3F0286-04, Monthly Operating Rept for Jan 1986
| ML20203D979 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/31/1986 |
| From: | Graham D, Westafer G FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F0286-04, 3F286-4, NUDOCS 8604240047 | |
| Download: ML20203D979 (7) | |
Text
_
i I
i h
OPERATING DATA RDCRT i
DOCKET NO.18-302 DATE COMPL2TED gy' m
TILIPHON3 802 OPERATING STATUS
- 1. Unit Nume - Crystal River Unit 3 M ess (2/4/86) Note circled l
- 2.
- 12/1/A5 - 12/31/As changes due to an error
- 3. M: - y pened:
ww 2544 in the November report.
- 4. Namepiste Reting (Grom MWe):
890
- 5. Design Elseein! Rating (Net MWe):
825 _
- 6. Maxissasi ?; i": Capedty(Genes MWe):
860
- 7. Maaissesus DepsedeWe Capedty (Not MWe):
821
- 8. If Changes Oscur 4: Capacity Ratings (Items Nweber 3 Tlwough 7) Sleer last Report, Giw Reasses:
NA
- 9. Power Level To Which Raseteted. lf Any (%t MW): - NA j
le. B====== Per Basesiastana, If Any:
NA KO this Meath Yr..to Dete Cumminthe II. Hours la * ;: 4 Period 744
- 12. Ninnber Of Meurs Rosesor Was Celtient 605.9
-- 8780
_ 71184.
4345.3 50301
- 13. Reector Reserw shesdows News 0
0 1280.3
- 14. Hours Generater Osthie 603 4173 49000.3
- 15. Unit Reserw Shutdown Hears 0
0 o
- 16. Gross Thermal Eastgy Genersted (MWH)
_1393054 C8806080 1 C110461l86D
- 17. Geom Elsearles! Ensegy Ceasented (MWN)
-- 486485 3014845 37742l l$2 i
- 13. Net Electries! Emergy Generstad (WWM) 441639 _
!$48881 35844172
- 19. Unit Servise Factar 81 0 %
- 20. Unit Availabilny Feete, 81.0 %
-- 47 8 %
83.8 %
75 RM 47.8%
63.8 %
I
- 21. Unit Capnehy Feeter(Umns MDC kt)
- 22. Unit Capseley Feeser(Using DER Net) 75.2%
39.a%
R3.3%
3 8i49t -- -- -- 94.3%
i
- 23. Unk Fersed Osage Ass, 19.0%
10.0%
9.4%
- 24. Sheadowns Scheduled Over Next 6 Maaths (Type.Dete,and Durstion of Eacht:
.None g.
- 25. M Shet Dews At Ead Of Report Perled, techneted Dete of Startup: _ NA AeW['
- 26. Unha la Test Setes (Prler to Ceaumercial Operaties):
j Foresort
- s
,.M DifTRAL CJt!TICALITY IIIO i
INrflALisLECTRICITY
.lM.DO.T"
- COMMERCIAL OPERATc.1 b'
8/IIOT
1 8604240047 860131
.a e PDR ADOCK 05000302 7(@N R
- - - - - - - - - ~ ~ - - -
OPERA TING DATA RDORT DOC TNo. m.202 DATE 1S N A9 COMPLETED gy D. GrahmeF TELEPHONE M02 o
OPERA 7980 STATUS 1
f
!. Unit Name cr"e=1 Riva" U",e 3
Notes (2/4/86) Note circled
- 2. Reporting Pened.
11/1/85 - 11/30/85 changes due to an error
- 3. Lisemoed TherinalPower (WWt):
2544 in 2e he%er vt.
i
- 4. Nesseplete Roths (Gross MWe):
Ae0
)
- 5. Design Electrial Reting (Net MWe):
825
- 6. Maakasse C.; -- f " Capacky (Gross Mwe): - 860 821
- 7. Maaknam Dependable Cepeaky (Net MWe):
l S. If Changes Oceur h Cepecity Ratings (Items Nwnbar 3 Through 7) Since Last Report.Giw Reasses:
MA E
- 9. Power LevelTo Whish Reseisted.If Any(Not MWe):
NA
- 10. Ressoas For Reem6ctices.lf Any:
This Meath Yr to. Dele Cassaletin i
- 11. Hours in imporths Period 2Sn an1A smn
- 12. Nimmber of House Roseser was Critical 671.3 3779.4 49695.1 I
- 13. Reacter Reerw shutdown Hoess 0
0 1230.3 l
- 14. Hears Generater on Lhe 668.2 3570
_48487.8
- 15. Unit Reserw shutdown Hears n
n o
i
- 16. Geen Thenmal Emergy Generated (MWH)
Q$5045(D L74138267 C109075811)
- 17. Gross Elecensal Emergy Generated (MWH) 538751 252a380 37255597
- 18. Met Elsarial Essegy Generated (WWH) 511645 2387022 35383033 l
- 19. Unit Serv 6ee Facser er at AA.si a3,at
- 20. Unit AveRebany Facter 92.8%
44.5%
63.4%
86.6%
36.3%
58.1%
- 21. Usk Cepneity Facter (Using MDC Net)
- 22. Unk capedty Fester (Ueng DER Net) as.It sa,3i sa it
)
- 23. Unit Fersed Onasse Date 7.2%
8.3%
13.4%
- 24. S6endowns - Over Next 6 Meaths (Type. Dete. nad Duration of Isch i:
MA.
j l
- 23. If Shot Down At End of Report Peled. Estbnesed Daae of startup: __ NA
- 36. Unks la Tes sestes (Pster to Comanruini Operaties):
Ferseest Asinessed 1/ 4/77 INITIAL CRITICALITY e
iNimt.itscnuCITv usam-COMMERCIAL OPERATION 3/13/77]*
OPERATING DATA REPORT DOCKET NO.
so-3n, DATE 2/1/as COMPl.ETED BY D. Graham TELEPHONE tena) 7qM-3802 OPERATING STATUS i
Crystal River Unit 3 Not" 3, paj g.,;
- 2. Reporting Period:
1/1/88 - 1/31/88
- 3. Llosased Thermal Power (MW ):
2544 890
- 4. Nameplate Rating (Gross MWe): -
1 S. Design Electrial Raths (Net MWe):
a25 860
- 6. Maximma Dependable capadty (Gross MWe):
A91
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Cheapes Occur in Capacity Ratings (ltems Nwnber 31hrough 7) Staae !.ast Report. Give Reasons:
NA
- 9. Power Inval To WMeh Restricted,If Any (Net MWe):
NA
- 10. Reasons For Reserietions,if Any:
NA
~
i e This Meath YrAe Date Camelative
!!. Hours la Reportha Period 744 744
'77928
- 12. Number Of Hours Rasetor Was Critim!
23.6
__ _ 23.6 50324.6 ~
- 13. Rescior Reserve Shutdown Hours n
0 1280.3
- 14. Hours Generster On.une 23.6 23.6 49114.4 IS. Unit Reserve shutdown Hours i
n n
- 16. Gross Thermal Energy Generated (MWH) 551'13 551n3 110523968
- 17. Gross Electnce! Energy Generated (MWH) 19541 19541 37761603
- 18. Net Electrical Emergy Generated (MWH) i nun 1aaan 38a83252
- 19. Unit Servloe Facter
-- 1.2 %
3.2%.
- 83.0 %
- 20. Unit Aveliability Factor.
32%
3.2%
63.0 %
. 21. Unit Capacity Feetor (Using MDC' Net) 33%
't nE 87.7 %
- 22. Unit Capacity Factor (Usha DEA Net) 3.0%
3.0%
55.8 %
]
- 23. Valt Forced Outass Aste an su on nu en.sg
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Dete. sad Durstnon of Each):
i
- 25. If Shut Down At End Of Report Period.Estimsted Date ef Startup:
'l /1't / A A
- 26. Units in Test Status (Prior io Commercial Operetion):
Foreemet Achieved h
1/14/77 INITIAL CRITK'ALTTY INITIAL ELECTRICITY 1/10121 l
COMMERCIAL OPER ATION 341,3g,2(,,,
)
term
4\\ i k AC.L D AIL) l N I PuhtR Lli LL h,)
DOCKET NO. _5_0-302 UNIT FLCRP-3 DATE 2/4/a8 COMPLETED BY D. Graham TELEPHONE (904) m-3 an?
MONTH January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 3 774 37 (l '
2 0
18 3
19 4
20 5
21 6
22 O
t 23 8
24 9
25 10 26 11 27 12 28 13 29 14 30 15 31 a
16 Sr l
l INSTRUC11DNS On this format, list the awrige dauy unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole mepwsit.
i 19/77 n
.-8..
h
~
i i
1 UNIT 5HUIDOWNB AfS N N NAhtE R P-3 DATE 2/4/86 EUROPLETED SY S A. St., art..
5 REPORT ROENffff I/88
{
TELEPHONE i
I' "E
} g elc
.I y "s
E Lkvasee
{
k Came & CueeeceW N.
Deee
[
{
Ewas E
=
Attion to o
d e7 3 fi e Royart s eW gu p,,,,,, g,y,,,,,,c, l
i I
t u
6 i
86-81 868101 F
720.4 A
3 86-01 CB PUMPXK The "A" Reactor Coolant Pusnp shaf t l
l failed while the plant was operating et j
l appromineately 92% power. The reactor f
tripped automatically.
I l
l l
1 i
i 1
i l
1 1
2
'I 4
F: F.=ed messen:
se sW
.Eshsbie G. Inst ructions 5: Schedaded A4gdyneene Falluee(Empesin) fue PrepseaHun ed Dzes g
j kh eiTest z_m,,,, g se,,,,
Entes Sheets for tiensee 0-ResumEng 3-Aerto Scesem Everit Rerust ILERI FAc int'Rf 4.
D4semissory Resseldlan 4-Cesit tawed of61)
E4pesseer Trotning & IAeese Essashamelan 5-R estoc ed to ad
- p. h 9-ettier G4perstlanet Error (Esplein)
Eshibn I - Same Souece Pf77)
Hesher(Emplain)
MONTH 1.Y OPERATIONA1. SL?S'ARY STATEMENT DOCKET No. 50-302 UNIT FLCRP-3 DATE 2/4/06 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH Januar'v 1988
SUMMARY
STATDfENT: Crystal River 3 tripped on January 1,1986 and will remain down until repairs are complete.
o
~
g e
I 9
e
LxU b!,*G
- W!' ;.[
/I M08 Of 578t!BUTON
- e g, y, p y,,
yA2p e
- 3. AfDerdi NT1A D. T. Swe;4
$P39 e
J.M.5.anchstd A&E L. C. Kelley nut?
- 8. L Creng NUe7 A
5, [U L Cr flin S
f[',f[,
h3 C O n p 0 m a 7 e o se K. F. Lancaster NT38 February 7, 1986
(?,"
A.E. Fv J end' 3F0286-04 s'. L. nemield NAAP T. F. Statma (NRC)
NT at
- 3. T. Telford H9 C. R. E settroen H3 1
Mr. James M. Taylor, Director i IE E",S
" dis SC Office of Inspection and Enforcement 5;,5;5jy,'
gg,3 U.S. Nuclear Regulatory Commission H.su.orte.nir>
NRC Attn: Document Control Desk
- pffd, OrlAe,,pu Washington, DC 20555 C.K.xir= -
saw C. K. 9andlag hat L. D. Cromer NU$
Subject:
Crystal River Unit 3
+ D. h r
AN!
Docket No. 50-302
!EtP"'"
C%
Operating License No. DPR-72 RecoreTw NPO Monthly Operating Report
Dear Sir:
O Attacneo are t eive (12) coRies of sne Crystai River unit 3 a.nuary 1986 Monthly Operating Report and one corrected page from the November and December 1985 reports.
These reports are submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, 16 O/
d' IC#cwO ogG 8
G. R. Westafer Manager, Nuclear Operations
.k{
Licensing and Fuel Management Cer d AEF/feb Attachments cc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 q
h l
G E N ER AL OFFICE 32n1 mav.emien mer ++ ma..m. re ma, um **
e...,*=
r'-ad. *= = *" aaa *'