IR 05000445/1989081

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-445/89-81 & 50-446/89-81 on 891023-1101 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program
ML20011D240
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/11/1989
From: Caldwell R, Powers D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20011D239 List:
References
50-445-89-81, 50-446-89-81, NUDOCS 8912260034
Download: ML20011D240 (2)


Text

{{#Wiki_filter:y- - y ,

h;,< . - > V q. ' , .: g.

APPENDIX A " ,, U.S. NUCLEAR REGULATORY COMMISSION REGION IV' , ' , NRC Inspection' Report: 50-445/89-81 Construction Permits: CPPR-126 , ' ' 50-446/89-81 CPPR-1?7 Dockets: 50-445 k' ;, - -50-446 License:.TU Electric Company (TV) 400 North Olive, L.B. 81 Dallas, Texas 75201 , Facility Name: Comanche Peak Steam Electric Station (CPSES) Inspectio'n At: CPSES,' Glen Rose, Texas , Inspection Conductedi October 23 - November 1, 1089

' Inspector: /N// f.

' A A. CaldweF1, Physical Security Specialist Dale /

Security and Emergency Preparedness Section f Accompanied: I By: .A. B. Earnest, Physical Security Specialist ' , Steve Bitter, NRR Resident Inspector-Joel Wiebe, NRR Senior Project Inspector " ' Appr'oved: Dr. D. A. Powers,. Chief, Security and Date Emergency Preparedness Section Inspection-Summary Inspection Conducted October 23 - November 1, 1989 (Report 50-445/89-81) . Areas Inspected: Routine, announced inspection of.the applicant's physical security program.

The Enclosure 1 contains the inspection findings of the physical security program. The areas inspected within the physical security program included physical barriers - vital areas (VA), detection aids - VA, lighting, and accountability of personnel in an emergency.

The Enclosure 2 ' 8912260034 891215 ENCLOSURE CONTAINS -{DR ADOCK 05000445 - PDC UPON SEPARATION THIS PAGE IS DECONTROLLED . .. . .

p -

- m t; .x , m:4y g n .d- ' ' ,

g..

- p , L contains the inspection findings for accountability of-personnel in an P ' emergency; y Results: Within.the program areas inspected, no violations or deviations were - identified. The inspector identified problem areas that' require further ' applicant action.

These areas-are identified as open items within this report.

~

Incomplete construction causes most of the pr.oblem areas. identified as open -:i tems. Significant delays in resolving these open items could impact the applicant's schedule for requesting an operating-license..Tne applicant does not limit personnel, access to-separate-VAs available with the computer. access ' ~ authorization system.

Most personnel = entering the site have access to all> , ' areas without prior determination of need. ' Construction activity is very' + extensive and_the burden of--limiting access-for VAs to required needs is rnt ,-manag'eable-as of'this: inspection date, It is difficult for theisecurity organization to perform in accordance with the physical security plan and not' impact construction activities.

Prior to issuance of a: license,.the applicant c will require some period of time to adjust to the more restrictive environment of anloperational access-authorization system.

. !

Inspection Conducted October 23 - November 1, 1939 (Report 50-446/89-81)-

Areas Inspected:.No inspection of Unit 2 was conducted.

Results:. Not ' appl _icable'. -q

1

- ! ! l ! ! i

! ENCLOSURE CONTAINS i V UPON SEPARATION THIS PAGE IS DECONTROLLED i ! ! ) }}