ML20204F069
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/25/1982
From: Knop R, Marabito R, Menczer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-82-031, PNO-III-82-31, NUDOCS 8304280333
Download: ML20204F069 (1)


.

Dato March 25, 1982 PRELIMINARY NOTIFICATION OF EVE' 'OR UNUSUAL OCCURRENCE-PNO-III. a2- )

31 This praliminary notificcti1;n c:nstitutco EARLY notics of cvento of POSSIBLE cafGty er public interest significance. The information is as initially received without veri-ficction or evaluation, and is basically all that is known by the staff on this date.

T;cility: Commonwealth Edisen Co. Licensee Emergency Classification:

LaSalle Nuclear Power Station Notification of Unusual Event Docket Nos. 50-373 & 50-374 Alert Seneca, IL Site Area Emergency General Emergency XX Not Applicable Subj ect: ILLIN0IS ATTORNEY GENERAL REQUESTS SHOW CAUSE PROCEEDING The Illinois Attorney General has issued a request to the Director, Office of Nuclear Reactor Rugulation under 10 CF5; Part 2.206 to institute a show cause proceeding against Commonwealth Edison LaSalle Units 1 & 2. The request seeks suspension of the NRC's consideration of a fuel loading and low power testing license for Unit 1 and the suspension of all operating license proceedings for Units 1 & 2 until the Commission investigates the structural integrity of the units. The Attorney General additionally requests a hearing in the show cause proczeding and requests that Illinois be admitted as a party to that proceeding.

The Attorney General's action is based on an affidavit from a driller who was employed at the LaSalle station from July,1978 through July,1980. The driller alleges that it was a  !

regular practice of electrical contractors to drill through rebars in concrete when drilling holes for electrical conduits and anchor bolts. Also submitted was a second affidavit from Dale Bridenbaugh of MHB Techr.ical Associates, a ntalear engineer, who stated there is cause to investigate drilling practices because of the alleged potential failure of structures or systems to perform their safety-related functions under scismic or accident conditions.

Region III will review the allegations once the Illinois Attorney General's request is received.

The current estimated fuel loading date for Unit 1 is about April 15.

Copies of the Attorney General's request have been mailed to NRR and Region III. The Attorney General issued a press release on this subject on March 25, 1982, Neither the licensee nor Region III are planning a press release. There has been Chicago area news media interest. Region III is responding to inquiries.

Region III received notification of the Attorney General's action about 2 p.m. (CST)

March 25, 1982 through news media inquiries. Subsequent information was obtained from the Attorney General's o~ffice.

This information is current as of 4:30 p.m.

PST).

k $ <f gD

Contact:

. . rabito W. Menczer R. Knop g6 i

84-2667 384-2666 384-2547 Co,.0 0 *s 31 DISTRIBU IGN:

H. St. dp 1DiBB /W Phillips /efd E/W h Willste #.#

. Chairman Palladino EDO NRR IE NMSS Comm. Gilinsky AEOD Iandow (OIA) RES Comm. Bradford PA '

Comr.. Ahearne MPA Air Rights /WW MAIL:

Comm. Roberts ELD SP INPO /B.3 7 ADM:DMB '

ACRS NSAC /fK(;

SECY Regions I 'd>1, II_//cf/ , IV /o f f , V /J3( Licensee (Corporate Office)_/ M d CA 8304280333 820325 PDR I&E Rev. 1/29/89'