PNO-III-83-098A, on 831116 Licensee Informed That eddy-current Exam of All Tubes in Both SG Using New High Sensitivity Probe W/Continued Identification of Crack Indications Essentially Completed

From kanterella
(Redirected from ML20198Q351)
Jump to navigation Jump to search
PNO-III-83-098A:on 831116 Licensee Informed That eddy-current Exam of All Tubes in Both SG Using New High Sensitivity Probe W/Continued Identification of Crack Indications Essentially Completed
ML20198Q351
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/16/1983
From: Boyd D, Holzmer M, Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-83-098A, PNO-III-83-98A, NUDOCS 9711120183
Download: ML20198Q351 (1)


.

&,..lJ ikk r o- p u, g u PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-III-83-9 D2to Nave A r 16,1983

/ ya preliminary $tifycation constitutes EARLY notice of events of' POSSIBLE safe'y licinterestsignificaqce. t or lytton or evaluation.g a qd la basically all that is known by the staff on this date.The i -

4 Fccility: Consumers Power Co.

Palisades Nuclear Plant Licensee Emergency Classification:

Covert, MI 49043 Notification of an Unusual Event Alert Docket No. 50-255 Site Area Emergency General Emergency,

, _ g Not Applicable .:

a Subjcet CRACK INDICATIONS IN STEAM GENERATOR TUDES - UPDATE E s

The licensee has essentially completed eddy-current examination of ail tubes in bo h steam g;nerators using a new high sensitivity probe with continued identification of crack indications The nature of these indications has not yet been fully defined. <

u Westinghouse, the steam generator supplier, has been contracted by the licensee to remove ab ut 25 steam generator tubes or tube specimens for Laboratory anal'y' sis to9etermine the characteristics and causes of the crack indications. In a meeting between the licensee and Westinghouse on November 16, 1983, the preliminary schedule was developed for the steam g2nerator tube sork, extending the current refueling outage until April 1984. Tube removal is to begin December 5,1983, and last about one month. Following evaluation of the test data and development of the corrective actions, plugging of the af fected tubes is expected to

  • occur in February 1984 with startup and testing activities to take place in March 1984. I R; fueling activities are also underway. Other outage activities include repairs to the low-

['N j jary coolant pump.osure turbine rotor, which are more extensive than anticipated, and possible repair of a keelter (3 inches by 6 inches and weighing 3 pounds)The licensee discovered a broken portion of in the bottom of the reactor v- tel, cnd the coolant pumps are being inspected to determine the source of the piece.

RGgion III (Chicago) and the resident inspectors are monitoring the licensee's actions. The Of thafice of Nuclear Reactor Regulation has been informed of the steam generator findings by licensee.

Neither the licensee nor Region III plans to issue a news announcement at this time.

The State of Michigan will be notified.

The resident inspector was informed of the new schedule information at 12:30 p.m., CST, November 16, 1983. This,.information is current as of that time. .!

7 7

CONTACT:

4 M. Ho h

D. Boyd Lt)[)$6 9 V FTS 388-5562 FTS 388-5546 (9 r" \

DISTRTBUTION:

..k..,,.,;e s -

H. St. _ MN35 Phillips E/W Chairman Palladino EDO NRR W111ste Comm. Gilinsky IE NMSS PA Comm MPA OIA RES Asselatine ELD AEOD Air Rights

.D. Roberts

(

ACRS Bernthal

_ t., t

'13 SP

~

INPO NSAC_

MAIL:

ADM DMB DOT: Trans Only 1

CA l Applicablo Resident Site PDR Regions I . II , IV_ .V Licensee (Corporate Office) 9711120183 PDR 831116 ILE '

PNO-III-83-098 PDR . Rev. 08/10/83

__- _______w