Forwards Request for Addl Info Re Amend to Plant,Units 2 & 3 TSs to Revise 3.8.1, AC Sources - Operating to More Clearly Reflect Surveillance Testing Conditions & Sys Design Requirements
ML20205B915
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/26/1999
From: Clifford J
NRC (Affiliation Not Assigned)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
TAC-MA0240, TAC-MA0241, TAC-MA240, TAC-MA241, NUDOCS 9904010021
Download: ML20205B915 (3)


Text

,z 4

March 26,1999 l Mr. Harold B. Ray Executive Vice President Southern California Edison Company San Onofre Nuclear Generating Station j

P O. Box 128 San Clemente, Califomia 92674-0128

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON DIESEL GENERATOR SURVEILLANCE REQUIREMENTS (TAC NOS. MA0240 AND MA0241)

[

i l

Dear Mr. Ray; I

In a letter dated June 18,1997, Southern Califomia Edison (SCE) submitted a request for l

amendment to the San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 technical specifications to revise TS 3.8.1, "AC Sources - Operating" to more clearly reflect surveillance testing conditions and system design requirements, in a telephone conference call conducted with your staff on March 10,1999, we discussed a need for additional information with respect to the time for an emergency diesel generator to reach steady state required voltage and frequency. To complete our review, we request that you provide the additional information as identified in the enclosure within 30 days of the date of this letter. Your timely response to the request for additional information will assist us in meeting our review schedule. This information and tha schedule have been discussed with Jack Rainsberry of your staff.

Please call Brenda Mozafari at (301) 415-2020 or me at (301) 415-1352 if you have any f

. questions.

Sincerely,

. Original Signed By

James W. Clifford, Senior Project Manager

~ Project Directorate IV-2 j

Division of Reactor Projects ll!!!V

/

j g'

f

Office of Nuclear Reactor Regulation '

J Docket Nos. 50-361 DISTRIBUTIONi and 50-362

[ Docket Filei CWu

_ PUBLIC

-ACRS

Enclosure:

Request for Additional Information PDIV-2 R/F PGwynn, Region !V JZwolinski/SBlack. LSmith, Region IV WBateman cc' lencl:_ See next page JClifford :

w

' EPeyton OGC; DOCUMENT NAME: G:\\2240RAl.wpd To receive e copy of this document Indicate in the box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy L

OFFICE PDIVn2tPM PD111-3fPM PDIV-2/LA NAME JClitWd Bf4 bis %

EPeyton A^p 3

. DATE.

03/$99 03$1s/99 03d99

OFFICIAL RECORD COPY

.e<

mnm^

m r r r "~ ~ ", np)e 9904010021 990326 g

ADOCK0500g1

[s.-

a-

.a DR 4

c 1

l Mr. Harold B. Ray March 26, 1999 i

cc w/ encl:

Mr. R. W. Krieger, Vice President Resident inspector / San Onofre NPS Southem Califomia Edison Company c/o U.S. Nuclear Regulatory Commission San Onofre Nuclear Generating Station Post Office Box 4329 P. O. Box 128 San Clemente, Califomia 92674

]

San Clemente, Califomia 92674-0128

(

Mayor Chairman, Board of Supervisors City of San Clemente County of San Diego 100 Avenida Presidio 1600 Pacific Highway, Room 335 San Clemente, Califomia 92672 i

San Diego, Califomia 92101 Mr. Dwight E. Nunn, Vice President Alan R. Watts, Esq.

Southem Califomia Edison Company Woodruff, Spradlin & Smart San Onofre Nuclear Generating Station 701 S. Parker St. No. 7000 P.O. Box 128 j

Orange, Califomia 92668-4702 San Clemente, Califomia 92674-0128 Mr. Sherwin Harris Resource Project Manager Public Utilities Department i

City of Riverside 3900 Main Street Riverside, Califomia 92522 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Michael Olson

- San Onofre Liaison San Diego Gas & Electric Company P.O. Box 1831 San Diego, Califomia 92112 4150 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services

' Post Office Box 942732 Sacramento, Califomia 94234

1 1

j i

REQUEST FOR ADDITIONAL INFORMATION FOR PROPOSED DIESEL GENERATOR SURVEILt.ANCE SAN ONOFRE NUCLEAR GENERATING STATION. UNITS 2 AND 3 DOCKET NOS. 50-361 AND 50-362 Surveillance Requirements (SR) 3.8.1.7,12,15, and 20 currently require verification that each emergency diesel generator (EDG) starts from standby conditions and achieves in s10 seconds, voltage 23924 V and s4796V, and frequency 258.8 Hz and s61.2 Hz. You have proposed to eliminate the 10 second time requirement for the EDG to reach steady state voltage and frequency limits. The proposed change would instead require that the EDG j

achieves in s9.4 seconds the voltage 24297 V and frequency 259.7 Hz and maintains steady state voltage 24297V and s4576V, and frequency 259.7Hz and sB1.2Hz. The 9.4 second i

requirement ensures that the EDG meets the assumptions of the design basis LOCA analysis, 1

which assumes that the EDG starts, accelerates to the required frequency and voltage, connects to the 4.16 kV engineered safety feature (ESF) bus, and resets the ESF bus under i

voltage relay logic within 10 seconds of a safety injection actuaticn signal (SlAS).

However, the proposed change does not specify the time when the EDG achieves steady state voltage 24297V and s4576V, and frequency 259.7Hz and s61.2Hz. The time for an EDG to reach steady state required voltage and frequency is important to ensure that the EDG meets its des'gn basis. Therefore, this time must be monitored and trended to assure that there is no degradation of the govemor and the voltage regulator. The staff recommends that the pertinent sections of the Bases be revised to include the following:

In addition to the SR requirements, the time for an EDG to reach steady state operation, unless the modified EDG start method is employed, is periodically monitored and trend evaluated to identify degradation of govemor and voltage regulator performance.

.