ML20248H856

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to Second 10-yr Interval Inservice Testing Program for ASME Code Class 1,2 & 3 Pumps & Valves (FNP-1-M-042),for Review & Granting of Relief
ML20248H856
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/04/1989
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20248H858 List:
References
NUDOCS 8910120117
Download: ML20248H856 (5)


Text

{{#Wiki_filter:. _ _ _ _ _ _ _ _ _ . - . _ _ _ _ _ _ A- .c:@ Alabama Power Compeny 40 inverness Center Parttway Post Othce Box 1295 j Birmingham, Alabama 35201: Telephone 205 868-5581 L l W. G. Hairston. til

Senior Vice President Nuclear Operations AlabamaPower the southem electnc system 10CFR50.55a(g).

1 October 4, 1989 Docket No. 50-348 U. S.' Nuclear Regulatory Commission Attention: . Document Control Desk

  • Vashington, D. C. 20555 Gentlemen:
                                                                                                                                                                --{

Joseph M. Farley Nuclear Plant - Unit 1 Second Ten-Year Interval Inservice Testing Program for ASME Code Class 1, 2 and 3 Pumps and Valves-Enclosed for review and granting of relief is Revision 3 of the Unit 1 Inservice Testing (IST) Program. As discussed with the NRC Staff, this submittal vill make the Unit 1 IST Program essentially identical to the latest Unit 2 IST Program revision. Alabama Power Company previously submitted Revision 0 of the subject Unit 1 IST Program to the NRC by letters dated September 30 and November 20, 1987. Revision 1 to this program was submitted by letter dated March 17, 1988. Revision 2 followed by letter dated September 9, 1988. The NRC granted interim approval for the relief requests submitted with Revisions 0 and 1 of the IST Program by letters dated December 10, 1987 and March 30, 1988, respectively. To date Alabama Power Company has not received approval for the relief requests submitted with Revision 2 of the IST Program. Revision 3 incorporates changes docketed in Revision 1 of the Unit 2 IST Program which was submitted to the NRC by letter dated July 20, 1989. Revision 1 of the Unit 2 IST Program addressed relief requests referenced by Enclosure 1 of the NRC letter dated March 31, 1989 entitled "IST Program Inconsistencies Identified During the Review." This Enclosure identified six (6) items that required revision or provision of additional technical justification. It is respectfully requested that the relief requests included in Revision 3 of the Unit 1 IST Program be granted by April 2,1990. The enclosure includes a summary of changes to facilitate review. After the NRC grants these relief requests, Alabama Power Company will implement Revision 3 of the IST Program. QOlggy[ $hO s P I

U. S. Nuclear Regulatory Commission Page 2 If there are any questions or if additional information is needed, please advise. Respectfully submitted, ALABAMA POWER COMPANY W Y-^ EL.) W. G. Hairston, III VGH,III/DEM/TRH:cht-8,5 Enclosure cc: Mr. S. D. Ebneter v/1 I Mr. E. A. Reeves v/1 Mr. G. F. Maxwell v/0 1 t l l 1 l 1

o. J x. ENCLOSURE .! l UNIT l' INSERVICE TESTING PROGRAM FOR PUMPS AND VALVES j l Summary of Changes for Revision 3 Page Number Description-

              -I-l'                                       'Added reference to NRC. letters granting interim relief.

I-4 . Deleted' valve general relief request VG-2. Revised valve general relief request VG-3 to request relief from Section XI, IVV-3427(b). I-5 Revised valve general relief VG-3 alternate-testing requirements to correct references to IVV-3421, 3425 and to reference Section XI, IVV-3427(a) only. II-1 Revised valve coordinate from C-7 to G-7-and added' reference to relief request PR-18. II-1-2 to 11-1-8 ' Revised to add reference to relief request'PR-18. Ij II-1-22 and 23 Revised pump relief request.PR-11 to provide further technical justification for the requested relief. II-1-24 Revised pump relief request PR-12 to clarify that the l . top motor housing contains the motor thrust bearing. II-1-25 Revised pump relief request PR-13 to reference the pump flow test requirements defined in PR-11. 11-1-26 Revised page number. II-1-27 Revised pump relief request PR-15 Alternate Testing requirements to apply the ranges of Section XI, Table IWP-3100-2. II-1-28 and 29 Revised page numbers. II-1-30 Revised model number of IRD Vibration Monitor. III-5 Revised P and ID No. and Boundary Diagram No. for Liquid Vaste Disposal (01G21). III-6 Revised to reference OSR43 for D.G. Air Start System. III-1-2-9 Revised valve relief request 01E11-RV-3 to reference 01E11-RV-5 for test grouping. III-1-2-10 Revised valve relief request 01E11-RV-4 to further define valve disassembly during manual full stroke testing. _ _ = _ _ - _ - _ _ _ .

7____.

          ~

l 4 Summary Page 2 III-1-2-11 Revised valve relief request 01E11-RV-5 to further define valve disassembly during manual full stroke testing. III-1-2-13 Revised valve relief request 01E11-RV-7 to reference 01E11-RV-4 for test grouping. III-1-3-2 Revised to add IST Program Manual number. III-1-4-2 Revised to change DVG No. of valve OV045A. III-1-4-6 Revised valve relief request 01E13-RV-3 to further define valve disassembly during manual full stroke testing. l III-1-7-3 Revised exercise test requirements for valves 1-8997A, B, and C and valves 1-8995A, B and C, to require manual stroke test. III-1-7-4 Revised exercise test requirements for valves 1-8993A, B and C and 1-8990A, B and C to require manual stroke

test.

l III-1-7-5 and 6 Revised exercise test requirements for valves 1-8992A, B and C and 1-0480A, B and C to require manual stroke test. 1 III-1-7-17 Revised valve relief request 01E21-RV-2 to further define valve disassembly during manual full stroke testing and to revise valve disassembly groupings so i that each valve group includes no more than three j valves. l III-1-7-19 and 20 Revised valve relief request 01E21-RV-4 to further define valve disassembly during manual full stroke testing. III-1-7-21 Revised page number. 111-1-7-22 Revised valve relief request 01E21-RV-6 to reference 01E21-RV-10 for test grouping. III-1-7-23 to 25 Revised page numbers. III-1-7-26 Revised valve relief request 01E21-RV-10 to further define valve disassembly during manual full stroke testing and to revise valve disassembly groupings so that each valve group includes no more than three valves. III-1-7-27 Revised valve relief request 01E21-RV-11 to reference 01E21-RV-14 for test grouping.

                -6.

M ' l, LSummarya F- Page 3

                          -III-1-7-28                             Revised valve relief request 01E21-RV-12 to add a note l

concerning the NRC's interpretation that this relief request.is not necessary.

                          -III-1-7-29                             Revised valve relief request 01E21-RV-13'to further l                                                                   define valve disassembly during manual full stroke l                                                                   testing.

l .III-1-7-30 Revised valve relief request 01E21-RV-14 to further l< define valve disassembly during manual full stroke testing. III-1-16-7. Revised valve relief request 01N23-RV-1 to further define valve disassembly during manual full stroke testing. III-1-20-1 and 2. ' Revised to change DVG No. of valves HV3104, HV3180A, HV3181A, and B,..HV3328, HV3329 and HV3330. III-1-21-11 Revised valve relief request 01P16-RV-4 to'further-define valve disassembly during manual full stroke testing. III-1-21-12 Revised valve relief request 01P16-RV-3 to further define valve disassembly during manual full stroke testing. III-1-26-1 Revised to reference OSR43 for D.G. Air Start System. III-1-26-4 Revised to correct valve relief request number. i

                           /cht:1.1.53                                                                                             ,

j

                                                                                                                                    )

1}}