3F0286-04, Monthly Operating Rept for Jan 1986

From kanterella
(Redirected from ML20203D979)
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1986
ML20203D979
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/31/1986
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0286-04, 3F286-4, NUDOCS 8604240047
Download: ML20203D979 (7)


Text

_ __ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ __ _

i .

I i

h OPERATING DATA RDCRT i

DOCKET NO.18-302 DATE COMPL2TED gy' m TILIPHON3 802 OPERATING STATUS

1. Unit Nume - Crystal River Unit 3 M ess (2/4/86) Note circled -

l 2.

  • 12/1/A5 - 12/31/As changes due to an error
3. M: - y pened: ww 2544 in the November report.
4. Namepiste Reting (Grom MWe): 890
5. Design Elseein! Rating (Net MWe): 825 _
6. Maxissasi ?; i": Capedty(Genes MWe): 860
7. Maaissesus DepsedeWe Capedty (Not MWe): 821
8. If Changes Oscur 4: Capacity Ratings (Items Nweber 3 Tlwough 7) Sleer last Report, Giw Reasses:

_ NA

9. Power Level To Which Raseteted. lf Any (%t MW): - NA j le. B====== Per Basesiastana, If Any: NA _

KO this Meath Yr..to Dete Cumminthe .

II. Hours la * ;: 4 Period 744 -- 8780 _ 71184 . '

12. Ninnber Of Meurs Rosesor Was Celtient 605.9 4345.3 50301
13. Reector Reserw shesdows News 0 _ 0 1280.3
14. Hours Generater Osthie 603 __ 4173 49000.3
15. Unit Reserw Shutdown Hears 0 0 o
16. Gross Thermal Eastgy Genersted (MWH) _1393054 C8806080 1 C110461l86D

, 17. Geom Elsearles! Ensegy Ceasented (MWN) -- 486485 3014845 37742l l$2 i

13. Net Electries! Emergy Generstad (WWM) 441639 _  !$48881 35844172
19. Unit Servise Factar 81 0 % -- 47 8 % ,,

83.8 %

20. Unit Availabilny Feete, 81.0 % 47.8%

I _

63.8 %

21. Unit Capnehy Feeter(Umns MDC kt)

39.a% R3.3% *

22. Unit Capseley Feeser(Using DER Net) 75.2% __

3 8i49t -- -- -- 94.3%

i ,

23. Unk Fersed Osage Ass, 19.0% _ 10.0% 9.4%
24. Sheadowns Scheduled Over Next 6 Maaths (Type.Dete,and Durstion of Eacht: .

.None "

. g. .

25. M Shet Dews At Ead Of Report Perled, techneted Dete of Startup: _ NA - -

j AeW['

26. Unha la Test Setes (Prler to Ceaumercial Operaties): Foresort

,.M  :* s -

DifTRAL CJt!TICALITY IIIO

  • i
  • INrflALisLECTRICITY

.lM.DO.T"

  • COMMERCIAL OPERATc .1 b' 8/IIOT

.a e 1 8604240047 860131

PDR ADOCK 05000302 7(@N

! R PDR '

OPERA TING DATA RDORT DOC TNo. m.202 DATE 1S N A9 COMPLETED gy D. GrahmeF TELEPHONE M02 o OPERA 7980 STATUS 1

Notes (2/4/86) Note circled cr"e=1 Riva" U",e f  !. Unit Name 3

2. Reporting Pened. 11/1/85 - 11/30/85 changes due to an error
3. Lisemoed TherinalPower (WWt):

2544 __

in 2e he%er vt.

i 4. Nesseplete Roths (Gross MWe): Ae0 _

) 5. Design Electrial Reting (Net MWe): 825 __

6. Maakasse C.; -- f " Capacky (Gross Mwe): - 860
7. Maaknam Dependable Cepeaky (Net MWe): 821 l S. If Changes Oceur h Cepecity Ratings (Items Nwnbar 3 Through 7) Since Last Report.Giw Reasses:

MA E

9. Power LevelTo Whish Reseisted.If Any(Not MWe): NA
10. Ressoas For Reem6ctices.lf Any:

This Meath Yr to. Dele Cassaletin i

11. Hours in imporths Period - 2Sn - an1A -

smn  !

12. Nimmber of House Roseser was Critical 671.3 3779.4 49695.1 I 0
13. Reacter Reerw shutdown Hoess -

0 1230.3 l 14. Hears Generater on Lhe 668.2 3570 _48487.8

15. Unit Reserw shutdown Hears n n o i
16. Geen Thenmal Emergy Generated (MWH) Q$5045(D L74138267 C109075811)
17. Gross Elecensal Emergy Generated (MWH) 538751 _. 252a380 37255597
18. Met Elsarial Essegy Generated (WWH) 511645 2387022 35383033
  • l 19. Unit Serv 6ee Facser er at _ _ _

AA.si a3,at

20. Unit AveRebany Facter 92.8% 44.5% 63.4%
21. Usk Cepneity Facter (Using MDC Net) -

86.6% 36.3% 58.1%

22. Unk capedty Fester (Ueng DER Net) as.It sa,3i sa it

) 23. Unit Fersed Onasse Date - 7.2% 8.3% _

13.4%

24. S6endowns - Over Next 6 Meaths (Type. Dete. nad Duration of Isch i: ,

MA . ,

j .

l 23. If Shot Down At End of Report Peled. Estbnesed Daae of startup: __ NA _ _ _

36. Unks la Tes sestes (Pster to Comanruini Operaties): Ferseest Asinessed INITIAL CRITICALITY __

1/ 4/77

  • e iNimt.itscnuCITv usam-COMMERCIAL OPERATION 3/13/77]*

OPERATING DATA REPORT DOCKET NO. so-3n, DATE 2/1/as COMPl.ETED BY D. Graham TELEPHONE tena) 7qM-3802 OPERATING STATUS i Crystal River Unit 3 Not" 3, paj g. ,;

2. Reporting Period: 1/1/88 - 1/31/88 ---
3. Llosased Thermal Power (MW ): 2544
4. Nameplate Rating (Gross MWe): - 890 1 S. Design Electrial Raths (Net MWe): a25
6. Maximma Dependable capadty (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): A91
8. If Cheapes Occur in Capacity Ratings (ltems Nwnber 31hrough 7) Staae !.ast Report. Give Reasons:

NA

9. Power Inval To WMeh Restricted,If Any (Net MWe): NA
10. Reasons For Reserietions,if Any: NA _
~

i e _

This Meath YrAe Date Camelative

!!. Hours la Reportha Period 744 744 '77928

12. Number Of Hours Rasetor Was Critim! 23.6 __ _ 23.6 50324.6 ~
13. Rescior Reserve Shutdown Hours n 0 1280.3
14. Hours Generster On.une 23.6 23.6 49114.4 IS. Unit Reserve shutdown Hours i n _ n
16. Gross Thermal Energy Generated (MWH) 551'13 551n3 110523968  ;
17. Gross Electnce! Energy Generated (MWH) 19541 , _ , 19541 37761603
18. Net Electrical Emergy Generated (MWH) i nun 1aaan 38a83252 *,
19. Unit Servloe Facter -- 1.2 % 3.2% . - 83.0 %
20. Unit Aveliability Factor . 32% _

3.2% _

63.0 %

. . 21. Unit Capacity Feetor (Using MDC' Net)

  • 33% 't nE 87.7 %
22. Unit Capacity Factor (Usha DEA Net) 3.0% 3.0% 55.8 % _ ]
23. Valt Forced Outass Aste an su on nu en.sg -
24. Shutdowns Scheduled Over Next 6 Months (Type.Dete. sad Durstnon of Each): .

i . ,

25. If Shut Down At End Of Report Period.Estimsted Date ef Startup
'l /1't / A A
26. Units in Test Status (Prior io Commercial Operetion): Foreemet Achieved

' h

  • INITIAL CRITK'ALTTY INITIAL ELECTRICITY 1/14/77 1/10121 l COMMERCIAL OPER ATION 341,3g,2(, ,,

)

term

4\ i k AC.L D AIL) l N I PuhtR Lli LL h,) DOCKET NO. _5_0-302 UNIT FLCRP-3 DATE 2/4/a8 __

COMPLETED BY D. Graham __

TELEPHONE (904) m-3 an?

MONTH January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 3 -

774 37 (l '

2 0 18 3 __

19 4 20 5 _

21 6 22 O t --

23 8 --

24 9 -

25 10 26 __

11 -

27 12 --

28 13 -

29 _

14 30 __

15 31 -

a Sr '

16 l

l INSTRUC11DNS On this format, list the awrige dauy unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole mepwsit.

i 19/77 n

.-8..

h

~

i i

1 . .

UNIT 5HUIDOWNB AfS N N '

R P-3 NAhtE _

DATE 2/4/86 .

5 EUROPLETED SY S A. St. , art ..

{ , REPORT ROENffff I/88 TELEPHONE i

I "E

- .I y "s E Lkvasee { Came & CueeeceW N. Deee [ =

{ } g elc Ewas E ko Attion to gu d eW p,,, ,,, g ,y,,,,,,c, I3 ifi et l

  • - e7 Royart s u

6 i .

86-81 868101 F 720.4 A 3 86-01 CB PUMPXK The "A" Reactor Coolant Pusnp shaf t l l failed while the plant was operating et l appromineately 92% power. The reactor tripped automatically.

f I -

l l

l 1

i i

1 i

! l 1

1 2 'I se sW 4

F: F.=ed messen: .Eshsbie G . Inst ructions 5: Schedaded A4gdyneene Falluee(Empesin) , g fue PrepseaHun ed Dzes j kh eiTest z_m,,,, g se,,,, Entes Sheets for tiensee 0-ResumEng 3-Aerto Scesem Everit Rerust ILERI FAc int'Rf 4.

D4semissory Resseldlan 4-Cesit tawed of61)

E4pesseer Trotning & IAeese Essashamelan 5-R estoc ed to ad

p. h 9-ettier G4perstlanet Error (Esplein) Eshibn I - Same Souece Pf77) Hesher(Emplain)

.' l

. .. . l MONTH 1.Y OPERATIONA1. SL?S'ARY

. STATEMENT DOCKET No. 50-302 UNIT FLCRP-3 DATE 2/4/06 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH _ Januar'v 1988

SUMMARY

STATDfENT: Crystal River 3 tripped on January 1,1986 and will remain down until repairs are complete.

o

' ~

g e .

I 9

e

    • LxU b!,*G  ; W!' ;.[

/I , M08 Of 578t!BUTON e

g, y, p y,, yA2p e 3. AfDerdi NT1A D. T. Swe;4 $P39 e J.M.5.anchstd A&E L. C. Kelley nut?
8. L Creng NUe7 A 5, [U &

L Cr flin S C O n p 0 m a 7 e o se f[',f[, h3 K. F. Lancaster NT38 February 7, 1986 (?," A.E. Fv J end' 3F0286-04 s'. L. nemield NAAP  !

T. F. Statma (NRC) NT at  !

3. T. Telford H9 '
C. R. E settroen H3 1 Mr. James M. Taylor, Director i IE E",S " dis  !

Office of Inspection and Enforcement 5;,5;5jy,' ,

SC gg ,3 I

U.S. Nuclear Regulatory Commission H.su.orte .nir> NRC Attn: Document Control Desk pffd, , OrlAe,,pu Washington, DC 20555 C.K.xir= - saw C. K. 9andlag hat L. D. Cromer NU$

Subject:

Crystal River Unit 3 + D. h r AN!

Docket No. 50-302 Operating License No. DPR-72

!EtP"'"

RecoreTw C%

NPO ,

Monthly Operating Report l

Dear Sir:

O Attacneo are t eive (12) coRies of sne Crystai River unit 3 a.nuary 1986 Monthly Operating Report and one corrected page from the November and l

l December 1985 reports. These reports are submitted in accordance with l Technical Specification 6.9.1.6. l l

Sincerely,

' 16 O/ d' G. R. Westafer IC#cwO ogG 8 Manager, Nuclear Operations Licensing and Fuel Management . , . .k{

AEF/feb Cer d Attachments cc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 q h l G E N ER AL OFFICE 32n1 mav.emien mer ++ ma..m . re ma, um ** e...,*= r'-ad. *= = *" aaa *'