Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23257A24119 September 2023Summary of August 15, 2023, Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss Proposed License Amendment Request Concerning Pressurizer Heaters for Arkansas Nuclear One, Unit 1Anticipated operational occurrence
ML23047A38221 March 2023Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting
ML22215A1919 August 2022Summary of July 13, 2022, Teleconference Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests to Adopt Technical Specifications Task Force (TSTF) Traveler 505, Risk-Informed Extended Completion TimesProbabilistic Risk Assessment
FLEX
Large early release frequency
Offsite Circuit
ML22217A00729 July 2022NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022COVID-19
Fuel cladding
Preliminary White Finding
ML22167A08824 June 2022Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit
ML22147A0936 June 20222021 Annual Assessment Public Meeting SummaryPandemic
Coronavirus
COVID-19
ML22151A1302 June 2022May 10, 2022, Summary of Teleconference Meeting W/Entergy Operations, Inc. to Discuss a Planned Alternative for a One-Time Schedule Extension for the In-Service Examination of Control Rod Drive Mechanism Penetration No. 1 in the Reactor VesNondestructive Examination
ML22125A2459 May 2022May 3, 2022, Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for ANO, Units 1 & 2 Regarding Proposed Revision to Emergency Plan and On-Shift Staff Analysis
ML22003A05610 January 2022Summary of December 16, 2021, Presubmittal Teleconference with Entergy Operations, Inc. to Discuss Proposed Amendment Request Concerning TS 3.4.4, RCS Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1
ML21323A0476 December 2021Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors
ML21288A03918 October 2021September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor
ML21181A3351 July 2021June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application ProjectProbabilistic Risk Assessment
ML21158A2238 June 2021Meeting Summary for Ticap Workshop 3Probabilistic Risk Assessment
Maintenance Rule Program
ML21140A38924 May 2021Riv Column 1 EOC 2020 Public Meeting SummaryCoronavirus
COVID-19
ML21132A29514 May 2021Summary of Public Meeting to Discuss Technology Inclusive Content of Application ProjectProbabilistic Risk Assessment
Maintenance Rule Program
ML21112A2497 May 2021Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-ProAnticipated operational occurrence
Post Accident Monitoring
Cyber Security
Surveillance Frequency Control Program
Foreign Material Exclusion
ML21117A0265 May 2021Summary of Teleconference with Entergy Operations, Inc. to Discuss Forthcoming LAR Concerning Reactor Coolant System Primary Activity and Primary-to-Secondary Leak Rate
ML21085A8658 April 2021Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) NonPost Accident Monitoring
Cyber Security
Surveillance Frequency Control Program
Foreign Material Exclusion
ML21075A0322 April 2021Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing ProcessesPost Accident Monitoring
Probabilistic Risk Assessment
Cyber Security
Surveillance Frequency Control Program
Foreign Material Exclusion
ML21071A2861 April 2021Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARYAnticipated operational occurrence
Post Accident Monitoring
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
Surveillance Frequency Control Program
Foreign Material Exclusion
ML21039A26822 February 2021Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3Post Accident Monitoring
Cyber Security
Incorporated by reference
Surveillance Frequency Control Program
Foreign Material Exclusion
ML21032A01319 February 202101/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric StationPost Accident Monitoring
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
Surveillance Frequency Control Program
Foreign Material Exclusion
ML21027A2319 February 2021Summary of January 25, 2021 Presubmittal Meeting with Entergy Operations, Inc. Planned LAR to Allow Receipt, Possession, and Use of Byproduct Materials from Other Entergy Stations for River Bend Station, Unit 1Probabilistic Risk Assessment
ML21013A33626 January 2021December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3Ultimate heat sink
Probabilistic Risk Assessment
FLEX
Large early release frequency
ML21012A20215 January 2021Summary of December 15, 2020, Category 1 Public Pre-Application Meeting with Entergy Operations, Inc. Regarding Proposed LAR to Relocate Specific Technical Specifications for Waterford Steam Electric Station, Unit 3Probabilistic Risk Assessment
ML20315A26717 December 2020Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY)Incorporated by reference
Surveillance Frequency Control Program
ML20325A24117 December 2020Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing ProcessesCyber Security
Incorporated by reference
Surveillance Frequency Control Program
Foreign Material Exclusion
ML20325A32117 December 2020Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted)Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
Surveillance Frequency Control Program
Foreign Material Exclusion
ML20337A1578 December 2020Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss the Forthcoming Supplemental Response Concerning Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2
ML20317A03718 November 2020Summary of September 22, 2020, Presubmittal Meeting with Entergy Operations, Inc., a Request for a One-Time Exemption from 10 CFR Part 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite ExerciseExemption Request
Coronavirus
ML20287A40126 October 2020Summary of September 17, 2020, Meeting with Entergy to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Request to the Extend Allowable Outage Time for the Emergency Cooling Pond
ML20288A74222 October 2020Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version)Cyber Security
Surveillance Frequency Control Program
ML20260G99916 September 2020Summary of August 4, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Regarding Adoption of 10 CFR 50.69Probabilistic Risk Assessment
ML20182A4478 July 2020Summary of June 11, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Waterford Steam Electric Station, Unit 3 Regarding Adoption of 10 CFR 50.69Probabilistic Risk Assessment
FLEX
Surveillance Frequency Control Program
ML20189A2837 July 2020Summary of Region IV Annual Assessment Public MeetingCoronavirus
ML20153A2254 June 2020April 29, 2020, Summary of Meeting with Entergy Operations, Inc. to Discuss a Proposed Relief Request Use of Carbon Fiber Reinforced Polymer Piping for Underground Service Water Piping at Arkansas Nuclear One, Units 1 and 2
ML20107F73327 April 2020Summary of April 3, 2020 Meeting with Industry Regarding Changes to Subsequent License Renewal Guidance DocumentsCoatings
Aging Management
License Renewal
Subsequent License Renewal
ML20113E83623 April 2020Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric StationSurveillance Frequency Control Program
ML20106E88820 April 2020Summary of Public Meeting with Entergy Operations, Inc. Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes
ML20059K15619 March 2020Discussion Topics for March 19, 2020 Fourth Partially Closed Public Meeting Regarding a Planned License Amendment Request to Install a Digital Modification to CPC and Ceac Systems Entergy Operations, Inc
ML20013G2597 February 2020Summary of December 11, 2019 Partially Closed Presubmittal Meeting with Entergy Operations, Inc., to Discuss the Effect of a Planned LAR for Digital Instrumentation and Control Modification on Accident Analyses at Waterford (L-2019-LRM-0079
ML20015A2695 February 2020December 17, 2019, Summary of Meeting with Entergy Operations, Inc. on Planned License Amendment Request to Incorporate the Tornado Missile Risk Evaluator Methodology at River Bend Station, Unit 1Enforcement Discretion
Tornado Generated Missile
Tornado Missile Protection
Tornado Missile Risk Evaluator
ML19298B9185 November 2019Summary of 9/19/19 Presubmittal Meeting with Entergy Operations, Inc. Re Request to Replace Core Protection Calculator and CEA Calculator Systems with Digital Systems in Accordance with DI&C-ISG-06, Revision 2 for Waterford Unit 3
ML19247C38810 September 2019Summary of August 29, 2019, Category 1 Public Meeting with Entergy a Request for a Fee Waiver for the Review of a Planned Digital Instrumentation and Control License Amendment Request
ML19182A03310 July 2019Summary of Teleconference with Entergy Operations, Inc. Regarding Proposed License Amendment Request Revised Fuel Handling Analysis and Adoption of Various TSTF Travelers for Arkansas Nuclear One, Unit 2
ML18323A42126 November 2018Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components
ML18270A15810 October 2018Summary of Meeting with Entergy Operations Inc. on Its Intent to Change Neutron Absorbers for the River Bend Station, Unit 1 Spent Fuel Pool
ML18176A13121 June 2018Summary of Annual Assessment Meeting with Entergy Operations, Inc., Regarding 2017 Performance of Arkansas Nuclear One
ML18155A55014 June 2018Summary of a Telephone Conference Call Held on May 17, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the River Bend Station Unit 1 License Renewal Application Revie
ML18143B3964 June 201805/03/2018 Summary Telephone Conference with Entergy Regarding the Need for Additional Information to Support the River Bend Station Unit 1 License Renewal Application Review.Aging Management