NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | 28 September 2023 | Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | Safe Shutdown Ultimate heat sink Tornado Missile Enforcement Discretion Probabilistic Risk Assessment FLEX Earthquake Offsite Circuit |
NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 | 16 August 2023 | NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 | Surveillance Frequency Control Program |
ML23227A221 | 15 August 2023 | Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 | Surveillance Frequency Control Program |
NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 10 August 2023 | Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | Safe Shutdown Ultimate heat sink Mission time Fire Barrier Tornado Missile Internal Flooding Enforcement Discretion Probabilistic Risk Assessment FLEX B.5.b Large early release frequency Earthquake Hardened vent |
NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance | 13 June 2023 | License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance | Safe Shutdown Unanalyzed Condition High winds Mission time Internal Flooding Probabilistic Risk Assessment Coatings FLEX Significance Determination Process Seismically rugged Foreign Material Exclusion Large early release frequency Exemption Request Fuel cladding Power change |
NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | 5 May 2023 | License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | Safe Shutdown Surveillance Frequency Control Program |
NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage | 5 May 2023 | License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage | Anticipated operational occurrence Nonconservative Technical Specifications |
NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | 16 December 2022 | License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | Safe Shutdown Time of Discovery Stroke time Surveillance Frequency Control Program Offsite Circuit |
NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 4 August 2022 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level High Radiation Area Stroke time Water Inventory Control Operating Basis Earthquake Squib Qualified Offsite Circuit Surveillance Frequency Control Program Excess Flow Check Valve Control of Heavy Loads Power Operated Valves Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
ML22101A047 | 4 April 2022 | Submittal of Application for the Renewal of National Pollutant Discharge Elimination System (NPDES) Permit | |
NRC-21-0001, License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes | 31 March 2021 | License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes | Time of Discovery Shutdown Margin High Radiation Area Grab sample Offsite Dose Calculation Manual Water Inventory Control Post Accident Monitoring Missed surveillance Surveillance Frequency Control Program Scram Discharge Volume Recently irradiated fuel Offsite Circuit |
NRC-20-0038, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules | 28 October 2020 | Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules | Time of Discovery Missed surveillance |
NRC-20-0040, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle | 23 June 2020 | Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle | Reactor Vessel Water Level Packing leak Half scram Mission time Stroke time Water Inventory Control Post Accident Monitoring Temporary Modification Squib VT-2 Test box Scram Discharge Volume Recently irradiated fuel |
NRC-20-0032, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 5 June 2020 | Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Surveillance Frequency Control Program |
NRC-19-0075, License Amendment Request - Proposed Revision to Technical Specifications for Secondary Containment Surveillance Requirements | 6 December 2019 | License Amendment Request - Proposed Revision to Technical Specifications for Secondary Containment Surveillance Requirements | Surveillance Frequency Control Program Recently irradiated fuel |
NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle | 8 November 2019 | DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Squib Surveillance Frequency Control Program Scram Discharge Volume Maintenance Rule Program Fuel cladding Offsite Circuit |
NRC-19-0028, License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03 | 5 September 2019 | License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03 | |
NRC-19-0001, License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation | 27 February 2019 | License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation | Reactor Vessel Water Level Anticipated operational occurrence Water Inventory Control Surveillance Frequency Control Program Fuel cladding |
NRC-19-0002, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR | 8 February 2019 | Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR | Reactor Vessel Water Level Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding |
NRC-17-0063, License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities. | 9 October 2017 | License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities. | Water Inventory Control Hydrostatic Incorporated by reference |
NRC-17-0067, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 31 August 2017 | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Water Inventory Control Post Accident Monitoring Hydrostatic Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Scram Discharge Volume Power Operated Valves Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
ML17237A176 | 24 August 2017 | License Amendment Request to Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Reactor Trip and Primary Containment Isolation System Group 1 Isolation Functions | Reactor Vessel Water Level Half scram Ultimate heat sink Surveillance Frequency Control Program Scram Discharge Volume Deep Dose Equivalent Fuel cladding Recently irradiated fuel |
NRC-17-0056, Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3 | 15 August 2017 | Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3 | |
NRC-17-0044, License Amendment Request to Revise Technical Specification 5.5.7, Ventilation Filter Testing Program, to Be Consistent with Standard Technical Specifications | 14 August 2017 | License Amendment Request to Revise Technical Specification 5.5.7, Ventilation Filter Testing Program, to Be Consistent with Standard Technical Specifications | |
NRC-17-0025, License Amendment Request to Revise Technical Specification Section 3.7.2 for Emergency Equipment Cooling Water / Emergency Equipment Service Water System and Ultimate Heat Sink | 17 July 2017 | License Amendment Request to Revise Technical Specification Section 3.7.2 for Emergency Equipment Cooling Water / Emergency Equipment Service Water System and Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Surveillance Frequency Control Program Earthquake |
NRC-17-0010, License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation | 23 February 2017 | License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation | Reactor Vessel Water Level Anticipated operational occurrence Large early release frequency Fuel cladding |
NRC-16-0036, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Pro | 25 July 2016 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Proces | High Radiation Area Stroke time Squib Missed surveillance Surveillance Frequency Control Program |
NRC-16-0006, License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals | 22 March 2016 | License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals | High winds Internal Flooding Probabilistic Risk Assessment Coatings Nondestructive Examination Cyber Security FLEX Aging Management Large early release frequency Moisture barrier |
NRC-15-0081, License Renewal Application Update for the Boraflex Monitoring Program | 24 September 2015 | License Renewal Application Update for the Boraflex Monitoring Program | Non-Destructive Examination Aging Management |
NRC-15-0090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process | 24 September 2015 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process | Reactor Vessel Water Level Stroke time Surveillance Frequency Control Program |
NRC-15-0067, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 35 | 18 June 2015 | Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 35 | High Radiation Area Aging Management |
NRC-15-0062, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 34 | 9 June 2015 | Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 34 | Coatings Aging Management |
NRC-15-0044, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Sets 27, 28, 29 and 31 | 27 April 2015 | Response to NRC Request for Additional Information for the Review of the License Renewal Application - Sets 27, 28, 29 and 31 | Coatings Aging Management |
NRC-15-0030, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 22 | 19 March 2015 | Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 22 | Aging Management |
NRC-15-0028, Revision to Response to License Renewal Environmental RAI SSSH-1 | 18 February 2015 | Revision to Response to License Renewal Environmental RAI SSSH-1 | |
NRC-15-0021, License Renewal Application - Response to LR-ISG-2013-01 | 5 February 2015 | License Renewal Application - Response to LR-ISG-2013-01 | Coatings Temporary Modification Aging Management |
NRC-14-0055, License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan | 21 October 2014 | License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan | |
ML14121A536 | 24 April 2014 | Fermi 2, License Renewal Application, Page 3.3-2 Through Appendix C, Page C-13 | Boric Acid Non-Destructive Examination Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Coatings Fire impairment Anchor Darling Operating Basis Earthquake Nondestructive Examination VT-2 Incorporated by reference Condition Adverse to Quality Aging Management Moisture barrier License Renewal Earthquake Maintenance Rule Program Control of Heavy Loads Hardened vent Biofouling EVT-1 Liquid penetrant Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld Backfit Power Uprate Measurement Uncertainty Recapture |
ML14121A535 | 24 April 2014 | Fermi 2, License Renewal Application, Cover Through Page 3.3-1 | Safe Shutdown Boric Acid Reactor Vessel Water Level Loop seal Ultimate heat sink Grab sample Fire Barrier Anticipated operational occurrence Weld Overlay Coatings Nondestructive Examination Aging Management Abnormal operational transient Tornado Missile Protection Scram Discharge Volume Moisture barrier Earthquake Hardened vent Fuel cladding Fire Protection Program Flow Induced Vibration |
ML14121A538 | 24 April 2014 | Fermi 2, License Renewal Application, Appendix D Through Appendix E, Page 3-169 | Ultimate heat sink Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Met Tower Zebra Mussel Process Control Program License Renewal Earthquake Biofouling Measurement Uncertainty Recapture |
ML14121A539 | 24 April 2014 | Fermi 2, License Renewal Application, Appendix E, Page 3-170 Through Page 9-23 | Coatings Incorporated by reference Annual Radioactive Effluent Release Report Open House License Renewal Subsequent License Renewal Hardened vent Environmental Justice Fatality Power Uprate Measurement Uncertainty Recapture |
NRC-14-0028, License Renewal Application, Appendix E, Page 10-1 Through End | 24 April 2014 | License Renewal Application, Appendix E, Page 10-1 Through End | Safe Shutdown High winds Mission time Grab sample Offsite Dose Calculation Manual Internal Flooding Probabilistic Risk Assessment Squib Zebra Mussel FLEX B.5.b Fukushima Dai-Ichi Annual Radiological Environmental Operating Report Large early release frequency Excess Flow Check Valve Severe Accident Management Guideline License Renewal Earthquake Maintenance Rule Program Hardened vent Environmental Justice Power Uprate Measurement Uncertainty Recapture Seismic Walkdown Report Failure to Scram |
NRC-13-0012, License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process | 17 April 2013 | License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process | Safe Shutdown Incorporated by reference Recently irradiated fuel |
NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate | 7 February 2013 | License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Scram Discharge Volume Flow Induced Vibration |
NRC-13-0001, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process | 11 January 2013 | License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process | Battery sizing Recently irradiated fuel Offsite Circuit |
NRC-13-0002, Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles | 11 January 2013 | Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles | Safe Shutdown Tornado Missile Probabilistic Risk Assessment Tornado Generated Missile Tornado Missile Protection Design basis earthquake TORMIS Earthquake Turbine Missile |
NRC-12-0037, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report | 21 December 2012 | Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report | Unanalyzed Condition Anticipated operational occurrence Post Accident Monitoring Hydrostatic Finite Element Analysis Abnormal operational transient Pressure and Temperature Limits Report |
NRC-12-0087, License Amendment Request to Change Name of Licensee from the Detroit Edison Company to DTE Electric Company | 21 December 2012 | License Amendment Request to Change Name of Licensee from the Detroit Edison Company to DTE Electric Company | |
NRC-12-0083, License Amendment Request to Change Licensee Name on the Operating License | 21 December 2012 | License Amendment Request to Change Licensee Name on the Operating License | Safe Shutdown Fire Protection Program |
NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report | 21 December 2012 | Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report | Unanalyzed Condition Anticipated operational occurrence Post Accident Monitoring Hydrostatic Abnormal operational transient Pressure and Temperature Limits Report |