Similar Documents at Fermi |
---|
Category:Environmental Monitoring Report
MONTHYEARNRC-24-0046, Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance2024-07-25025 July 2024 Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-24-0017, 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report NRC-24-0018, 2023 Annual Non-Radiological Environmental Operating Report2024-04-0909 April 2024 2023 Annual Non-Radiological Environmental Operating Report ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 NRC-23-0018, Annual Non-Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Non-Radiological Environmental Operating Report NRC-22-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-22-0022, Annual Non-Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Non-Radiological Environmental Operating Report NRC-21-0026, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-20-0063, Approval from the Michigan Department of Environment, Great Lakes and Energy to Reduce Monitoring Frequency for Total Copper and Total Phosphorus at the DTE Electric Company - Enrico Fermi 2 Power Plant2020-10-20020 October 2020 Approval from the Michigan Department of Environment, Great Lakes and Energy to Reduce Monitoring Frequency for Total Copper and Total Phosphorus at the DTE Electric Company - Enrico Fermi 2 Power Plant NRC-20-0027, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2020-04-29029 April 2020 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-20-0028, Annual Non-Radiological Environmental Operating Report2020-04-27027 April 2020 Annual Non-Radiological Environmental Operating Report NRC-19-0034, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-19-0033, Annual Non-Radiological Environmental Operating Report2019-04-30030 April 2019 Annual Non-Radiological Environmental Operating Report NRC-18-0026, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2018-04-30030 April 2018 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-18-0027, Annual Non-Radiological Environmental Operating Report for 20172018-04-24024 April 2018 Annual Non-Radiological Environmental Operating Report for 2017 NRC-17-0038, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2017-04-27027 April 2017 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-16-0029, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2016-04-29029 April 2016 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-15-0052, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report for 20142015-04-29029 April 2015 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report for 2014 NRC-15-0054, Annual Non-Radiological Environmental Operating Report for 20142015-04-29029 April 2015 Annual Non-Radiological Environmental Operating Report for 2014 NRC-13-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2013-04-30030 April 2013 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-12-0029, Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report2012-04-27027 April 2012 Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report NRC-12-0031, Annual Non-Radiological Environmental Operating Report for 20112012-04-25025 April 2012 Annual Non-Radiological Environmental Operating Report for 2011 ML12068A1472012-02-13013 February 2012 Attachments 3 (Continued) to NRC-12-0012 - Updated Fermi, 1 Groundwater Monitoring Data, Onsite Laboratory Analytical Results NRC-12-0012, Attachments 3 (Continued)-6 to NRC-12-0012 - Updated Fermi, 1 Groundwater Monitoring Data, Onsite Laboratory Analytical Results, Site Conceptual Model Recommendations and Actions and Monitoring Well Groundwater Elevations and Maps2012-02-13013 February 2012 Attachments 3 (Continued)-6 to NRC-12-0012 - Updated Fermi, 1 Groundwater Monitoring Data, Onsite Laboratory Analytical Results, Site Conceptual Model Recommendations and Actions and Monitoring Well Groundwater Elevations and Maps ML12068A1312012-02-13013 February 2012 Attachments 3 (Continued) to NRC-12-0012 - Updated Fermi, 1 Groundwater Monitoring Data, Onsite Laboratory Analytical Results ML12068A1292012-02-13013 February 2012 Attachments 1-3 to NRC-12-0012 - Updated Fermi, 1 Groundwater Monitoring Data, Updated Table of Analytical Results, Update of Table in Attachment 1 of Reference 2, Updated Table of Comparison of Analytical Results to Background, Attachment ML1120106192011-07-0707 July 2011 Theodore Smith Ltr Final-Report No. 2: Independent Confirmatory Survey Summary and Results for the Enrico Fermi Atomic Power Plant, Unit 1, Newport, Michigan NRC-11-0016, Annual Radiological Environmental Operating Report, Radioactive Effluent Release Report and Revised Offsite Dose Calculation Manual2011-04-28028 April 2011 Annual Radiological Environmental Operating Report, Radioactive Effluent Release Report and Revised Offsite Dose Calculation Manual NRC-11-0023, Submittal of Annual Non-Radiological Environmental Operating Report2011-04-27027 April 2011 Submittal of Annual Non-Radiological Environmental Operating Report NRC-10-0038, Annual Non-Radiological Environmental Operating Report for 20092010-04-28028 April 2010 Annual Non-Radiological Environmental Operating Report for 2009 NRC-09-0030, Submittal of Annual Non-Radiological Environmental Operating Report2009-04-24024 April 2009 Submittal of Annual Non-Radiological Environmental Operating Report NRC-09-0024, Fermi 2 - 2008 Annual Radiological Environmental Operating Report2008-12-31031 December 2008 Fermi 2 - 2008 Annual Radiological Environmental Operating Report ML0912604792008-12-31031 December 2008 Fermi 2 - 2008 Annual Radiological Environmental Operating Report NRC-09-0024, 2008 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual for 2008 Revisions2008-12-31031 December 2008 2008 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual for 2008 Revisions ML0832903512008-11-19019 November 2008 Orise Letter Report for Analytical Results for Three Soil Samples from Enrico Fermi Unit 1, Monroe, Michigan NRC-08-0037, Annual Non-Radiological Environmental Operating Report for 20072008-04-24024 April 2008 Annual Non-Radiological Environmental Operating Report for 2007 NRC-07-0020, Annual Radiological Effluent Release and Radiological Environmental Operating Reports2007-04-27027 April 2007 Annual Radiological Effluent Release and Radiological Environmental Operating Reports NRC-07-0021, Annual Non-Radiological Environmental Operating Report for 20062007-04-26026 April 2007 Annual Non-Radiological Environmental Operating Report for 2006 NRC-06-0031, 2005 Annual Radioactive Effluent Release and Radiological Environmental Operating Reports2006-04-28028 April 2006 2005 Annual Radioactive Effluent Release and Radiological Environmental Operating Reports NRC-06-0030, Annual Non-Radiological Environmental Operating Report2006-04-25025 April 2006 Annual Non-Radiological Environmental Operating Report NRC-05-0036, Annual Non-Radiological Environmental Operating Report for 20042005-04-29029 April 2005 Annual Non-Radiological Environmental Operating Report for 2004 NRC-04-0024, Annual Radioactive Effluent Release and Radiological Environmental Operating Reports2004-04-30030 April 2004 Annual Radioactive Effluent Release and Radiological Environmental Operating Reports NRC-04-0026, 2003 Annual Non Radiological Environmental Operating Report for Fermi 22004-04-30030 April 2004 2003 Annual Non Radiological Environmental Operating Report for Fermi 2 NRC-02-0033, Annual Radioactive Effluent Release & Radiological Environmental Operating Reports2002-04-25025 April 2002 Annual Radioactive Effluent Release & Radiological Environmental Operating Reports 2024-07-25
[Table view] Category:Letter type:NRC
MONTHYEARNRC-24-0064, Supplement to License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2024-10-31031 October 2024 Supplement to License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-24-0058, Status of License Renewal Commitments2024-10-0303 October 2024 Status of License Renewal Commitments NRC-24-0057, Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report2024-09-0303 September 2024 Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report NRC-24-0053, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 20242024-08-30030 August 2024 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 2024 NRC-24-0050, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2024-08-12012 August 2024 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-24-0048, Submittal of Inservice Inspection Summary Report2024-08-0606 August 2024 Submittal of Inservice Inspection Summary Report NRC-24-0046, Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance2024-07-25025 July 2024 Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-24-0020, Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan2024-07-24024 July 2024 Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-24-0044, Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License)2024-07-10010 July 2024 Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License) NRC-24-0041, Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report2024-06-21021 June 2024 Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report NRC-24-0042, Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data2024-06-18018 June 2024 Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data NRC-24-0040, Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-00332024-06-0606 June 2024 Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-0033 NRC-24-0033, DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-05-30030 May 2024 DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0017, 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report NRC-24-0032, Transmittal of the Core Operating Limits Report for Cycle 232024-04-25025 April 2024 Transmittal of the Core Operating Limits Report for Cycle 23 NRC-24-0027, Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-04-24024 April 2024 Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter NRC-24-0018, 2023 Annual Non-Radiological Environmental Operating Report2024-04-0909 April 2024 2023 Annual Non-Radiological Environmental Operating Report NRC-24-0015, Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report2024-03-31031 March 2024 Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report NRC-24-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion2024-03-21021 March 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion NRC-24-0019, Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2024-03-14014 March 2024 Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-24-0023, NRC-24-0023, Post Exam Package Submittal Letter to NRC2024-03-0707 March 2024 NRC-24-0023, Post Exam Package Submittal Letter to NRC NRC-24-0008, Levels and Sources of Property Insurance Coverage2024-02-15015 February 2024 Levels and Sources of Property Insurance Coverage NRC-24-0009, Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 22024-02-0606 February 2024 Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 2 NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0075, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation2023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi 2024-09-03
[Table view] |
Text
April 9, 2024 NRC-24-0018 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 F e1mi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43 DTE Electric Company 6400 N. Dixie Highway Newport, l\\U 48166 DTE
Subject:
Annual Non-Radiological Enviromnental Operating Report Pursuant to the Fenni 2 Operating License, Appendix B, "Environmental Protection Plan,"
Section 5.4.1, DTE Electric Company hereby submits the 2023 Annual Non-Radiological Enviromnental Operating Rep011 for Fenni 2.
No new collllllitments are being made in this submittal.
Should you have any questions or require additional infonnation, please contact me at (734) 586-4 772.
Sincerely,
~~
v~q/a64.b~
Delegate for Manager - Nuclear Licensing per NANL-23-0007 Eric Frank Manager - Nuclear Licensing
Enclosure:
2023 Annual Non-Radiological Environmental Operating Rep011 cc: NRC Project Manager NRC Resident Office Regional Administrator, Region ill
Enclosure to NRC-24-0018 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 2023 Annual Non-Radiological Environmental Operating Report
2023 Annual Non-Radiological Environmental Operating Report DTE Electric Company - Fermi 2 6400 North Dixie Highway Newport, MI 48166 Reporting Period:
January 1, 2023 to December 31, 2023 Enclosure to NRC-24-0018 Page 1 of 10
2023 Annual Non-Radiological Environmental Operating Report DTE Electric Company - Fermi 2 Page 1 2023 ANNUAL NON-RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT TABLE OF CONTENTS Section Number Page Number 1.0 EXECUTIVE
SUMMARY
.................................................................................... 2
2.0 INTRODUCTION
.................................................................................................. 3 2.1 Purpose 3
2.2 Environmental Protection Plan Overview 3
2.3 Annual Report Objectives 4
2.4 Site Description 5
3.0 TERRESTRIAL MONITORING........................................................................... 5 4.0 HERBICIDE MONITORING................................................................................ 6 5.0 AQUATIC MONITORING.................................................................................... 7 6.0 ENVIRONMENTAL PROTECTION PLAN NON-COMPLIANCES................. 8 7.0 DESIGN OR OPERATION CHANGES................................................................ 9 8.0 UNUSUAL OR IMPORTANT ENVIRONMENTAL EVENTS........................... 9
9.0 CONCLUSION
S..................................................................................................... 9 Enclosure to NRC-24-0018 Page 2 of 10
2023 Annual Non-Radiological Environmental Operating Report DTE Electric Company - Fermi 2 Page 2 2023 ANNUAL NON-RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT 1.0 EXECUTIVE
SUMMARY
The following is a summary of the 2023 Annual Non-Radiological Environmental Operating Report for the DTE Electric Company - Enrico Fermi Unit 2 Power Plant (Fermi 2):
- No terrestrial monitoring activities were conducted or required to comply with the Fermi 2 Operating License. Based on the findings of the terrestrial monitoring program, which was concluded in 1994, no further aerial-photographic evaluations are planned.
ITC Transmission currently owns and operates the transmission infrastructure, including the corridor rights-of-way where herbicides are applied. ITC vegetation managers confirmed that in 2023 ITC applied herbicide to 194.64 acres in the Brownstown-Fermi corridor and 468.5 acres in the Wayne-Monroe corridor.
- During the period covered by this report, there were no changes to station design that created an unreviewed environmental question, per the requirements and definitions of the Environmental Protection Plan (EPP).
- No unusual or important environmental events, as defined by the EPP, occurred.
Accordingly, no nonroutine reports were submitted.
- There was 1 incident of noncompliance with the Fermi 2 National Pollutant Discharge Elimination System (NPDES) Permit.
Enclosure to NRC-24-0018 Page 3 of 10
2023 Annual Non-Radiological Environmental Operating Report DTE Electric Company - Fermi 2 Page 3 2023 ANNUAL NON-RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT
2.0 INTRODUCTION
2.1 Purpose The purpose of this report is to provide the Nuclear Regulatory Commission (NRC), site personnel, and the public with information regarding the implementation of the Non-Radiological Environmental Protection Plan (EPP) at the DTE Electric Company - Enrico Fermi Unit 2 Power Plant (Fermi 2). This report is due prior to May 1 of each year and meets the requirements specified in Section 5.4.1 of the Fermi 2 Non-Radiological EPP, which is included in Appendix B of Facility Operating License No. NPF-43.
2.2 Environmental Protection Plan Overview As part of the application for the nuclear power plant construction permit and operating license, extensive environmental studies were conducted to evaluate potential non-radiological environmental risks that could result from the construction and operation of Fermi 2. In August 1981, the NRC published the Final Environmental Statement (FES) for the operation of Fermi 2. The FES was developed pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations (CFR), Part 51.
The EPP was prepared, based on the potential environmental risks and monitoring requirements identified in the FES. The purpose of the EPP is to provide for the protection of the environment during any additional construction and the continued operation of Fermi
- 2. The principle objectives of the EPP are as follows:
- 1. Verify that Fermi 2 is operated in an environmentally acceptable manner, as established by the FES and Environmental Impact assessments.
- 2. Coordinate NRC requirements and maintain consistency with other Federal, State and local requirements for environmental protection.
- 3. Keep the NRC informed of the environmental effects of facility construction and operation, and of actions taken to control those effects.
Enclosure to NRC-24-0018 Page 4 of 10
2023 Annual Non-Radiological Environmental Operating Report DTE Electric Company - Fermi 2 Page 4 The components of the EPP are as follows:
- 1. A terrestrial monitoring program to detect long-term or sudden changes in vegetation that may be attributable to the dispersion of Fermi 2 cooling tower vapor. The terrestrial monitoring program was completed in 1994, after 4 successive monitoring cycles were completed, as required.
- 2. A program to establish the controlled use of herbicides within transmission rights-of-way.
- 3. A program to ensure that changes to Fermi 2 design or operation and potential tests or experiments are adequately reviewed prior to implementation to avoid adverse environmental impacts not previously evaluated. Changes in plant design, operation, tests or experiments which do not affect the environment, or which are required to achieve compliance with other Federal, State or local environmental regulations, are not subject to the requirements of this EPP.
- 4. Routine monitoring for evidence of unusual or important environmental events.
- 5. Any changes, renewals or stayed appeals to the Fermi 2 National Pollution Discharge Elimination System (NPDES) Permit, or the State certification, must be reported to the NRC within 30 days.
2.3 Annual Report Objectives According to Section 5.4.1 of the EPP, the required objectives of the Annual Report are as follows:
- Provide summaries and analyses of the results of environmental protection activities conducted in the following areas: unusual or important environmental events and terrestrial monitoring (includes aerial remote sensing and herbicide application). Where applicable, the report should compare these activities to pre-operational studies, operational controls, observed environmental impacts, and previous non-radiological environmental monitoring reports. Provide detailed data analysis and a proposed course of action if harmful effects or evidence of trends towards irreversible damage to the environment are identified.
- Describe any changes to the Fermi 2 design, operation, testing or experimentation that were implemented without adequate review that adversely impacted, or could have adversely impacted, the environment, in accordance with Section 3.1 of the EPP.
- Describe any non-compliance with the EPP and the corrective actions taken to correct the non-compliances.
- Describe any non-routine reports submitted to the NRC as the result of an unusual or important environmental event, in accordance with Section 5.4.2 of the EPP.
Enclosure to NRC-24-0018 Page 5 of 10
2023 Annual Non-Radiological Environmental Operating Report DTE Electric Company - Fermi 2 Page 5 2.4 Site Description DTE Electric Company operates Fermi 2, which is a 3,486 megawatt (gross) thermal General Electric Boiling Water Reactor 4 Nuclear Power Plant. The Fermi 2 power block is situated in the northeast quarter of a 1,260-acre site that is located approximately 6 miles east-northeast of Monroe, Michigan and 30 miles southwest of Detroit, Michigan. The site is fenced with locked gates or gates that are guarded at the discretion of Fermi 2 Security.
The Enrico Fermi 1 Power Plant (Fermi 1) is on the site as well. Fermi 1 was an experimental fast breeder reactor that is presently in a SAFSTOR condition. Subsequent to shut down in 1972, an oil-fired boiler was constructed. Operation of this boiler ceased in 1980 and it was removed from site in 1999.
Contiguous to the site are four oil-fired combustion turbine generators (CTGs), which are periodically operated during periods of high electricity demand as well as during required testing.
The site is bounded on the north by Swan Creek, on the east by Lake Erie, on the south by Pointe Aux Peaux Road, and on the west by a private road owned by DTE Energy. The northern and southern areas of the site are dominated by large lagoons. The western side of the site is predominately covered by several wood lots and a series of small quarry lakes.
Site elevation ranges from approximately 25 feet above lake level on the western edge of the site to lake level on the eastern edge.
Per a Cooperative Agreement between DTE Electric Company and the U.S. Fish and Wildlife Service (FWS), the Lagoona Beach Unit of the Detroit River International Wildlife Refuge has been located on site since September 2003.
3.0 TERRESTRIAL MONITORING Overview Section 4.2.1 of the Fermi 2 EPP required that a special surveillance program be conducted to evaluate changes to vegetative communities within a 1-kilometer radius of the cooling towers. This program involved analysis of low altitude over flights prior to harvest utilizing color infrared photography, backed up by field reconnaissance inspections to verify areas of vegetative stress and non-stress along with soil sampling and analysis. The first flights and report were required after one year of plant operation and then every alternate year for 3 successive periods.
It should be noted that the above-described studies were not conducted to assess radiological impacts to the terrestrial environment, because discharge from the cooling towers is not radiologically active.
Enclosure to NRC-24-0018 Page 6 of 10
2023 Annual Non-Radiological Environmental Operating Report DTE Electric Company - Fermi 2 Page 6 Activities and Controls The final required aerial photographic events were performed in 1994 and a final terrestrial monitoring report summarizing all collected data was completed in April 1995.
The report concluded the following:
- No long-term accumulation of dissolved solid deposition was detected in any of the soil samples collected within the survey area.
- No vegetative stress associated with cooling tower emission was observed in any of the survey reports.
- No correlation was observed between the distribution of stressed vegetation areas and the calculated deposition of dissolved solids and other materials contained within the vaporous cooling tower discharge.
- The absence of observed impacts attributable to the cooling towers is consistent with findings in the scientific literature.
Terrestrial monitoring was conducted in 2008 to support the licensing of a new unit at the site and is detailed in the Combined Operating License Application (COLA) for Fermi 3 which was submitted to the NRC on September 18, 2008. No terrestrial monitoring activities were conducted, or required, under the Fermi 2 Operating License in 2023. Based on the findings and conclusions presented in the 1995 report, no further aerial photographic evaluations are planned.
4.0 HERBICIDE MONITORING Overview Section 4.2.2 of the Fermi 2 EPP requires that herbicide use meet the following conditions:
- 1. Herbicides used must be registered by the United States Environmental Protection Agency (EPA) and utilized in accordance with EPA approved use instructions.
- 2. Herbicides used must be approved by State authorities and applied in accordance with state instructions.
Records of herbicide use within the corridor rights-of-way must be maintained for a period of 5 years and contain the following information: commercial and chemical names of herbicide used; concentration of active material in formulations diluted for field use; diluting substances other than water; rates of application; total pounds used; method and frequency of application; location; and date of application.
Enclosure to NRC-24-0018 Page 7 of 10
2023 Annual Non-Radiological Environmental Operating Report DTE Electric Company - Fermi 2 Page 7 Activities and Controls The herbicide application program, detailed in a conduct manual, is designed to maintain records for herbicide application on-site but does not impose requirements on the application of herbicides within the transmission corridor rights-of-way outside of the Owner Controlled Area. The transmission infrastructure is currently owned and operated by ITC Transmission.
Records pertaining to the application of herbicides within the rights-of-way are obtained annually from ITC Transmission. These records include extensive mapping of the Wayne-Monroe and Brownstown-Fermi transmission corridors showing location and method for herbicide application. Data regarding commercial and chemical names of herbicide used, concentration of active material in formulations diluted for field use, diluting substances other than water, rates of application, method and frequency of application, location and surface area treated, and location and date of application are provided. The total pounds used of each herbicide are then calculated based upon the information provided.
Six herbicides were approved and utilized within the Wayne-Monroe transmission corridor and Brownstown-Fermi transmission corridor rights-of-way in 2023. All herbicides within the rights-of-way were applied within the parameters of the site and ITC procedures, and the applications complied with State and Federal requirements.
5.0 AQUATIC MONITORING Overview According to Section 2.1 of the EPP, the NRC will rely on the Michigan Department of Environment, Great Lakes and Energy (EGLE) for the protection of the aquatic environment from non-radiological operational impacts via the National Pollution Discharge Elimination System (NPDES) Permit. NPDES permits are issued in accordance with provisions of the Federal Water Pollution Control Act, as amended, (33 U.S.C. 1251 et seq.), Michigan Act 451, P.A. of 1994, as amended, Part 31, and Michigan Executive Orders 1991-31, 1995-4 and 1995-18.
Activities and Controls Fermi 2 Chemistry Department closely monitors effluent characteristics per the NPDES requirements. Effluent discharge data are summarized in monthly Discharge Monitoring Reports, which are then submitted to the Michigan Department of Environment, Great Lakes and Energy (EGLE).
NPDES Permit Changes Fermi 2 has been operating under permit number MI00378028 that was renewed on September 27, 2018 and became effective on November 1, 2018. As required by Section 3.2 of the EPP, the NRC was notified of this renewal within 30 days following the date of the renewal (See NRC-18-0053, National Pollutant Discharge Elimination System Enclosure to NRC-24-0018 Page 8 of 10
2023 Annual Non-Radiological Environmental Operating Report DTE Electric Company - Fermi 2 Page 8 (NPDES) Permit Renewal, dated October 25, 2018). On September 22, 2020, Fermi 2 received approval from Michigan Department of Environment, Great Lakes and Energy (EGLE) to reduce the monitoring frequency of Total Phosphorus and Total Copper from monthly to quarterly at outfall 001A. Starting the fourth quarter of 2020, Fermi 2 began the quarterly sampling for Copper and Phosphorus. On April 4, 2022, Fermi 2 submitted an application for reissuance of permit number MI00378028 (See NRC-22-0019, Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance). Final approval is pending.
NPDES Non-compliances in 2023 There was 1 incident of NPDES non-compliance in 2023, which included 5 findings.
An EGLE inspector was on site November 27, 2023 to perform a routine site inspection of site NPDES compliance. 5 findings were identified during this inspection that resulted in a notice of violation.
Finding #1 - Boom at Outfall 009/011A was found to be discolored and not continuous, providing a condition that would allow pollutants to escape beyond the boom.
Finding #2 - Outfall 002 boom/turbidity curtain was not in compliance due to inadequate maintenance.
Finding #3 - The holding time for pH was noted to be within the hour, while the acceptable holding time is within 15 minutes according to 40 CFR 136.
Finding #4 - Copper exceedance from June 2021 report root cause was not communicated to EGLE.
Finding #5 - Discharge Monitoring Reports (DMRs) data discrepancies.
All findings (5) which resulted in the violation have been rectified.
6.0 ENVIRONMENTAL PROTECTION PLAN NON-COMPLIANCES Overview In accordance with Section 5.4.1 of the EPP, all occurrences of non-compliance with the EPP must be reported along with a discussion of actions taken to correct the situation.
Activities and Controls No incidents of EPP noncompliance occurred at Fermi 2 in 2023.
Enclosure to NRC-24-0018 Page 9 of 10
2023 Annual Non-Radiological Environmental Operating Report DTE Electric Company - Fermi 2 Page 9 7.0 DESIGN OR OPERATION CHANGES Overview In accordance with the Fermi 2 EPP, before engaging in additional construction or operational activities, which might affect the environment, Fermi 2 is required to prepare and record an environmental evaluation of such activity. If the evaluation should indicate that the proposed activity involves an un-reviewed environmental question, DTE Electric Company must provide a written evaluation of the activity and obtain prior approval from the Director, Office of Nuclear Reactor Regulation. Activities are excluded from this requirement if all measurable, non-radiological effects are confined to the on-site areas previously disturbed during site preparation and plant construction.
Activities and Controls During the period covered by this report, there were no changes to station design or operational activities that created an un-reviewed environmental question per the requirements of the EPP.
8.0 UNUSUAL OR IMPORTANT ENVIRONMENTAL EVENTS Overview According to Section 4.1 of the EPP, any unusual occurrence or important event which indicates, or could result in, significant environmental impact causally related to plant operation must be reported to the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, followed by a written report within 30 days.
The following are considered examples of unusual or important environmental events:
- On-site plant or animal disease outbreaks
- Increase in nuisance organisms or conditions Activities and Controls No unusual or important environmental events occurred during 2023. Accordingly, no non-routine reports were submitted.
9.0 CONCLUSION
S In 2023, DTE Electric Company - Fermi 2 successfully maintained compliance with the EPP.