ML20212B996
| ML20212B996 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 09/15/1999 |
| From: | IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| To: | |
| Shared Package | |
| ML20212B982 | List: |
| References | |
| NUDOCS 9909210083 | |
| Download: ML20212B996 (1) | |
Text
.
Primary Containment Isolation Instrumentation o
3.3.6.1 ACITONS.(continued)
CONDITION REQUIRED ACTION COMPLETION TIME 1
F.
As required by F.1 Isolate the affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Recuired Action C.1 penetration flow anc referenced in path (s).
Table 3.3.6.1-1.
G.
As required G.1 Isolate the af eV e
Recuired Action C.1 N
ow LETE anc referenced in
/a H.
As required by H.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Recuired Action C.1 anc referenced in MD Table 3.3.6.1-1.
H.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> QB Required Action and associated Completion Time for Condition F ee-G-not met.
I.
As required by I.1 Declare Standby 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Action C.1 Liquid Control (SLC) and referenced in System inoperable.
Table 3.3.6.1-1.
I.2 Isolate the Reactor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Water Cleanup System.
(continued) 9909210083 990915 DR ADOCK 0 3 1-DAEC 3.3-52 f.; MTent 220