3 -50U1HIRN cat 1iORN1A A. Edward Scherer EDISON 2"%,,a1,,
An ID50N INTI RN ATION.Al
- Company April 24, 1999 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Response to the NRC's Request for Additional Information on Diesel Generator Surveillance l
Requirements (TAC Nos. MA0240 and MA0241)
San Onofre Nuclear Generating Station Units 2 and 3
References:
- 1) Letter from James W. Clifford (NRC) to Harold B. Ray (SCE),
dated March 26,1999,
Subject:
Request for Additional Information on Diesel Generator Surveillance Requirements (TAC Nos. MA0240 and MA0241)
- 2) Letter from Dwight E. Nunn (SCE) to Document Control Desk (NRC) dated June 18,1997,
Subject:
Diesel Generator Testing, Proposed Technical Specification Change Number NPF-10/15-478, h0/
San Onofre Nuclear Generating Station, Units 2 and 3 l
1 Gentlemen-1 This letter is to inform the NRC that Southem Califomia Edison (SCE) will submit the additional information requested by the NRC in a letter dated March 26,1999 (Reference 1) by May 28,1999. Reference 1 requested information by April 25,1998 in support of NRC review of Amendment Applications 168 and 154 for San Onofre Units i
2 and 3, " Diesel Generator Testing," (Reference 2). However, SCE needs additional i
time to develop a response. During a recent telephone discussion with SCE's Plant I
Licensing Manager, the NRC Project Manager for Units 2 and 3 has agreed to the delay in the response while SCE has further discussions with the NRC staff.
9904280079 990424
.,q' PDR ADOCK 05000361 P
PDR P. O. Box 128 San Clemente. CA 92674-0128 449-K47501 Fax 9490t47575 l
t-
.,.c i
Document Control Desk April 24, 1999 if you have any questions or need additional information regarding this matter, please feel free to contact me or Jack Rainsberry at (949) 368-7420.
i Sincerely,
'ff2 cc:
E. W. Merschoff, Regional Administrator, NRC Region /
J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 L. Raghaven NRC Project Manager, San Onofre Units 2 and 3 I