PY-CEI-NRR-1023, Provides Documentation of Completion/Incorporation Into Plant Programs of Tdi Owners Group Phase II Recommendations. Summary Resolution of Phase II Mods by Component,Recommended Action,Method of Resolution & Status Encl

From kanterella
Jump to navigation Jump to search
Provides Documentation of Completion/Incorporation Into Plant Programs of Tdi Owners Group Phase II Recommendations. Summary Resolution of Phase II Mods by Component,Recommended Action,Method of Resolution & Status Encl
ML20246F041
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/07/1989
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-1023, NUDOCS 8907130104
Download: ML20246F041 (8)


Text

,

THE CLEVELAND ELECTRIC ILLUMINATING COMPANY P.O. SOX 97 N PERRY, OHIO 44001 W TELEPHONE (218) 259-3737 5 ADDRESS 10 CENTER ROAD FROM CLEVELAND: 241 1650 Serving The Best location in the Nation Al Kaplan PERRY NUCLEAR POWER PLANT VICE PRESOLNT nuctc An onoup July 7, 1989 PY-CEI/NRR-1023 L l

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Perry Nuclear Power Plant Docket No. 50-440 TDI Diesel Phase 11 Design Review / Quality Revalidation Genclemen:

This letter provides documentation of the completion / incorporation into PNPP programs of the TDI Owners Group Phase II recommendations on diesel engine component modifications and inspections.

The TDI Owners Group performed reviews of diesel engine components to ensure that the diesel generators would provide a reliable source of onsite power and to assure that the design and manufacturing quality is within the range normally assumed for diesel engines manufactured it accordance with 10 CFR 50 Appendix B. The Phase 1 effort consisted of reviews of components with known generic problems, while Phase 11 proceeded beyond known problem areas to systematically consider all components important to the operability and reliability of the engines. These Phase 11 reviews were documented by the TDI Owners Group in Design Review / Quality Revalidation (DR/QR) reports. The DR/QR reports for the Commanche Peak DSRV-16-4 engines constituted the lead engine review for PNPP. This lead engine review was generally applicable to similar components of the Division 1 and 2 TDI diesel generators at the Perry Plant and was extensively referenced in the PNPP DR/QR. The Phase II DR/QR reports contained results of the design review of each component, and any modifications, quality inspections and/or maintenance recommendations that resulted from the review.

The NRC and its contractor performed audit reviews of the comprehensive Owners Group Phase 11 DR/QR reports for the lead plants, and verified for the other plants such as PNPP that the quality of the Owner's Group effort was continued and that a high degree of overlap existed. The staff concluded that implementation of the recommendations in the Phase 11 reports will be effective in improving and ensuring the design adequacy and quality of the engine components and hence, the reliability and operability of the TDI engines at the various Owner's Group plants.

ACCI 8907130104 890707 i l

PDR ADOCK0500gpj0 P

D6cument Control Desk July 7, 1989

'PY-CEI/NRR-1023 L Attachment 1 to this letter provides a summary which documents the completion of the Owners Group recommendations on. component modifications and inspections in accordance with PNPP programs.' Design changes such as additions or modifications of pipe and conduit supports or restraints have been completed.

n on a number of diesel engine and support systems. Inspections have been performed, and if the inspections were of an ongoing nature, have been incorporated into the maintenance / surveillance program. Certain recommendations, such as for addition of selected pipe supports, have been analyzed following detailed inspections of the Perry-specific engine configuration to verify that the installed design is acceptable for reliable-engine operation. . Since the NRC had indicated approval (on a generic, audit-type basis) of the Owners Group recommendations, those recommendations which were addressed or implemented at PNPP in a manner sufficient 1y'different ,

from the.0wners Group recommendations to require evaluation, have been '

subjected to a Safety Evaluation which has been reviewed and approved in accordance with 10 CFR 50.59 and plant Technical Specifications.

The attached summary is provided for the staff's information. If you have any questions, please feel free te call.

Very truly yours, G

Al Kaplan Vice President Nuclear Group Attachment AK:njc cc: T. Colburn Sr. Resident Inspector NRC Region III

j Jttly 7, 1989

'PY-CEI/NRR-1023 L Page 1 of 6 {

SUMMARY

RESOLUTION OF PHASE II MODIFICATIONS Method of Component Recommended Action Resolution Statu_s Tt*RBOCHARGER, INTAKE, INTERCOOLER_AND EXHAUST Intercooler Delaval Service Informa- Modifica- Complete F-068 tion Memorandum (SIM) tions 365 recommendations.

Turbocharger Modifications to ensure Modifica- Complete MP-022/023 reliability and perfor- tions mance of turbocharger.

Turbocharger Thrust Addition of supports / Modifica- Complete Baaring Drip Lube restraints. tions ,

System 02-CFR Intake Manifold and Inspection of U-bolts Inspection Complete Piping for proper installation 02-375 and fit.

Exhaust Manifold Modifications to slip Analysis Complete 02-380A joints.

LUBE OIL Lube Oil Fittings Modifications to Analysis Complete Internal- Supports U-bolts.

02-307D Engine Driven Lube Modifications to pump Analysis Complete Oil Pump suction line.02-420 Lube Oil LineG Replace 12-inch Dresser Maintenance No leakage External - Tubing, coupling gasket with Program to date.

Fittings, Couplings Viton gasket if leakage Will 02-465A-LB occurs. replace if leakage i develops. l Lube Oil Lines Replace Style 65 Dresser Not Appli- N/A External - Tubing, couplings with Style 90 cable to Fittings, Couplings if leakage develops. PNPP  !

02-465A-SB Lube Oil Lines Addition / modification of Modifica- Complete External - Supports supports. tions &

02-465C-SB Analysis

Y' ) I f*' *1 July 7, 1989 L "

PY-CEI/NRR-1023 L-Page 2.of"6

' Method of' Component Re' commended Action Resolution Status LUBE OIL.(continued)

Turbocharger .

Replace 2 1/2' inch Analysis Complete

' Lube Oil- Fitting ~-- . Dresser couplings.

Piping 02-457A-LB.

Turbocharger- Addition / modification Modifica- Complete Lube: Oil' Fitting - of supports. tions Pipe; Tubing, Fittings &~ Flexible LCouplings 02-467A-SB 467B-SBi  !

Turbocharger --Lube Reinforcement of support Analysis Complete Oil' Fittings,

. members.

' Supports 02-467B-LB~

Auxiliary.Sub-Base Addition / modification' Modifica- Complete

,011 & Water Piping - of supports-and two- cations &

. Lube Oil: Piping & directional restraints. Analysis Fittings 02-717F-SB. ^

Supports and Mount-

'ing 02-7171-SB ENGINE BASE AND. BEARING CAPS No modifications recommended CRANKSHAFT AND BEARINGS No modifications recommended CYLINDER BLOCK, LINERS AND WATER MANIFOLD No modifications recommended

= _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _

, ". - July 7, 1989

, .PY-CEI/NRR-1023 L Page 3 of 6 ~

Method of Component Recommended Action Resolution Status l AIRSTART AND BARRING DEVICE 1'

l Air Start valves Implementation of SIMS Maintenance Complete 02-359 329 and 360. Program i

Storting Air Mani- Modification of supports. Modifica- Complete i fold: Piping, tions, L Tubing, Fittings & _

Analysis &

Supports Evaluation 02-441A-LB 02-441C-LB Starting Air Mani- Addition / modification of Modifica- Complete fold: . Piping, supports. tions &

Tubing, Fittings & Analysis Supports 02-441A-SB 02-441C-SB Starting Air Mani- Addition of free-flowing Modifica- Complete fold: Valves, drains to the air tions Strainers and distributor filter.

Filters.

02-441B CONNECTING RODS No modifications recommended PISTONS Piston: Pin Assembly ' Replace spiral ring Maintenance Will 02-341C retainers with Waldes Program & replace at snap-ring retainers Evaluation next when engine becomes engine-accessible. disassembly CAMSHAFT AND VALVE TRAIN No modifications recommended IDLER GEAR ASSEMBLY AND FRONT GEAR CASE No modifications recommended l l

4

H i-, '

- July 7, 1989

, PY-CEI/NRR-1023.L-m Page 4 of 6 FLYWHEEL No modifications recommended Method of Recommended Action Resolution Status

~

Component

._ ENGINE INSTRUMENTATION AND WIRING Engine & Auxiliary Addition / modification of Modifica- Complete Module Wiring conduit supports. tions Material & Fittings:

. Pyrometer Conduit Assembly - Conduit,

~ Fittings & Supports 02-630A,B,C 02-688A OVERSPEED TRIP AND GOVERNOR Governor Linkage Maintenance related Maintenance Complete 02-413A modifications. Program ENGINE SHUTDOWN AND EQUIPMENT Engine Shutdown Addition of supports / Modifica- Complete Equipment - Tubing, restraints tions, Fittings & Supports Analysis &

02-695A Evaluation JACKET WATER Jacket Water Manifold- Double-nut tie rod Inspection Complete M:nifold Assembly assembly. Replace with & Analysis with Hardware, larger diameter tie rod.

Coupling & Gaskets Stiffen support.

02-316A&B Jacket Water Inlet Support modifications Not appli- N/A Manifold.- Vent Line cable to to Discharge Mani- PNPP fold 02-316C

[.

k4 - '- - July 7, 1989

. PY-CEI/NRR-1023 L Page 5 of 6 Method of Component Recommended Action Resolution Status Jacket Water Replace Style 65 Dresser Maintenance Will l Discharge Manifold / couplings with Style 90 Program replace if.

Piping if leakage develops, leakage 02-317A&B develops L 02-435A L 02-437 Water Discharge Inspect welds on Inspection Complete Manifold - Supports supports and shroud and Modifi-02-317C cation Jacket Water Modify support on-8 X 8 Analysis Complete

' Fittings: Supports tee. l 02-435B-LB Jacket Water Stand- Modify vent line Modifica- Complete pipe: Supports restraints. tions 02-700C CYLINDER HEADS AND VALVES No modifications recommended FUEL OIL INJECTION Fuel Oil Header: Addition / modification of Analysis Complete Piping / Tubing supports.

02-450A Fuel Oil Header: Addition / modification of Modifica- Complete Fual Oil Tubing supports, tions, supports Analysis &

02-450B Evaulation Auxiliary Sub-Base Addition / modification of Modifica- Complete

&.011 & Water Piping supports. tions &

Fuel Oil: Piping, Evaluation Fittings, Supports 02-717J

'02-717M GENERATOR Generator Controls Replace field flashing Evaluation- Complete 02-650B relay with an enclosed relay.

7-l+ b

  • gg -

- July 7, 1989 .

, ,. PY-CEI/NRR-1023 L:

Page. 6. of 6

l. .

Method of

Component Recommended Action Resolution ' Status CONTROL' PANEL ASSEMBLY No' modifications' recommended

- ENGINE & AUXILIARY SUB-BASE & FOUNDATION BOLTS No-modifications recommended Y