment |
ML20315A267 | 17 December 2020 | Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) | Incorporated by reference Surveillance Frequency Control Program |
ML20325A241 | 17 December 2020 | Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes | Cyber Security Incorporated by reference Surveillance Frequency Control Program Foreign Material Exclusion |
ML20325A321 | 17 December 2020 | Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) | Probabilistic Risk Assessment Cyber Security Incorporated by reference Surveillance Frequency Control Program Foreign Material Exclusion |
ML20337A157 | 8 December 2020 | Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss the Forthcoming Supplemental Response Concerning Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2 | |
ML20317A037 | 18 November 2020 | Summary of September 22, 2020, Presubmittal Meeting with Entergy Operations, Inc., a Request for a One-Time Exemption from 10 CFR Part 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise | Exemption Request Coronavirus |
ML20287A401 | 26 October 2020 | Summary of September 17, 2020, Meeting with Entergy to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Request to the Extend Allowable Outage Time for the Emergency Cooling Pond | |
ML20288A742 | 22 October 2020 | Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version) | Cyber Security Surveillance Frequency Control Program |
ML20260G999 | 16 September 2020 | Summary of August 4, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Regarding Adoption of 10 CFR 50.69 | Probabilistic Risk Assessment |
ML20182A447 | 8 July 2020 | Summary of June 11, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Waterford Steam Electric Station, Unit 3 Regarding Adoption of 10 CFR 50.69 | Probabilistic Risk Assessment FLEX Surveillance Frequency Control Program |
ML20189A283 | 7 July 2020 | Summary of Region IV Annual Assessment Public Meeting | Coronavirus |
ML20153A225 | 4 June 2020 | April 29, 2020, Summary of Meeting with Entergy Operations, Inc. to Discuss a Proposed Relief Request Use of Carbon Fiber Reinforced Polymer Piping for Underground Service Water Piping at Arkansas Nuclear One, Units 1 and 2 | |
ML20107F733 | 27 April 2020 | Summary of April 3, 2020 Meeting with Industry Regarding Changes to Subsequent License Renewal Guidance Documents | Coatings Aging Management License Renewal Subsequent License Renewal |
ML20113E836 | 23 April 2020 | Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station | Surveillance Frequency Control Program |
ML20106E888 | 20 April 2020 | Summary of Public Meeting with Entergy Operations, Inc. Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes | |
ML20059K156 | 19 March 2020 | Discussion Topics for March 19, 2020 Fourth Partially Closed Public Meeting Regarding a Planned License Amendment Request to Install a Digital Modification to CPC and Ceac Systems Entergy Operations, Inc | |
ML20013G259 | 7 February 2020 | Summary of December 11, 2019 Partially Closed Presubmittal Meeting with Entergy Operations, Inc., to Discuss the Effect of a Planned LAR for Digital Instrumentation and Control Modification on Accident Analyses at Waterford (L-2019-LRM-0079 | |
ML20015A269 | 5 February 2020 | December 17, 2019, Summary of Meeting with Entergy Operations, Inc. on Planned License Amendment Request to Incorporate the Tornado Missile Risk Evaluator Methodology at River Bend Station, Unit 1 | Enforcement Discretion Tornado Generated Missile Tornado Missile Protection Tornado Missile Risk Evaluator |
ML19298B918 | 5 November 2019 | Summary of 9/19/19 Presubmittal Meeting with Entergy Operations, Inc. Re Request to Replace Core Protection Calculator and CEA Calculator Systems with Digital Systems in Accordance with DI&C-ISG-06, Revision 2 for Waterford Unit 3 | |
ML19247C388 | 10 September 2019 | Summary of August 29, 2019, Category 1 Public Meeting with Entergy a Request for a Fee Waiver for the Review of a Planned Digital Instrumentation and Control License Amendment Request | |
ML19182A033 | 10 July 2019 | Summary of Teleconference with Entergy Operations, Inc. Regarding Proposed License Amendment Request Revised Fuel Handling Analysis and Adoption of Various TSTF Travelers for Arkansas Nuclear One, Unit 2 | |
ML18323A421 | 26 November 2018 | Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components | |
ML18270A158 | 10 October 2018 | Summary of Meeting with Entergy Operations Inc. on Its Intent to Change Neutron Absorbers for the River Bend Station, Unit 1 Spent Fuel Pool | |
ML18176A131 | 21 June 2018 | Summary of Annual Assessment Meeting with Entergy Operations, Inc., Regarding 2017 Performance of Arkansas Nuclear One | |
ML18155A550 | 14 June 2018 | Summary of a Telephone Conference Call Held on May 17, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the River Bend Station Unit 1 License Renewal Application Revie | |
ML18143B396 | 4 June 2018 | 05/03/2018 Summary Telephone Conference with Entergy Regarding the Need for Additional Information to Support the River Bend Station Unit 1 License Renewal Application Review. | Aging Management |