ML20212B996

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Page 3.3-52,deleting Condition G as Well as or G from Condition H,Per TS Change Request TSCR-003
ML20212B996
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/15/1999
From:
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Shared Package
ML20212B982 List:
References
NUDOCS 9909210083
Download: ML20212B996 (1)


Text

.

Primary Containment Isolation Instrumentation o

3.3.6.1 ACITONS.(continued)

CONDITION REQUIRED ACTION COMPLETION TIME 1

F.

As required by F.1 Isolate the affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Recuired Action C.1 penetration flow anc referenced in path (s).

Table 3.3.6.1-1.

G.

As required G.1 Isolate the af eV e

Recuired Action C.1 N

ow LETE anc referenced in

/a H.

As required by H.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Recuired Action C.1 anc referenced in MD Table 3.3.6.1-1.

H.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> QB Required Action and associated Completion Time for Condition F ee-G-not met.

I.

As required by I.1 Declare Standby 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Action C.1 Liquid Control (SLC) and referenced in System inoperable.

Table 3.3.6.1-1.

I.2 Isolate the Reactor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Water Cleanup System.

(continued) 9909210083 990915 DR ADOCK 0 3 1-DAEC 3.3-52 f.; MTent 220