Similar Documents at Fermi |
---|
Category:Letter type:NRC
MONTHYEARNRC-24-0057, Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report2024-09-0303 September 2024 Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report NRC-24-0053, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 20242024-08-30030 August 2024 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 2024 NRC-24-0050, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2024-08-12012 August 2024 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-24-0048, Submittal of Inservice Inspection Summary Report2024-08-0606 August 2024 Submittal of Inservice Inspection Summary Report NRC-24-0046, Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance2024-07-25025 July 2024 Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-24-0020, Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan2024-07-24024 July 2024 Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-24-0044, Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License)2024-07-10010 July 2024 Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License) NRC-24-0041, Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report2024-06-21021 June 2024 Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report NRC-24-0042, Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data2024-06-18018 June 2024 Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data NRC-24-0040, Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-00332024-06-0606 June 2024 Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-0033 NRC-24-0033, DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-05-30030 May 2024 DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0035, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications2024-05-16016 May 2024 Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications NRC-24-0025, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-222024-05-15015 May 2024 Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 NRC-24-0017, 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report NRC-24-0032, Transmittal of the Core Operating Limits Report for Cycle 232024-04-25025 April 2024 Transmittal of the Core Operating Limits Report for Cycle 23 NRC-24-0027, Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-04-24024 April 2024 Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter NRC-24-0018, 2023 Annual Non-Radiological Environmental Operating Report2024-04-0909 April 2024 2023 Annual Non-Radiological Environmental Operating Report NRC-24-0015, Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report2024-03-31031 March 2024 Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report NRC-24-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion2024-03-21021 March 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion NRC-24-0019, Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2024-03-14014 March 2024 Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-24-0023, NRC-24-0023, Post Exam Package Submittal Letter to NRC2024-03-0707 March 2024 NRC-24-0023, Post Exam Package Submittal Letter to NRC NRC-24-0008, Levels and Sources of Property Insurance Coverage2024-02-15015 February 2024 Levels and Sources of Property Insurance Coverage NRC-24-0009, Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 22024-02-0606 February 2024 Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 2 NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0075, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation2023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi 2024-09-03
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARNRC-24-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion2024-03-21021 March 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML22101A0472022-04-0404 April 2022 Submittal of Application for the Renewal of National Pollutant Discharge Elimination System (NPDES) Permit NRC-21-0001, License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes2021-03-31031 March 2021 License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes NRC-20-0038, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2020-10-28028 October 2020 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules NRC-20-0040, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2020-06-23023 June 2020 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-20-0032, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2020-06-0505 June 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NRC-19-0075, License Amendment Request - Proposed Revision to Technical Specifications for Secondary Containment Surveillance Requirements2019-12-0606 December 2019 License Amendment Request - Proposed Revision to Technical Specifications for Secondary Containment Surveillance Requirements NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2019-11-0808 November 2019 DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-19-0028, License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-032019-09-0505 September 2019 License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03 NRC-19-0001, License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation2019-02-27027 February 2019 License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation NRC-19-0002, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2019-02-0808 February 2019 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR NRC-17-0063, License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities.2017-10-0909 October 2017 License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities. NRC-17-0067, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-08-31031 August 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML17237A1762017-08-24024 August 2017 License Amendment Request to Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Reactor Trip and Primary Containment Isolation System Group 1 Isolation Functions NRC-17-0056, Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 32017-08-15015 August 2017 Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3 NRC-17-0044, License Amendment Request to Revise Technical Specification 5.5.7, Ventilation Filter Testing Program, to Be Consistent with Standard Technical Specifications2017-08-14014 August 2017 License Amendment Request to Revise Technical Specification 5.5.7, Ventilation Filter Testing Program, to Be Consistent with Standard Technical Specifications NRC-17-0025, License Amendment Request to Revise Technical Specification Section 3.7.2 for Emergency Equipment Cooling Water / Emergency Equipment Service Water System and Ultimate Heat Sink2017-07-17017 July 2017 License Amendment Request to Revise Technical Specification Section 3.7.2 for Emergency Equipment Cooling Water / Emergency Equipment Service Water System and Ultimate Heat Sink NRC-17-0010, License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation2017-02-23023 February 2017 License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation NRC-16-0036, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Pro2016-07-25025 July 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Proces NRC-16-0006, License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals2016-03-22022 March 2016 License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals NRC-15-0090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-09-24024 September 2015 License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NRC-15-0081, License Renewal Application Update for the Boraflex Monitoring Program2015-09-24024 September 2015 License Renewal Application Update for the Boraflex Monitoring Program NRC-15-0067, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 352015-06-18018 June 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 35 NRC-15-0062, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 342015-06-0909 June 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 34 NRC-15-0044, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Sets 27, 28, 29 and 312015-04-27027 April 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Sets 27, 28, 29 and 31 NRC-15-0030, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 222015-03-19019 March 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 22 NRC-15-0028, Revision to Response to License Renewal Environmental RAI SSSH-12015-02-18018 February 2015 Revision to Response to License Renewal Environmental RAI SSSH-1 NRC-15-0021, License Renewal Application - Response to LR-ISG-2013-012015-02-0505 February 2015 License Renewal Application - Response to LR-ISG-2013-01 NRC-14-0055, License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan2014-10-21021 October 2014 License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan ML14121A5362014-04-24024 April 2014 Fermi 2, License Renewal Application, Page 3.3-2 Through Appendix C, Page C-13 ML14121A5352014-04-24024 April 2014 Fermi 2, License Renewal Application, Cover Through Page 3.3-1 ML14121A5382014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix D Through Appendix E, Page 3-169 ML14121A5392014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix E, Page 3-170 Through Page 9-23 NRC-14-0028, License Renewal Application, Appendix E, Page 10-1 Through End2014-04-24024 April 2014 License Renewal Application, Appendix E, Page 10-1 Through End NRC-13-0012, License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2013-04-17017 April 2013 License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate2013-02-0707 February 2013 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate NRC-13-0001, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process2013-01-11011 January 2013 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process NRC-13-0002, Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles2013-01-11011 January 2013 Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles NRC-12-0037, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0087, License Amendment Request to Change Name of Licensee from the Detroit Edison Company to DTE Electric Company2012-12-21021 December 2012 License Amendment Request to Change Name of Licensee from the Detroit Edison Company to DTE Electric Company 2024-03-21
[Table view] Category:Technical Specifications
MONTHYEARNRC-24-0057, Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report2024-09-0303 September 2024 Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report NRC-24-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion2024-03-21021 March 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) ML21335A2802022-04-0707 April 2022 Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes ML22032A1572022-01-19019 January 2022 Technical Requirements Manual - Vol. 1 Revision 130 Dated 01/19/2022 ML21251A1602021-08-17017 August 2021 Technical Requirements Manual - Vol 1 - (Revision 127 Dated 08/17/2021) ML21053A2022021-02-0101 February 2021 Technical Requirements Manual, Vol 1 - Revision 124 Dated 02/01/2021 ML20233A8382020-10-0505 October 2020 Issuance of Amendment No. 216 - Revision to Technical Specification in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 ML18165A2022018-09-13013 September 2018 Issuance of Amendment Regarding the Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML16270A5312016-12-15015 December 2016 Fermi, Unit 2, Preoperational Test, Startup Tests and Other Items ML16069A0062016-04-20020 April 2016 Issuance of Amendment Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation ML16054A6372016-04-0505 April 2016 Issuance of Amendment to Revise License Amendment Request to Revise Technical Specification Section 3.5.1, Emergency Core Cooling System - Operating Report ML16039A1212016-02-18018 February 2016 Corrections to Amendment No. 201 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425 ML15233A0842015-09-29029 September 2015 Issuance of Amendment License Amendment Request to Revise the Emergency Action Level Scheme for the Fermi Emergency Plan ML15155B4162015-07-14014 July 2015 Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3 ML15096A0432015-05-0707 May 2015 Issuance of Amendment Cyber Security Plan Implementation Schedule (Tac No. MF4366) NRC-14-0049, Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries2014-06-19019 June 2014 Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries ML13364A1312014-02-10010 February 2014 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML13346B0672014-02-0404 February 2014 Issuance of Amendment Relocation of Pressure and Temperature Curves to a Pressure Temperature Limits Report ML13112A1422013-05-13013 May 2013 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522, Using Consolidated Line Item Improvement Process NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate2013-02-0707 February 2013 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate NRC-13-0001, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process2013-01-11011 January 2013 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process NRC-12-0037, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0071, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2012-11-13013 November 2012 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process NRC-12-0005, Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.22012-01-10010 January 2012 Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.2 NRC-12-0004, Proposed License Amendment to Modify Technical Specification Surveillance Requirements for Safety Relief Valves2012-01-10010 January 2012 Proposed License Amendment to Modify Technical Specification Surveillance Requirements for Safety Relief Valves NRC-11-0049, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration.2011-12-20020 December 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration. NRC-11-0030, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2011-08-12012 August 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. NRC-11-0013, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0808 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1013408512010-05-14014 May 2010 Revised Clean TS Pages NRC-10-0003, Proposed License Amendment to Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests SR 3.5.1.8 and SR 3.5.2.62010-01-0404 January 2010 Proposed License Amendment to Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests SR 3.5.1.8 and SR 3.5.2.6 NRC-09-0022, Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification2009-06-10010 June 2009 Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification NRC-08-0061, Proposed License Amendment to Remove Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specification2008-09-12012 September 2008 Proposed License Amendment to Remove Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specification ML0812808342008-06-25025 June 2008 Tech Spec Pages for Amendment 180 Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirements ML0807900262008-03-17017 March 2008 Issuance of Amendment Technical Specification Change to Emergency Diesel Generator Surveillance Requirements NRC-08-0001, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2008-01-15015 January 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process ML0721404442007-08-0101 August 2007 Tech Spec Pages for Amendment Consolidated Line Item Improvement Process (Cllip) for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation (LCO) 30.9 Regarding the Unavailability of Barriers ML0721407632007-08-0101 August 2007 Technical Specification 3.8.1 Extension of the Completion Time for an Inoperable Diesel Generator Amendment ML0715002322007-04-12012 April 2007 Technical Specifications, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process NRC-07-0012, Proposed License Amendment to Revise the Minimum Emergency Diesel Generator Voltage in Technical Specification 3.8.1 Surveillance Requirements2007-03-19019 March 2007 Proposed License Amendment to Revise the Minimum Emergency Diesel Generator Voltage in Technical Specification 3.8.1 Surveillance Requirements NRC-07-0001, Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2007-01-26026 January 2007 Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML0622004402006-08-0707 August 2006 Technical Specifications, Changes to Address Issues Related to an Inconsistency That Was Inadvertently Introduced During Conversion to Improved TSs When 1 Per Room Replaced 2 as the Required Channels Per Trip System NRC-06-0044, Response to Request for Additional Information for Revision to License Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation2006-07-12012 July 2006 Response to Request for Additional Information for Revision to License Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation NRC-06-0040, Proposed License Amendment Request to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Emergency Diesel Generator2006-07-12012 July 2006 Proposed License Amendment Request to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Emergency Diesel Generator 2024-09-03
[Table view] |
Text
Joseph H. Plona Site Vice President 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.5910 Fax: 734.586.4172 DTE Energy 10 CFR 50.90 January 4, 2010 NRC-10-0003 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington DC 20555-0001
Reference:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Proposed License Amendment to Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests SR 3.5.1.8 and SR 3.5.2.6 Pursuant to 10 CFR 50.90, Detroit Edison hereby proposes to amend the Fermi 2 Plant Operating License, Appendix A, Technical Specifications to revise the Core Spray flow requirement in Technical Specifications Surveillance Requirements 3.5.1.8 and 3.5.2.6 from 6350 to 5725 gallons per minute consistent with the flow assumed in the Emergency Core Cooling System (ECCS) safety analyses. provides an evaluation of the proposed license amendment, including an analysis of the issue of significant hazards consideration using the standards of 10 CFR 50.92. Detroit Edison has concluded that the change proposed in this submittal does not result in a significant hazards consideration. Enclosure 2 provides marked up pages of the existing Technical Specifications to show the proposed change. Enclosure 3 provides a typed version of the affected Technical Specifications pages with the proposed change incorporated. Enclosure 4 provides a copy of the current Technical Specification Bases pages associated with this change for information only. No change is proposed to the current Technical Specification Bases as a result of this license amendment request.
Detroit Edison has reviewed the proposed change against the criteria of 10 CFR 51.22 and has concluded that it meets the criteria provided in 10 CFR 51.22(c)(9) for
USNRC NRC-10-0003 Page 2 a categorical exclusion from the requirements for an Environmental Impact Statement or an Environmental Assessment.
Detroit Edison requests NRC approval of this license amendment by December 30, 2010 with an implementation date within 60 days of NRC approval.
No new commitments are being made in this submittal.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Michigan State Official.
Should you have any questions or require additional information, please contact Mr. Rodney W. Johnson of my staff at (734) 586-5076.
Sincerely, Enclosures cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 4, Region III Regional Administrator, Region III Supervisor, Electric Operators, Michigan Public Service Commission
USNRC NRC-10-0003 Page 3 I, Joseph H. Plona, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
Joseph . Plona Site Vice President, Nuclear Generation On this -* day of 6t-rOLA.YU , 2010 before me personally appeared Joseph H. Plona, being first duly swomrn d says that he executed the foregoing as his free act and deed.
Not--+y Pu STACY OAKES OTRY FPu STATE OFtS I CaM4Y OF MOMNROE GOYciMs0i5N EX'iBES JS, 2c12 AfU COUFTY OF yviaj Vb e 9IN
ENCLOSURE 1 TO NRC-10-0003 FERMI 2 NRC DOCKET NO. 50-341 OPERATING LICENSE NO. NPF-43 PROPOSED LICENSE AMENDMENT TO REVISE THE REQUIRED CORE SPRAY PUMP FLOW RATE IN TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS 3.5.1.8 AND 3.5.2.6 EVALUATION OF THE PROPOSED LICENSE AMENDMENT to NRC-10-0003 Page 1 Evaluation of the Proposed License Amendment
Subject:
Revise the Core Spray Flow of Technical Specifications Surveillance Requirements 3.5.1.8 and 3.5.2.6.
TABLE OF CONTENTS Subject Page 1.0 Description 2 2.0 Proposed Change 2 3.0 Background 2 4.0 Technical Analysis 3 5.0 Regulatory Safety Analysis 5 5.1 No Significant Hazards Consideration 5 5.2 Applicable Regulatory Requirements 8 6.0 Environmental Considerations 8 7.0 References 9 to NRC-10-0003 Page 2 1.0 Description Detroit Edison is requesting NRC approval of this proposed revision to the Fermi 2 Technical Specification (TS) Surveillance Requirements (SRs) 3.5.1.8 and 3.5.2.6 to define a Core Spray flow requirement consistent with the licensing basis accident analysis. This change is requested to provide an improved test margin to core spray surveillance test requirements.
2.0 Proposed Change The current Fermi 2 TS Surveillance Requirements 3.5.1.8 and 3.5.2.6 require that the Core Spray (CS) pumps be tested to demonstrate a flow capability of 6350 gallons per minute (gpm) per division (i.e. for two pumps). It is requested that these surveillance requirements be revised to require CS pumps to demonstrate a flow capability of 5725 gpm per division consistent with the 10 CFR 50.46 and 10 CFR 50 Appendix K analyses, and with the Fermi 2 Technical Specification Bases and the Standard Technical Specifications Bases (NUREG 1433).
3.0 Background The Technical Specifications require each divisional loop of Core Spray (2 pumps) to be capable of providing 6350 gpm with both pumps operating in parallel at a discharge pressure corresponding to a reactor pressure of 100 psig. This flow capability is consistent with the original Appendix K accident analysis for Fermi 2. Beginning with the accident analysis performed for the initial power uprate in June 1991 (References 1 and 2), the ECCS Appendix K safety analyses have assumed a corresponding CS flow of 5725 gpm; however, TS SRs 3.5.1.8 and 3.5.2.6 were not revised to be consistent with the newer safety analyses.
This License Amendment Request provides the technical basis for a change to TS SR 3.5.1.8 and SR 3.5.2.6 to re-align these surveillance requirements with the plant safety analysis.
Historically, the CS system has been capable of meeting the TS SR requirement minimum performance. However, minimum allowed CS pump performance has incrementally increased as a result of recent changes to implement industry and NRC guidance as well as the correction of calculation errors. Specifically, testing margin has been impacted by inclusion of test measuring instrument uncertainties, allowance for Emergency Diesel Generator (EDG) under-frequency, density correction of design accident discharge pressure to test fluid conditions, and additional design allowances for system hydraulic resistance for post-LOCA Emergency Core Cooling System (ECCS) strainer debris loading. Most recently, the Core Spray flow indication used to perform the TS surveillance was identified to contain a non-conservative bias for flows measured under test conditions. Even though actual pump performance over recent years is relatively unchanged and the pump is not considered to be physically degraded, the aggregate effect of these analytical corrections has been a reduction in test margin relative to the plant TS SR 3.5.1.8 and SR 3.5.2.6 minimum flow requirements such that it is possible that a future TS to NRC-10-0003 Page 3 SR result will not pass even though the requirements of the Appendix K safety analysis are satisfied. The requested change is necessary to allow these identified design considerations to be addressed without unnecessarily impacting the ability to demonstrate operability under the Technical Specifications.
4.0 Technical Analysis 10 CFR 50.46, Appendix K ECCS Analyses The Fermi 2 TS Bases for SR 3.5.1.8 state that the performance requirements of the low pressure ECCS pumps are evaluated against the acceptance criteria defined in 10 CFR 50.46 and are determined through application of the 10 CFR 50, Appendix K methodology. Fermi 2 TS SR 3.5.1.8 is performed periodically (on a frequency that complies with the ASME Code,Section XI, requirements for the ECCS pumps) to verify that the ECCS pumps will develop the flow rates required by the respective Appendix K analyses. The TS SR verifies pump outlet pressure is adequate to overcome the elevation head pressure between the pump suction and the vessel discharge, the piping friction losses, and TS SR specified RPV pressure. Fermi 2 TS SR 3.5.1.8 currently requires quarterly demonstration that two divisional CS pumps operating in parallel are capable of providing a minimum flow of 6350 gpm at a discharge head corresponding to a reactor pressure of 100 psig. This test is performed for each of the two CS divisions.
The TS SR is satisfied by throttling CS flow in the test return line to an indicated value that meets or exceeds the TS SR specified flow and verifying that the pump discharge head is sufficient to provide this flow against the system hydraulic resistance corresponding to a reactor pressure of 100 psig as determined in the plant system hydraulic analysis. The analysis demonstrates that this level of performance - adjusted for other factors such as instrument uncertainty, allowance for Emergency Diesel Generator (EDG) under-frequency, and test conditions (e.g. water density) - remains greater than the minimum performance assumed in the Appendix K safety analyses.
At the time of the initial Fermi 2 power uprate from 3293 Megawatts thermal (MWt) to 3430 MWt granted under Fermi 2 License Amendment 87 (Reference 2), the Fermi 2 Appendix K safety analyses were revised to assume lower core delivered flow. The SAFER/GESTR analysis results (Reference 1), Table 4-1, submitted in support of this uprate and subsequent analyses assume CS flows per division (2 pumps) equal to 5625 gpm. This value is the flow rate to the core and does not include an assumed 100 gpm Core Spray leakage through slip joints and vent holes that is assumed by the methodology to bypass the core (References 3 and 4, Appendix A, Section N1). This revised minimum analyzed CS flow was reflected in the Updated Final Safety Analysis (UFSAR) Table 6.3-6, "ECCS Analysis Significant Input Variables and Initial Conditions" as part of the implementation of License Amendment 87, but was not reflected in TS SR 3.5.1.8 and SR 3.5.2.6 in conjunction with this license change.
to NRC-10-0003 Page 4 The most recent General Electric-Hitachi SAFER/GESTR analysis proprietary results for GE-11 fuel (Reference 3) and for GE-14 fuel (Reference 4) were submitted to the NRC in support of a re-analysis of the LOCA pursuant to 10 CFR 50.46. These results were reviewed and approved in an NRC Safety Evaluation (Reference 5). These most recent analyses also assume the same divisional CS Flow of 5625 gpm, not including the 100 gpm assumed core bypass flow.
This submittal requests revision of Fermi 2 TS SRs 3.5.1.8 and 3.5.2.6 to change the specified test flow requirement from 6350 gpm to 5725 gpm. This change establishes consistency of the SRs with the current reviewed and approved Appendix K design basis and provides for a test margin between the TS surveillance requirements and measured pump performance. As stated in the current TS Bases, the corresponding system head pressure accounts for elevation head between the pump suction and the vessel discharge, piping friction losses, and the TS SR specified RPV pressure. This request will not affect the TS SR specified RPV pressure requirement, which remains unchanged. Since the proposed change in the TS SR requirement does not impact Core Spray System performance as demonstrated in the current reviewed and approved safety analyses, current compliance with 10CFR50.46 limits on post-LOCA fuel clad performance remains unaffected.
Fermi 2 TS SR 3.5.2.6 requires each loop of the CS system to be capable of meeting the same functional performance as TS SR 3.5.1.8. As stated in the current TS Bases, the Bases provided for SR 3.5.1.8 are also applicable to SR 3.5.2.6. This TS SR is therefore revised consistent with TS SR 3.5.1.8.
Due to a throttling limitation in the Fermi 2 Core Spray system test lines, CS pumps cannot be individually tested. Inservice Testing Relief Requests have been approved since the original licensing of the plant to perform parallel pump testing of core spray pumps. A modification plan is currently being finalized that will allow for individual pump testing as well as providing more precise throttling capability. It is planned that quarterly testing of both Core Spray Pumps in a Division in parallel will continue to be performed until the test line modifications have been completed and placed in service. The acceptance criteria necessary to satisfy the revised TS SRs would be established in the plant design basis in the form of the minimum required pump performance defined for a range of flows above the specified TS SR flow. Detroit Edison intends to continue TS SR and IST pump testing at the current IST pump baseline and establish compliance with the TS SR by comparing the measured performance against the design minimum pump curve.
Other Potentially Impacted Functions Containment Analysis:
The ECCS flow rates are also inputs to the analysis of the post-LOCA primary containment temperature pressure response. The current containment analysis assumes a CS flow of 6350 gpm per division. Relative to this design basis, the proposed change has been evaluated and was determined to not impact the short-term containment response, which covers the initial reactor to NRC-10-0003 Page 5 vessel blowdown period, because the initial reactor thermal-hydraulic conditions that govern the blowdown flow rate to the containment do not change. With respect to the long-term containment response, the analysis is directed primarily at the suppression pool temperature response. This response is not impacted because it is governed by the thermal performance of the Residual Heat Removal (RHR) heat exchangers, which is unaffected by a reduction in CS flow. Therefore, a change to the containment analysis is not necessary to support the requested change to the Core Spray Surveillance Requirements.
EDG Connected Loads:
UFSAR Table 8.3-2 provides EDG loading data associated with different levels of ECCS pump delivered flow. The current EDG loading evaluation is based on higher flow rates than the flow assumed in the ECCS safety analysis; therefore, the impact of CS flow on the design bases associated with EDG electrical loading (for example, EDG capacity and fuel consumption) is conservatively bounded under the proposed CS surveillance requirement, and testing CS against the lower performance assumed in the Appendix K analyses does not adversely impact the UFSAR description of EDG design.
Technical Analysis Conclusion This evaluation provides the technical basis to support a revision of Fermi 2 Technical Specification Surveillance Requirements 3.5.1.8 and 3.5.2.6 for Core Spray (two pump) minimum flow from 6350 gpm to 5725 gpm at a discharge head corresponding to a reactor pressure of 100 psig. This is consistent with the safety analyses performed for the current uprated power condition (Reference 1) and subsequent analyses. The 5725 gpm surveillance requirement is determined from the 5625 gpm core spray flow used in the safety analyses plus the 100 gpm of Core Spray flow assumed by the methodology to bypass the core.
The containment analysis is not impacted because short-term maximum containment pressure occurs before ECCS injection commences. With respect to the long-term containment response, the analysis is directed primarily at the suppression pool temperature response. This response is not impacted because it is governed by the thermal performance of the Residual Heat Removal (RHR) heat exchangers, which is unaffected by a reduction in CS flow. Analyses involving EDG loading do not credit reduced Core Spray flow used in the ECCS safety analysis and are therefore conservative.
5.0 Regulatory Safety Analysis 5.1 No Significant Hazards Consideration In accordance with 10 CFR 50.92, Detroit Edison has made a determination that the proposed amendment involves no significant hazards consideration. The proposed change to Core Spray Pump required flow in Technical Specification Surveillance Requirements 3.5.1.8 and 3.5.2.6 to NRC-10-0003 Page 6 from 6350 to 5725 gallons per minute (gpm) does not involve a significant hazards consideration for the following reasons:
- 1. The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The minimum performance requirements of the low pressure Emergency Core Cooling System (ECCS) pumps, including the Core Spray pumps, are determined through application of the 10 CFR 50, Appendix K methodology to ensure the criteria of 10 CFR 50.46 are satisfied. The surveillance testing of the Core Spray pumps is performed periodically in accordance with the ASME Code,Section XI verifies that two Core Spray pumps in parallel operation within a single division develop sufficient discharge pressure at the Technical Specification required flow to overcome the elevation head pressure between the pump suction and the vessel discharge, the piping friction losses, and TS SR specified Reactor Pressure Vessel pressure. The acceptance criteria necessary to satisfy the revised TS SRs would be established in the plant design basis in the form of the minimum required pump performance defined for a range of flow about the specified TS SR flow. Detroit Edison intends to continue TS SR and IST pump testing at the current IST pump baseline flow and establish compliance with the TS SR by comparing the measured performance against the design minimum pump curve. In this manner, the minimum actual delivered divisional Core Spray pump performance is assured to meet or exceed that required by the Appendix K safety analyses. These performance requirements are unchanged and are met by the proposed change.
The bases for the core spray flow requirements in the Technical Specifications Surveillance Requirements are unchanged. The requirements are selected based on the flow values assumed and used in the current ECCS safety analyses. The value proposed for core spray divisional (2 pump) flow is consistent with the inputs used for ECCS safety analyses performed for the current licensed power level.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed change revises the Technical Specification Surveillance Requirements for Core Spray flow to be consistent with the accident analysis. No physical changes are being made to the installed core spray system. The proposed surveillance requirements are consistent with those used in the accident analyses which analyze the effect of Core Spray system performance for the accident conditions for which the system is designed to respond. No new or different accident scenarios are created by this change.
to NRC-10-0003 Page 7 Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. The proposed change does not involve a significant reduction in the margin of safety.
The Core Spray system has historically been capable of meeting the Core Spray Technical Specification Surveillance Requirements. However, correction of non-conservative errors in the system hydraulic calculation and the identification of a non-conservative bias in the test flow instrument calibration have eroded the test margin such that it is possible that the Technical Specification Surveillance Requirements may not be satisfied for some surveillances and at the same time maintain a relatively large margin compared to the minimum performance assumed in the ECCS safety analyses. These non-conservative errors or biases have always existed, but have not always been specifically accounted for in the surveillance testing acceptance criteria. Since there is no change in the Technical Specification bases associated with the requested change, there is no real change in the margin provided in the system design or analyses. The proposed change makes the margin between the current Core Spray Technical Specification Surveillance Requirements and the performance assumed in the plant safety analyses available as a design and test margin.
The minimum required performance necessary to satisfy the Core Spray Technical Specification Surveillance Requirements will be established in the plant design basis with the minimum required pump performance adjusted upward as necessary to account for instrument uncertainty and bias as well as differences between assumed accident and actual test operating conditions.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, Detroit Edison has determined that the proposed license amendment does not involve a significant hazards consideration.
to NRC-10-0003 Page 8 5.2 Applicable Regulatory Requirements 10 CFR 50.46 requires nuclear plants to be provided with emergency core cooling systems that must be designed so that its calculated cooling performance following postulated loss-of-coolant accidents conforms to a specified criteria. ECCS cooling performance must be calculated in accordance with an acceptable evaluation model and must be calculated for a number of postulated loss-of-coolant accidents of different sizes, locations, and other properties sufficient to provide assurance that the most severe postulated loss-of-coolant accidents are calculated. The evaluation model must include sufficient supporting justification to show that the analytical technique realistically describes the behavior of the reactor system during a loss-of-coolant accident. Comparisons to applicable experimental data must be made and uncertainties in the analysis method and inputs must be identified and assessed so that the uncertainty in the calculated results can be estimated. This uncertainty must be accounted for, so that, when the calculated ECCS cooling performance is compared to the criteria set forth in 10 CFR 50.46, there is a high level of probability that the criteria would not be exceeded. Appendix K, Part II "Required Documentation" sets forth the documentation requirements for each evaluation model.
The SAFER/GESTR LOCAAnalyses (References 1, 3 and 4) discussed in this submittal meet these requirements and are unchanged by the requested Core Spray Surveillance Requirement change.
The Fermi 2 Core Spray TS SR 3.5.1.8, and SR 3.5.2.6 are performed periodically (on a frequency that complies with the ASME Code,Section XI, requirements for the ECCS pumps) to verify that the ECCS pumps will develop the flow rates required by the respective Appendix K analyses. The pump flow rates are verified against a system head equivalent to the RPV pressure expected during a LOCA. The total system pump outlet pressure is adequate to overcome the elevation head pressure between the pump suction and the vessel discharge, the piping friction losses, and RPV pressure present during a LOCA. Surveillances are required to be performed on a quarterly basis to demonstrate that two divisional Core Spray pumps operating in parallel are capable of providing the TS SR minimum specified flow at a discharge head corresponding to a reactor pressure of 100 psig. The flow corresponds to the divisional core spray flow assumed in the safety analyses. This test is performed for each of the two Core Spray divisions. There are no changes in the testing bases.
6.0 Environmental Considerations Detroit Edison has reviewed the proposed change against the criteria of 10 CFR 51.22 for environmental considerations. The proposed change does not involve a significant hazards consideration, nor does it significantly change the types or significantly increase the amounts of effluents that may be released offsite. The proposed change does not significantly increase individual or cumulative occupational radiation exposures. Based on the foregoing, Detroit Edison concludes that the proposed change meets the criteria provided in 10 CFR 51.22(c)(9) for a categorical exclusion from the requirements for an Environmental Impact Statement or an Environmental Assessment.
to NRC-10-0003 Page 9 7.0
References:
- 1) NEDC-31982P, "Fermi 2 SAFER/GESTR-LOCA Loss of Coolant Accident Analysis," dated July 1991, submitted to the NRC by Detroit Edison as Attachment 5 to Letter NRC-91-0102, "Proposed License Amendment -
Uprated Power Operation," dated September 24, 1991.
- 2) Fermi 2 Amendment 87, dated September 9, 1992 (ML020720520)
- 3) GE-NE-0000-0047-1716-R1, "Fermi 2 SAFER/GESTR Loss-of-Coolant Accident Analysis for GE11 Fuel," dated June 2008, submitted under Detroit Edison letter NRC-08-0046, "Submittal of Plant Specific Emergency Core Cooling System (ECCS)
Evaluation Model Reanalysis," dated June 23, 2008. (ML081830408).
- 4) GE-NE-0000-0030-6565-R1, "Fermi 2 SAFER/GESTR- Loss-of-Coolant Accident Analysis for GE14 Fuel," dated June 2008, submitted under Detroit Edison letter NRC-08-0046, "Submittal of Plant Specific Emergency Core Cooling System (ECCS)
Evaluation Model Reanalysis," dated June 23, 2008. (ML081830408).
- 5) "Fermi 2 -Approval of Plant Specific Emergency Core Cooling System (ECCS)
Evaluation Model Reanalysis," dated June 30, 2009. (TAC NO. MD9169)
(ML091740255).
ENCLOSURE 2 TO NRC-10-0003 FERMI 2 NRC DOCKET NO. 50-341 OPERATING LICENSE NO. NPF-43 PROPOSED LICENSE AMENDMENT TO REVISE THE REQUIRED CORE SPRAY PUMP FLOW RATE IN TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS SR 3.5.1.8 AND SR 3.5.2.6 MARKED-UP TS PAGE Affected Pages:
3.5-6 and 3.5-11
ECCS - Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.1.8 Verify the following ECCS pumps develop the In accordance specified flow rate against a system head with the corresponding to the specified reactor Inservice pressure. Testing SYSTEM HEAD Program NO. CORRESPONDING OF TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF Core 5725 Spray a635 gpm 2 2 100 psig LPCI Ž 10,000 gpm 1 2 20 psig SR 3.5.1.9 ------------------- NOTE------------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure < 1045 and In accordance 2 945 psig, the HPCI pump can develop a with the flow rate 2 5000 gpm against a system head Inservice corresponding to reactor pressure. Testing Program SR 3.5.1.10 ------------------- NOTE-----------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure
- 215 psig, 18 months the HPCI pump can develop a flow rate
> 5000 gpm against a system head corresponding to reactor pressure.
(continued)
FERMI - UNIT 2 3.5-6 Amendment No. 134
ECCS - Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.5 ------------------- NOTE--------------------
LPCI subsystem(s) may be considered OPERABLE during alignment and operation for decay heat removal if capable of being manually realigned and not otherwise inoperable.
Verify each required ECCS injection/spray 31 days subsystem manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
SR 3.5.2.6 Verify each required ECCS pump develops the In accordance specified flow rate against a system head with the corresponding to the specified reactor Inservice pressure. Testing SYSTEM HEAD Program NO. CORRESPONDING OF TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF CS >l gpm 2 Ž 100 psig LPCI Ž 10,000 gpm 1 Ž 20 psig SR 3.5.2.7 ------------------- NOTE -----------------
Vessel injection/spray may be excluded.
Verify each required ECCS injection/spray 18 months subsystem actuates on an actual or simulated automatic initiation signal.
FERMI - UNIT 2 3.5-11 Amendment No. 134
ENCLOSURE 3 TO NRC-10-0003 FERMI 2 NRC DOCKET NO. 50-341 OPERATING LICENSE NO. NPF-43 PROPOSED LICENSE AMENDMENT TO REVISE THE REQUIRED CORE SPRAY PUMP FLOW RATE IN TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS SR 3.5.1.8 AND SR 3.5.2.6 CLEAN TS PAGES New Pages:
3.5-6 and 3.5-11
ECCS-Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.1.8 Verify the following ECCS pumps develop the In accordance specified flow rate against a system head with the corresponding to the specified reactor Inservice pressure. Testing SYSTEM HEAD Program NO. CORRESPONDING OF TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF Core Spray Ž 5725 gpm 2 Ž 100 psig LPCI Ž 10,000 gpm 1 > 20 psig SR 3.5.1.9 ------------------- NOTE -----------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure < 1045 and In accordance
> 945 psig, the HPCI pump can develop a with the flow rate 2 5000 gpm against a system head Inservice corresponding to reactor pressure. Testing Program SR 3.5.1.10 ------------------- NOTE------------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure
- 215 psig, 18 months the HPCI pump can develop a flow rate 2 5000 gpm against a system head corresponding to reactor pressure.
(continued)
FERMI - UNIT 2 3.5-6 Amendment No. 134
ECCS-Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.5 -----------------. NOTE------------------
LPCI subsystem(s) may be considered OPERABLE during alignment and operation for decay heat removal if capable of being manually realigned and not otherwise inoperable.
Verify each required ECCS injection/spray 31 days subsystem manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
SR 3.5.2.6 Verify each required ECCS pump develops the In accordance specified flow rate against a system head with the corresponding to the specified reactor Inservice pressure. Testing SYSTEM HEAD Program NO. CORRESPONDING OF TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF CS Ž 5725 gpm 2 Ž 100 psig LPCI Ž 10,000 gpm 1 Ž 20 psig SR 3.5.2.7 ------------------- NOTE -----------------
Vessel injection/spray may be excluded.
Verify each required ECCS injection/spray 18 months subsystem actuates on an actual or simulated automatic initiation signal.
FERMI - UNIT 2 3.5-11 Amendment No. 134
ENCLOSURE 4 TO NRC-10-0003 FERMI 2 NRC DOCKET NO. 50-341 OPERATING LICENSE NO. NPF-43 PROPOSED LICENSE AMENDMENT TO REVISE THE REQUIRED CORE SPRAY PUMP FLOW RATE IN TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS SR 3.5.1.8 AND SR 3.5.2.6 TS BASES PAGES (Unchanged, For Information Only)
Related pages:
B 3.5.1-14, B 3.5.1-18, B 3.5.2-5
ECCS-Operating B 3.5.1 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.5.1.8, SR 3.5.1.9, and SR 3.5.1.10 The performance requirements of the low pressure ECCS pumps are determined through application of the 10 CFR 50, Appendix K criteria (Ref. 8). This periodic Surveillance is performed (in accordance with the ASME Code,Section XI, requirements for the ECCS pumps) to verify that the ECCS pumps will develop the flow rates required by the respective analyses. The low pressure ECCS pump flow rates ensure that adequate core cooling is provided to satisfy the acceptance criteria of Reference 10. The pump flow rates (for Core Spray, 2 pumps in parallel operation) are verified against a system head equivalent to the RPV pressure expected during a LOCA. The total system pump outlet pressure is adequate to overcome the elevation head pressure between the pump suction and the vessel discharge, the piping friction losses, and RPV pressure present during a LOCA. These values may be established during preoperational testing.
Actual testing is performed via the test flow path against test line pressures established in Reference 17.
The flow tests for the HPCI System are performed at two different pressure ranges such that system capability to provide rated flow is tested at both the higher and lower operating ranges of the system. Additionally, adequate steam flow must be passing through the main turbine or turbine bypass valves to continue to control reactor pressure when the HPCI System diverts steam flow. Reactor steam pressure must be Ž 945 psig to perform SR 3.5.1.9 and Ž 165 psig to perform SR 3.5.1.10. Adequate steam flow is represented by main turbine generator on line or turbine bypass valves open at least 15% in auto-pressure control.
Therefore, sufficient time is allowed after adequate pressure and flow are achieved to perform these tests.
Reactor startup is allowed prior to performing the low pressure Surveillance test because the reactor pressure is low and the time allowed to satisfactorily perform the Surveillance test is short. The reactor pressure is allowed to be increased to normal operating pressure since it is assumed that the low pressure test has been satisfactorily completed and there is no indication or reason to believe that HPCI is inoperable.
FERMI - UNIT 2 B 3.5.1-14 Revision 50
ECCS-Operating '
B 3.5.1 BASES REFERENCES 1. UFSAR, Section 6.3.2.2.3.
- 2. UFSAR, Section 6.3.2.2.4.
- 3. UFSAR, Section 6.3.2.2.1.
- 4. UFSAR, Section 6.3.2.2.2.
- 5. UFSAR, Section 15.2.7.
- 6. UFSAR, Section 15.6.4.
- 7. UFSAR, Section 15.6.5.
- 8. 10 CFR 50, Appendix K.
- 9. UFSAR, Section 6.3.3.
- 10. 10 CFR 50.46.
- 11. UFSAR, Section 6.3.3.3.
- 12. Memorandum from R.L. Baer (NRC) to V. Stello, Jr.
(NRC), "Recommended Interim Revisions to LCOs for ECCS Components," December 1, 1975.
- 13. UFSAR, Table 6.3-6.
- 14. UFSAR, Section 5.2.2.2.3.
- 15. Technical Requirements Manual.
- 16. NEDO-32291, "System Analyses for Elimination of Selected Response Time Testing Requirements," January 1994; and Fermi-2 SER for Amendment 111, dated April 18, 1997.
- 17. DC-5079 Vol I, RHR & CSS Technical Specification Surveillance Pump Discharge Pressures.
FERMI - UNIT 2 B 3.5.1-18 Revision 5Q.
ECCS- Shutdown B 3.5.2
( BASES SURVEILLANCE REQUIREMENTS (continued) provide adequate.makeup if the.RPV were completely drained.
Therefore, only one CS subsystem is allowed to use the CST.
This.ensures the other required ECCS subsystem has adequate makeup volume.
The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency of these SRs was developed considering operating experience related to suppression pool water level and CST water level variations and instrument drift during the applicable MODES. Furthermore, the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered adequate in view of other indications available in the control room, including alarms, to alert the operator to an abnormal suppression pool or CST water level condition.
SR 3.5.2.3 The LPCI System injection valves, recirculation pump discharge valves, and LPCI cross-tie valve are powered from the LPCI swing bus, which must remain energized to support OPERABILITY of any required LPCI subsystem. Therefore, verification of proper voltage and correct breaker alignment to the swing bus is made every 7 days. The correct breaker alignment ensures the appropriate electrical power sources are available, and the appropriate voltage is available to the swing-bus, including verification that the swing bus is energized. The verification of proper voltage availability ensures that the required voltage is readily available for critical system loads connected to this bus.. The 7 day Frequency takes into account the redundant capability of the AC, DC, and AC swing bus electrical power sources, and other indications available in the control room that alert the operator to subsystem malfunctions.
SR 3'.5.2.4, SR 3.5.2.6, and SR 3.5.2.7 The Bases provided for SR 3.5.1.3,'SR 3.5.1.8, and SR 3.5.1.11 are applicable to SR 3.5.2.4, SR 3.5.2.6, and SR 3.5.2.7, respectively.
FERMI - UNIT 2 B 3.5.2- 5 Revision 15