License Amendment Request to Modify the Implementation Date of License Amendment No. 239
ML24337A123
Person / Time
Site: Wolf Creek 
Issue date: 12/02/2024
From: Boyce M
Wolf Creek
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
000703, EPID L-2024-NFN-0006
Download: ML24337A123 (1)


Text

P.O. Box 411 l Burlington, KS 66839 l 620-364-8831 Michael T. Boyce Vice President Engineering December 2, 2024 000703 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

1) Letter from USNRC, dated February 27, 2024, from S. S. Lee, USNRC, to C. Reasoner, WCNOC, Wolf Creek Generating Station, Unit 1 - Issuance of Amendment No. 239 Re: Modified Implementation Date of License Amendment No. 238 (EPID L-2024-LLA-0007) (ML24026A021)
2) Letter from USNRC, dated June 28, 2024, from S. S. Lee, USNRC, to WCNOC, Teleconference with Wolf Creek Nuclear Operating Corporation Regarding Wolf Creek Generating Station Unit 1, Amendment No. 237, Allowing the Use of Portable Lighting (EPID L-2024-NFN-0006)

(ML24180A125)

Subject:

Docket No. 50-482: License Amendment Request to Modify the Implementation Date of License Amendment No. 239 Commissioners and Staff:

On February 27, 2024, the Nuclear Regulatory Commission (NRC) issued Amendment No. 239 to Wolf Creek Generating station (WCGS), approving a modified implementation period for Amendment No. 237 (Reference 1). The approved Amendment No. 239 granted an additional one-year implementation period, altering the required implementation date for Amendment No.

237 from February 27, 2024, to February 27, 2025. The additional time requested was necessary to provide additional time to Wolf Creek Nuclear Operating Corporation (WCNOC) and the NRC to explore solutions on how to correct discrepancies identified in the safety evaluation (SE) of Amendment No. 237.

On July 23, 2024, a public teleconference was held between the NRC and representatives from WCNOC to discuss the NRCs revisions to the SE of Amendment No. 237 (Reference 2).

Following the teleconference, it was determined that the best success path to address the original scope of Amendment No. 237 and the missing information in the NRC SE would be through a subsequent License Amendment Request (LAR) submitted by WCNOC. The new LAR would address additional information pertinent to the original submittal for Amendment No. 237, and

000703 Page 2 of 3 would provide for a new SE that, when implemented alongside Amendment No. 237, would allow for implementation of the original LAR as intended.

The review period of the subsequent LAR would go beyond the implementation date of Amendment No. 237, which requires WCNOC to request an additional implementation date extension of Amendment No. 237.

Therefore, in accordance with 10 CFR 50.90, WCNOC requests an additional year for implementation of Amendment No. 237. Amendment No. 237 serves as an enhancement to the existing Fire Protection Program. Additionally, Amendment No. 237 enables WCGS to increase efficiency and management of resources while improving the response capabilities to postulated events. The existing Fire Protection Program will continue to be utilized as it is fully compliant with applicable rules and regulations as approved for use at WCGS. Therefore, modifying the implementation date will have no impact on WCGSs ability to protect the health and safety of the public and remain compliant with associated regulations.

WCNOC requests approval of this proposed amendment by February 27, 2025. The time frame is necessary due to the current implementation date of Amendment No. 239, and the need to submit a subsequent LAR to address the issues identified in the NRC SE for Amendment No.

237.

The amendment application was reviewed by the WCNOC Plant Safety Review Committee. The proposed amendment contained in this submittal does not involve a significant hazards consideration set forth in 10 CFR 50.92(c). In accordance with 10 CFR 50.91, a copy of this letter will be provided to the designated Kansas State official.

This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-8831 x8687, or Dustin Hamman at (620) 364-4204.

Sincerely, Michael T. Boyce MTB/jkt Attachments: Evaluation of Proposed Change cc:

A. N. Agrawal (NRC), w/a S. S. Lee (NRC), w/a J. D. Monninger, (NRC), w/a Jason Meinholdt, (KDHE), w/a Senior Resident Inspector (NRC), w/a WCNOC Licensing Correspondence ET 24-000703, w/a

Attachment I to 000703 Page 1 of 7 EVALUATION OF PROPOSED CHANGE

Subject:

License Amendment Request to Modify the Implementation Date of License Amendment No. 239 1.0

SUMMARY

DESCRIPTION 2.0 DETAILED DESCRIPTION

2.1 Background

2.2 Current Requirement 2.3 Reason for the Proposed Change 2.4 Description of the Proposed Change

3.0 TECHNICAL EVALUATION

4.0 REGULATORY EVALUATION

4.1 Applicable Regulatory Requirements/Criteria 4.2 No Significant Hazards Consideration 4.3 Conclusions

5.0 ENVIRONMENTAL CONSIDERATION

6.0 REFERENCES

Attachment I to 000703 Page 2 of 7 1.0

SUMMARY

DESCRIPTION The NRC approved License Amendment Number (No.) 237 to Renewed Facility Operating License No. NPF-42 for Wolf Creek Generating Station (WCGS), Unit 1, on August 31, 2023 via Reference 6.1. The amendment approved modifications to License Condition 2.C(5) and approved changes to USAR Appendix 9.5E, 10 CFR Part 50 Appendix R Comparison, to allow the use of portable lighting as the primary emergency lighting means (with limited exceptions) for illuminating safe shutdown equipment and access egress routes to the equipment. On October 19, 2023, Wolf Creek Nuclear Operating Corporation (WCNOC) requested the safety evaluation (SE) associated with Amendment No. 237 be corrected as there were inconsistencies present in the SE that did not align with the original license amendment request (LAR) scope as submitted in Reference 6.2. WCNOC requested additional time to implement Amendment No. 237 via Reference 6.3, as supplemented by Reference 6.4, to allow more time for WCNOC and the NRC to identify how the issues in the SE would be corrected. That LAR was approved via the issuance of Amendment No. 238 to WCGS (Reference 6.5).

An additional implementation date extension was requested and approved via the issuance of Amendment No. 239 (Reference 6.6). During the implementation period of Amendment No. 239, a public teleconference was held between the NRC and representatives from WCNOC to discuss the NRCs revisions to the SE of Amendment No. 237 (Reference 6.7). Following the teleconference, it was determined that the best success path to address the original scope of Amendment No. 237 and the missing information in the NRC SE would be through a subsequent LAR submitted by WCNOC. This LAR would present information necessary for NRC review and provide an additional SE that, when implemented alongside Amendment No. 237, would allow for implementation of Amendment No. 237 as intended. The review period of the subsequent LAR would go beyond the implementation date of Amendment No. 237, which requires WCNOC to request an additional implementation date extension for Amendment No. 237.

Therefore, to allow sufficient time for the NRC to review the subsequent LAR, and to allow WCNOC additional time to implement Amendment No. 237 following approval of the subsequent LAR, WCNOC is requesting an additional extension of the implementation time of Amendment No. 237. The additional implementation time requested for Amendment No. 237 is one year. The proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c).

2.0 DETAILED DESCRIPTION

2.1 Background

WCNOC had planned to implement Amendment No. 237, in accordance with the NRC approved timeline, as approved by Amendment No. 239. However, following the public teleconference held between the NRC and WCNOC representatives, it was determined that a subsequent LAR would be necessary to present additional information for NRC review and provide an additional SE that,

Attachment I to 000703 Page 3 of 7 when implemented alongside Amendment No. 237, would allow for implementation of Amendment No. 237 as intended. Therefore, WCNOC needs additional time to implement Amendment No. 237 while the subsequent LAR is submitted by WCNOC and approved by the NRC. Following approval, both of the amendments will be implemented within the new implementation period of Amendment No. 237, assuming approval by the NRC.

2.2 Current Requirement License Amendment No. 237, with the additional one-year implementation period approved by Amendment No. 239, requires implementation by February 27, 2025.

2.3 Reason for the Proposed Change The inconsistencies in the SE for License Amendment No. 237 when compared to the associated LAR provides the basis for why WCNOC requests an additional year for implementation. Although the SE is not a part of the licensing basis, it is relied upon by the NRC when confirming compliance with changes approved by the NRC, as well as confirming compliance with applicable regulations.

The effect of an SE that is not consistent with a LAR is that it can establish new interpretations of the facility licensing basis. The NRC-issued SE introduces Staff conclusions that arguably support an unrequested change to the facility licensing basis. Additionally, the issued SE did not discuss the use of portable lighting as a primary emergency lighting means, which is the core of the LAR.

Instead, it discussed the use of portable lighting in specific fire areas affected by a fire event.

The request for an additional one-year as approved via issuance of Amendment No. 239 was necessary for WCNOC and the NRC to determine which path was necessary for correction of the SE inconsistencies. Following a public teleconference, it was determined that a subsequent LAR would be necessary to present additional information for NRC review leading to an additional SE that, when implemented alongside Amendment No. 237, would allow for implementation of Amendment No. 237 as intended.

Therefore, implementing the approved License Amendment No. 237 as is creates the potential for improper interpretation of the WCGS licensing basis. The information that is present in the SE is not consistent with the information originally provided in Reference 6.8, as supplemented, and as evaluated.

2.4 Description of the Proposed Change Based on the information provided in Section 2.3, WCNOC requests an additional year for implementation. The additional time is necessary for WCNOC to remain in compliance while an additional LAR is submitted by WCNOC and approved by the NRC. The additional year of implementation time would place the new implementation date at February 27, 2026.

Attachment I to 000703 Page 4 of 7

3.0 TECHNICAL EVALUATION

WCNOC cannot implement the approved License Amendment No. 237 due to the inconsistencies identified in the SE. Even though License Condition 2.C(5) and the USAR changes were approved as requested, the lack of a consistent and accurate SE to support the changes originally proposed in Reference 6.8 prevents WCNOC from implementing associated changes until it is sure that WCNOC and the NRC have a consistent understanding of what License Amendment No. 237 approves and on what basis. Details on the inconsistencies and recommended markups to address them were provided in a separate correspondence to the NRC in Reference 6.2.

In the interim, WCNOC will continue to utilize the existing Fire Protection Program until an additional LAR is reviewed and approved by the NRC. The current program is fully compliant with applicable rules and regulations as approved for use by the NRC. Until then, WCNOC will not take any action for implementation of License Amendment No. 237.

4.0 REGULATORY EVALUATION

4.1 Applicable Regulatory Requirements/Criteria The request for an additional year for implementation does not affect the requirements of the current Fire Protection Program as reviewed and approved by the NRC. Placing the implementation period on hold until resolution of the issues identified in the SE will not challenge regulatory compliance. The current Fire Protection Program will continue to satisfy the following regulations:

10 CFR 50, Section 48, Fire protection, which states in paragraph (a) that Each holder of an operating license issued under this part or a combined license issued under part 52 of this chapter must have a fire protection plan that satisfies Criterion 3 of appendix A to this part. Paragraph (b) states, Appendix R to this part establishes fire protection features required to satisfy Criterion 3 of appendix A to this part with respect to certain generic issues for nuclear power plants licensed to operate before January 1, 1979.

10 CFR 50, Appendix A, Criterion 3-Fire protection. Structures, systems, and components important to safety shall be designed and located to minimize, consistent with other safety requirements, the probability and effect of fires and explosions. Noncombustible and heat resistant materials shall be used wherever practical throughout the unit, particularly in locations such as the containment and control room. Fire detection and fighting systems of appropriate capacity and capability shall be provided and designed to minimize the adverse effects of fires on structures, systems, and components important to safety. Firefighting systems shall be designed to assure that their rupture or inadvertent operation does not significantly impair the safety capability of these structures, systems, and components.

Attachment I to 000703 Page 5 of 7 10 CFR 50, Appendix R, Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979,Section III.J, Emergency lighting. Emergency lighting units with at least an 8-hour battery power supply shall be provided in all areas needed for operation of safe shutdown equipment and in access and egress routes thereto.

Since WCGS was licensed after January 1, 1979, WCGS is not obligated to meet the requirements of Section III.J. However, USAR Appendix 9.5E provides a comparison of the WCGS design to Appendix R.

4.2 No Significant Hazards Consideration

1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No The proposed modification to provide an additional year for implementation for License Amendment Number 237 does not involve a significant increase in the probability or consequences of an accident previously evaluated. The existing Fire Protection Program will remain in effect during the modified implementation period.

The current Fire Protection program and associated post-fire operator manual actions for a fire outside the control room will continue to remain feasible and reliable, demonstrating that the plant can be safely shutdown in the event of a fire. The use of the existing Fire Protection Program will not adversely affect the performance of operator manual actions in support of applicable procedures.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No The proposed modification to provide an additional year for implementation for License Amendment Number 237 does not create the possibility of a new or different kind of accident from any accident previously evaluated. The existing Fire Protection Program will remain in effect during the modified implementation period. Considering the current Fire Protection remains in place, no physical alteration of the plant will occur and this does not result in the installation of any new or different kind of equipment.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

Attachment I to 000703 Page 6 of 7

3. Does the proposed amendment involve a significant reduction in a margin of safety?

Response: No The proposed modification to provide an additional year for implementation for License Amendment Number 237 is not a reduction in a margin of safety. The existing Fire Protection Program will remain in effect during the modified implementation period and has an acceptable margin of safety and has been approved by the NRC.

Therefore, the proposed change does not involve a significant reduction in a margin of safety.

4.3 Conclusions In conclusion, based on the considerations above, (i) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (ii) such activities will be conducted in compliance with the Commissions regulations, and (iii) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

5.0 ENVIRONMENTAL CONSIDERATION

The proposed change would alter a requirement with respect to the implementation date for License Amendment Number 237 for Wolf Creek Generating Station, Unit 1. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or a significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.

Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in paragraph (c)(9) of 10 CFR 51.22, Criterion of categorical exclusion, identification of licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring an environmental review. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.

6.0 REFERENCES

6.1 Letter from USNRC, dated August 31, 2023, from S. S. Lee, USNRC, to C. Reasoner, WCNOC, Wolf Creek Generating Station, Unit 1 - Issuance of Amendment No. 237 Re:

Request for Deviation from Fire Protection Program Requirements (EPID: L-2022-LLA-0107) (ML23165A250) 6.2 Letter 000163 / ET 23-000163, dated October 19, 2023, from M. T. Boyce, WCNOC, to USNRC, Wolf Creek Nuclear Operating Corporation Request for Correction in Response to License Amendment No. 237 and Corresponding Safety Evaluation (ML23292A357)

Attachment I to 000703 Page 7 of 7 6.3 Letter 000169 / ET 23-000169, dated October 19, 2023, from M. T. Boyce, WCNOC, to USNRC, License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 (ML23292A359) 6.4 Letter 000225 / ET 23-000225, dated November 27, 2023, from M. T. Boyce, WCNOC, to USNRC, Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 (ML23331A497) 6.5 Letter from USNRC, dated November 29, 2023, from S. S. Lee, USNRC, to C. Reasoner, WCNOC, Wolf Creek Generating Station, Unit 1 - Issuance of Amendment No. 238 Re:

Modified Implementation Date of License Amendment No. 237 (EPID: L-2023-LLA-0144)

(ML23299A266) 6.6 Letter from USNRC, dated February 27, 2024, from S. S. Lee, USNRC, to C. Reasoner, WCNOC, Wolf Creek Generating Station, Unit 1 - Issuance of Amendment No. 239 Re:

Modified Implementation Date of License Amendment No. 238 (EPID L-2024-LLA-0007)

(ML24026A021) 6.7 Letter from USNRC, dated June 28, 2024, from S. S. Lee, USNRC, to WCNOC, Teleconference with Wolf Creek Nuclear Operating Corporation Regarding Wolf Creek Generating Station Unit 1, Amendment No. 237, Allowing the Use of Portable Lighting (EPID L-2024-NFN-0006) (ML24180A125) 6.8 Letter ET 22-0010, dated August 2, 2022, from M. T. Boyce, WCNOC, to USNRC, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements (ML22215A000)