MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20211G1341999-08-24024 August 1999 Proposed Tech Specs Replacement Pages,Incorporating Addl Info for Pending TS Change ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20195C8591999-06-0303 June 1999 Proposed Tech Specs Incorporating Changes Which Reflect Limitations & Requirements Appropriate to Present Configuration of Plant ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199K4861999-01-18018 January 1999 Proposed Tech Specs to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TSs to TRM ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20154A7401998-09-24024 September 1998 Spent Fuel Pool Cooling & Makeup Monitoring Program ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20249B7841998-06-12012 June 1998 Rev 1 to CY-HP-0025,HNP Health Physics Dept Technical Support Document, Background Cs-137 Concentration in Soil ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247Q6491998-05-0707 May 1998 Revised Nuclear Emergency Planning Operating Procedure Index ML20217Q9101998-04-30030 April 1998 Matl Recovery Plan ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept 1999-07-31
[Table view] |
Text
--
Stiphcr E. ace * -
3-31-87 87-12 Form Apprev;d by Station Sup;rintend5nt Effcctive Davo 50RC Mtg. No.
I STATION PROCEDURE COVER SHEET
/~'s A. IDENTI'FICATION
( )
Number: E0P 35 FR-Z.1 Rev. 2
Title:
RESPONSE TO HIGH CONTAINMENT PRESSURE Prepared By: J. A. Ruttar B. REVIEW I have reviewed the above procedure and have found it to be satisfactory.
TITLE SIGNATURE DATE DEPARTMENT HEAD 6///rF
< 3 C. SPECIFIC UNREVIEWED SAFETY QUESTION EVALUATION REQUIRED: -
Modifies intent of procedure and changes operation
- of systems as described in design documents. YES [ ] NO [g (If yes, perform written USQ determination and Safety Evaluation, and contact Manager, Safety Analysis Branch to determine need for Integrated Safety Evaluation.)
ENVIRONMENTAL REVIEW REQUIRED U (Adverse environmental impact) YES [ ] NO [4 D. SPECIFIC SAFETY EVALUATION REQUIRED Affects response of safety systems, performance of systems which may have been credited in the safety analysis or non-credited systems which may indirectly affect safety system response. YES [ ] NO[I (If yes, perform written Safety Evaluation and contact Manager, Safety Analysis Branch to determine need for Integrated Safety Evaluation.)
E. INTEGRATED SAFETY EVALUATION REQUIRED YES [ ] NO ((
F. PROCEDURE REQUIRE b SORC REVIEW (In addition to revTew, items with a YES response must be documented in the @ SORC meeting minutes.) YES (( NO [ ]
G. SORC APPROVAL SORC Heeting Number 3 -8 7-N T H. APPROVAL AND IMPLEMENTATION reby approved, and effective on the date below:
The att fached
., e 5tal.1on/ Service / Unit Superintendent n ,e Effective Date SF 301 Rev. 9 Page 1 of 1 0010260577 001007 PDR ADOCK 05000213 P PDR
P ll
.\
E0P 35 FR-Z.1 ~Page 1 ;
.- Rev. 2 ;
4 J
RESPONSE TO HIGH CONTAINMENT PRESSURE i t
a i i i Page No. Eff. Rev. ,
1
]
1-8 2 l 1
1 4
' i a l t 1 i
i
[
. i I
i l
l I J
t a
l l.
i t i
I I l i t
i j-l 1
(
l i
I i
t l
l l
0 I i k l l
s
RESPONSE TO HIGH CONTAINMENT PRESSURE E0P 35 FR-Z.1 Page 2 Rev. 2 A. PURPOSE This procedute provides actions to respond to a high containment pressure.
B. ENTRY CONDITIONS This procedure was written for Fodes 1, 2, 3, and 4. Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.
This procedure is entered from E0P 35 F-0.5, CONTAINMENT Critical Safety Function Status Tree on a RED or ORANGE condition.
4 0
O OPLC4&t 344
e .
RESPONSE TO HIGH CONTAINMENT PRESSURE E0P 35 FR-Z.1 Paga 3 Rev. 2
'M STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED 1 Verify Containment Isolation CLOSE valves.
Phase A Valves - CLOSED CAUTION If E0P 35 ECA-1.1 LOSS OF EMERGENCY COOLANT RECIRCULATION, is in effect, containment spray should be operated as directed in E0P 35 ECA-1.1 rather than steps 3 and 6 below.
2 Determine if CDA has NOT occurred
- a. Check Containment a. Go to Step 3
AND ESF status panel GP4 CDA - NOT ILLUMINATED
- b. Verify Containment Air b. START fans Recirculation Fans -
RUNNING
)
- c. Go to Step 7 O
OP50641 344
e .
RESPONSE TO HIGd CONTAINMENT PRESSURE E0P 35 FR-Z.1 Pega 4
~*
Rev. 2
.fy (v) -
STEP ACTION /EXPECTIO RESPONSE RESPONSE NOT 08TAINED 3 Verify Quench Spray Operation
- a. Check Quench Spray a. Go to Step 3c System Flow Exists
- b. Go to Step 4
- c. Check RWST - NOT EMPTY c. Go to Step 4
- d. ' Verify Quench Spray d. START pumps Pumps RUNNING
- e. Verify Quench Spray e. OPEN valves valve alignment
- 1. Quench Spray Pump ,
Discharge OPEN ,
- 2. Quench Spray Pump to Containment Spray OPEN
- f. Check Quench Spray Pump f. Go to step 3h Flow - RESTORED
)
- g. Go to Step 6
- h. PULL TO LOCK all Containment Recirc pumps
- 1. RESET SI J. OPEN RWST Recirc Pump Suction Header Isolation Valves at MB1 (3QSS*A0V27 and 28)
- k. Locally OPEN the Containment Recirc System Supply and Return from RWST manual vrive (3RSS-V25)
O OPK6&1 3-44
.u.
e .
MEsrvN5E TO HIGH GUNTAINMENT PRESSURE E0P 35 FR-Z.1 Paga 5 Rev. 2
^
.,/T .
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED NOTE The following steps, 3.1 through 3.p should only be performed for ONE Containment Recire pump. '
- 1. Remove power AND locally CLOSE Containment Recire Pump Suction Isolation l
Valve 3RSS*MOV23A : 32-4T-F8E or 3RSS*MOV23B : 32-4U-R3E or 3RSS*MOV23C : 32-47-F8H or 3RSS*MOV23D : 32-4U-R3H or
- m. Unlock and OPEN the applicable Containment ,
Recirc pump Suction from .
RWST manual valve. '
Pump A: 3RSS*V29 or Pump B: 3RSS*V27 or Pump C: 3RSS*V28 or Pump D: 3RSS*V26 O
- n. Verify Containment Recirc n. CLOSE valve pump to RHR Train Valve -
CLOSED
- o. Verify Containment Recirc o. OPEN valve i pump to Containment Spray Header - OPEN
- p. START the appropriate l' Containment Recirc pump 4 Verify Containment Isolation CLOSE valves Phase B Valves - CLOSED 7
5 Ve*ify Containment Air STOP fans Recirculation Fans - STOPPED
O .
CPK$41 3 44 I
. . _ _ . _ . _ _ , . _ _ . . . - _ _ _ , ._ _ _ _ _ _ _ . _ . . _ _ _ - -_.. , . _ . _ - - _ - - . - - - - - _ _ , . . - . - - ~ . . _ - - -
e .
MthrVNst TO HIGH CONTAINMENT PRESSURE EOP 35 FR-Z.1 Pega 6 Rev. 2
[ h l kl -
STEP l ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED 6 Verify Containment Recirculation Spray Operation
- a. Check Containment a. Go to 11tep 6c Recirculation Pump Flow Present
- b. Go to Step 7
- c. Check CDA signal c. Return to Step 6a after present > 660 seconds 660 seconds has elapsed since receipt of CDA
- d. Verify Containment d. Verify Containment Recirculation Pumps Sump Level > 1.5 feet RUNNING AND START pumps ,
- e. Verify Containment e. OPEN' valves Recirculation valve alignment
- 1. Containment Recirculation Pump
, Suction Isolation
< OPEN
- 2. Containment Recirculation Pump Spray Header OPEN
- 3. Containment Recirculation Heat Exchanger Service Water Inlet OPEN
- 4. Containment Recirculation Heat Exchanger Service Water Outlet OPEN 7 Verify Main Steamline CLOSE valves Isolation AND Bypass Valves -
CLOSED 8 Verify Main Feedwater Isolation
- a. Verify Motor AND Turbine a. TRIP pumps Driven Main Feed Pumps -
TRIPPED
- b. Verify Main Feedwater b. CLOSE valves Isolation Valves -
CLOSED
- .. s.
D RESPONSE TO HIGH CONTAINMENT PRESSURE E0P 35 FR-2.1 Page 7 Rev. 2 l
(' -
eTEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED
- c. Verify Main Feedwater c. CLOSE valves Flow Control Valves -
CLOSED
- d. Verify Main Feedwater d. CLOSE valves Flow Control Bypass Valves - CLOSED
- e. Verify Steam Generator e. CLOSE valves Chemical Feed Pump Isolation Valves CLOSED CAUTION
- 1) At least one SG must be maintained available for RCS cooldown.
- 2) If all SGs are faulted, at least 75 gpm feed flow should be maintained to each SG.
9 Check if Auxiliary Feedwater O Flow Should continue to all SG
- a. Check NO SG Pressure a. CLOSE affected SG DECREASING IN AN Auxiliary Feedwater UNCONTROLLED MANNER Control Valves (Motor AND NO SG COMPLETELY AND Turbine Driven DEPRESSURIZED Pump Lines) 4 O
OPKee 1 3 44
KEsr0Nst EU HIGH CUNIAINMENT PRESSURE EOP 35 FR-Z.1 Paga 8 Rev. 2 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED 10 Check Hydrogen Concentration
- a. Check Hydrogen concentration a. Obtain a hydrogen per OP 3313A, HYDROGEN concentration i
RECOMBINERS, HYDROGEN measurement at MONITORS AND RECOMBINER the Post Accident BUILDING VENTILATION Sampling Modulo and continue with Step 14 WHEN hydrogen concentration measurement available, THEN go to Step 10b.
- b. Check Hydrogen b. Go to Step 11 concentration < 5.0%
- c. Check Hydrogen c. Start hydrogen ,
concentration < 0.5% recogbiner system as per OP 3313A WYDROGEN RECOMBINERS AND RECOMBINER BUILDING r
- d. Go to Step 14
() 11 Notify Director of Station Emergency Organization (DSEO)
Of Hydrogen Concentration Inside Containment i
12 Obtain A Hydrogen l Concentration Measurement periodically 13 Check If Hydrogen Recombiner System Should Be Started -
- a. Check Hydrogen a. Go to Step 14 concentration - < 5% ;
t
- b. Start hydrogen recombiner system as per OP 3313A HYDROGEN RECOMBINERS AND RECOMBINER BUILDING 14 Return To Procedure And Step In Effect i
-FINAL- !
H OPSO6441 3 44 l