|
---|
Category:Inspection Plan
MONTHYEARML24232A2262024-08-19019 August 2024 Information Request, Security IR 2024404 ML24232A2412024-08-19019 August 2024 Information Request, ISFSI Security IR 2024401 IR 05000445/20240052024-08-15015 August 2024 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2024005 and 05000446/2024005) ML24205A2162024-07-23023 July 2024 September 2024 Emergency Preparedness Program Inspection - Request for Information ML24185A1382024-07-0202 July 2024 Inservice Inspection Request for Information IR 05000445/20230062024-02-28028 February 2024 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 Reports 05000445/2023006 and 05000446/2023006 IR 05000445/20230052023-08-23023 August 2023 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2023005 and 05000446/2023005)- Mid Cycle Letter 2023 ML23068A3782023-03-0909 March 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000445/2023011 and 05000446/2023011) and Request for Information IR 05000445/20220062023-03-0101 March 2023 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022006 and 05000446/2022006) IR 05000445/20220052022-08-22022 August 2022 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022005 and 05000446/2022005) IR 05000445/20224012022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000445/2022401; 05000446/2022401 ML22124A3042022-05-0505 May 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000445/2022003 and 05000446/2022003) and Request for Information IR 05000445/20210062022-03-0202 March 2022 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021006 and 05000446/2021006) ML21253A2332021-09-0909 September 2021 Request for Information: Comanche Peak Nuclear Power Plant, Units 1 and 2 (05000445 and 05000446); Occupation Radiation Safety (71124.01, 71124.02, 7511) ML21245A3072021-09-0202 September 2021 Request for Information ML21245A307 IR 05000445/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021005 and 05000446/2021005) ML21176A1292021-06-25025 June 2021 CPNPP FFD Inspection Doc Request 2021 ML21103A3982021-04-13013 April 2021 CP Security Inspection Information Request 2021403 ML21027A4322021-01-27027 January 2021 Information Request, Security IR 2021401 ML20309A3602020-11-0404 November 2020 Notification of NRC Design Bases Assurance Inspection (Teams) (Inspection Report 05000445/2021011 and 05000446/2021011) and Initial Request for Information IR 05000445/20200052020-09-0101 September 2020 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2020005 and 05000446/2020005) ML20139A1452020-05-18018 May 2020 Notification of NRC Design Bases Assurance Inspection (Programs) (05000445/2020010 and 05000446/2020010) and Initial Request for Information ML20055E1052020-03-0303 March 2020 CP2019006 Annual Assessment Letter ML20045E3512020-02-13013 February 2020 Information Request February 13, 2020 Notification of Inspection and Request for Information Comanche Peak Unit 2 NRC Inspection Report 05000446/2020002 IR 05000445/20190052019-08-30030 August 2019 Updated Inspection Plan for Comanche Peak, Units 1 and 2, Reports 05000445/2019005 and 05000446/2019005 IR 05000445/20180062019-03-0404 March 2019 Annual Assessment Letter for Comanche Peak, Units 1 and 2 (Report 05000445/2018006 and 05000446/2018006) ML19043A9442019-02-20020 February 2019 2019 CP Brq RFI Letter IR 05000445/20180052018-08-31031 August 2018 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2018005 and 05000446/2018005) IR 05000445/20170062018-03-0101 March 2018 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2017006 and 05000446/2017006) IR 05000445/20170052017-08-28028 August 2017 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2017005 and 05000446/2017005) IR 05000445/20160062017-03-0101 March 2017 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016006 and 05000446/2016006) ML16302A1002016-10-27027 October 2016 Notification of Inspection (NRC Inspection Report 05000445/2017002 and 05000446/2017002) and Request for Information IR 05000445/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016005 and 05000446/2016005) IR 05000445/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2016401 and 05000446/2016401) ML16239A2522016-08-31031 August 2016 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016005 and 05000446/2016005) IR 05000445/20150062016-03-0202 March 2016 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2015006 and 05000446/2015006) IR 05000445/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2015005 and 05000446/2015005) IR 05000445/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2015401 and 05000446/2015401) IR 05000445/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2014402 and 05000446/2014402) IR 05000445/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2014006 and 05000446/2014006) IR 05000445/20130012014-03-0404 March 2014 IR 05000445-13-001 & 05000446-13-001, 02/12/2014, Comanche Peak, Units 1 & 2, Annual Assessment Inspection Plan ML13282A5002013-10-0909 October 2013 Notification of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000445-14-008 and 05000446-14-008) and Request for Information IR 05000445/20130062013-09-0303 September 2013 (Report 05000445/2013006 and 05000446/2013006) IR 05000445/20128012013-03-0404 March 2013 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2012801 and 05000446/2012801) ML13060A4352013-03-0101 March 2013 Notification of NRC Component Design Bases Inspection IR 05000445-13-007 and 05000446-13-007, and Initial Request for Information IR 05000445/20120062012-09-0404 September 2012 Mid-Cycle Letter for Comanche Peak Nuclear Power Plant Units 1 and 2 (Reports 05000445/2012006 and 05000446/2012006) IR 05000445/20120012012-03-0505 March 2012 Annual Assessment Letter for Comanche Peak Nuclear Power Plant Units 1 and 2 (Report 05000445/2012001 and 05000446/2012001) ML1124306442011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Comanche Peak Nuclear Power Plant - Units 1 and 2 CP-201101031, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval)2011-08-0202 August 2011 Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval) CP-201101030, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 6, (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2000, Second Interval)2011-08-0202 August 2011 Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 6, (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2000, Second Interval) 2024-08-19
[Table view] Category:Letter
MONTHYEARCP-202400424, (Cpnpp), Core Operating Limits Report (Colr), Unit 2 Cycle 22, (ERX-24-001, Revision 0)2024-11-0404 November 2024 (Cpnpp), Core Operating Limits Report (Colr), Unit 2 Cycle 22, (ERX-24-001, Revision 0) IR 05000445/20240032024-10-30030 October 2024 Integrated Inspection Report 05000445/2024003 and 05000446/2024003 IR 05000445/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000445/2024404 and 05000446/2024404 (Public) IR 07200074/20244012024-10-10010 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200074/2024401 Public 05000445/LER-2024-002-01, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-10-0303 October 2024 Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions 05000446/LER-2024-001-01, Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-09-30030 September 2024 Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications CP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel ML24031A6322024-09-11011 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4), Final Safety Analysis Report Update Schedule (EPID L-2023-LLE-0023) - Letter ML24243A0152024-09-0303 September 2024 – Notification of Comprehensive Engineering Team Inspection (05000445/2025012 and 05000446/2025012) and Request for Information ML24194A1332024-08-28028 August 2024 Issuance of Amendment Nos. 190 and 190, Respectively, Revision to Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24228A2252024-08-22022 August 2024 Relief to Use Later Code Edition for Inservice Inspection Program ML24179A0772024-08-20020 August 2024 Issuance of Amendment Nos. 189 and 189, Respectively, Extension of Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24232A2412024-08-19019 August 2024 Information Request, ISFSI Security IR 2024401 ML24232A2262024-08-19019 August 2024 Information Request, Security IR 2024404 IR 05000445/20240052024-08-15015 August 2024 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2024005 and 05000446/2024005) CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality ML24177A2692024-08-0707 August 2024 Issuance of Amendment Nos. 188 and 188, Respectively, Revision to Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality IR 05000445/20240022024-07-31031 July 2024 Units 1 and 2 - Integrated Inspection Report 05000445/2024002 and 05000446/2024002,and Independent Spent Fuel Storage Installation Inspection Report 07200074/2024001 IR 05000445/20244032024-07-16016 July 2024 Security Baseline Inspection Report 05000445/2024403 and 05000446/2024403 (Full Report) ML24187A0372024-07-15015 July 2024 Withdrawal of Requested Licensing Action Exemption from Select Requirements of 10 CFR Part 55, Operators Licenses ML24192A1862024-07-10010 July 2024 Notification of Inspection (NRC Inspection Report 05000445/2024003 and 05000446/2024003) and Request for Information ML24185A1382024-07-0202 July 2024 Inservice Inspection Request for Information IR 05000445/20244012024-06-26026 June 2024 MC&A Program Inspection Report 05000445-2024401 and 05000446-2024401 Public-Final CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 IR 05000445/20240122024-06-17017 June 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2024012 and 05000446/2024012 ML24120A3632024-06-10010 June 2024 Issuance of Amendment Nos. 187 and 187, Respectively Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants 05000445/LER-1924-002, (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-06-0303 June 2024 (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator 05000446/LER-2024-001, (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-05-13013 May 2024 (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications 05000445/LER-2024-001, Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning2024-05-0606 May 2024 Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning ML24107B1012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cernek, J, Coushatta Tribe of Louisiana ML24120A3062024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Yahola, s, Kialegee Tribal Town ML24120A2952024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Johnson, L.J., Seminole Nation of Oklahoma ML24120A2902024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Bunch, J, United Keetoowah Band of Cherokee Indians ML24120A2932024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Garza, Jr, Juan, Kickapoo Traditional Tribe of Texas ML24120A3002024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Morrow, R K, Thlopthlocco Tribal Town ML24120A2922024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Dotson, Delaware Nation ML24120A2912024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cooper, D, Apache Tribe of Oklahoma ML24120A3042024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Sylestine, R, Alabama-Coushatta Tribe of Texas ML24120A3032024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-SpottedBird, L, Kiowa Indian Tribe ML24120A2942024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Gonzalez, B, Caddo Nation ML24120A2962024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Kaskaske, D, Kickapoo Tribe of Oklahoma ML24120A2972024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Martin, R, Tonkawa Tribe of Oklahoma ML24120A3072024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Yargee, W, Alabama-Quassarte Tribal Town CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters ML24120A3052024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Woommavovah, M, Comanche Nation 2024-09-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION rch 5, 2012
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT UNITS 1 AND 2 (REPORT 05000445/2012001 AND 05000446/2012001)
Dear Mr. Flores:
On February 14, 2012, the NRC completed its end-of-cycle performance review of Comanche Peak Nuclear Power Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, Comanche Peak Nuclear Power Plant Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Comanche Peak Nuclear Power Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green)
safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC identified a cross-cutting theme in the resources component of the human performance cross-cutting area. Specifically, the NRC identified four green findings in the resources component of the human performance cross-cutting area for failure to provide complete and accurate procedures H.2(c). The NRC determined that a substantive cross-cutting issue (SCCI) does not exist because your improvement initiatives and proposed corrective actions appear to provide sufficient scope to address the theme. The NRC will continue to monitor your staffs effort and progress in addressing the theme until the theme criteria are no longer met.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1148 with any questions you have regarding this letter.
Sincerely,
/RA/
Wayne C. Walker Chief, Reactor Projects Branch A Division of Reactor Projects Docket Nos: 05000445, 05000446 License Nos: NPF-87, NPF-89 Enclosure: Comanche Peak Nuclear Power Plant Inspection/Activity Plan cc w/Enclosure: Distribution via ListServe cc w/Enclosure Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Thomas.Blount@nrc.gov)
Senior Resident Inspector (John.Kramer@nrc.gov)
Resident Inspector (Brian.Tindell@nrc.gov)
Senior Project Engineer (David.Proulx@nrc.gov)
Project Engineer (Jason.Dykert@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
RA Secretary (Lisa.Quayle@nrc.gov)
DRA Secretary (Anita.Tannenbaum@nrc.gov)
Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)
Branch Chief, DRS/EB2 (Geoff.Miller@nrc.gov)
Branch Chief, DRS/PSB1 (Michael.Hay@nrc.gov)
Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)
Branch Chief, DRS/OB (Mark.Haire@nrc.gov)
Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)
OEDO RIV Coordinator (Lydia.Chang@nrc.gov)
Director, DIRS, NRR (Fred.Brown@nrc.gov)
Deputy Director, DIRS, NRR (John.Lubinski@nrc.gov)
Director, DORL, NRR (Joseph Giitter@nrc.gov)
Deputy Director, DORL, NRR (Robert.Nelson@nrc.gov)
Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)
NRR Project Manager (Balwant.Singal@nrc.gov)
RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov Congressional Affairs Officer (Jenny.Weil@nrc.gov)
File located: R: _Reactors\EOC 2011\CP EOC Letter 2011.docx SUNSI Review Yes No ADAMS Yes No Reviewer Initials WW Publicly Avail Yes No Sensitive Yes No Sens. Type Initials WW A:DRP/A signature D:DRS D:DRP WCWalker AVegel KKennedy
/RA/ T.Blount for /RA/
2/28/12 2/28/12 2/29/12
Page 1 of 1 Comanche Peak 02/27/2012 14:28:50 Inspection / Activity Plan Report 22 04/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EXAM - INITIAL OPERATOR EXAM 5 1 05/14/2012 05/18/2012 X02484 INITIAL EXAM - UNIT 1 - CP (04/2012)
2 05/14/2012 05/18/2012 X02485 INITIAL EXAM - UNIT 2 - CP (04/2012)
1 06/11/2012 06/23/2012 X02484 INITIAL EXAM - UNIT 1 - CP (04/2012)
2 06/11/2012 06/23/2012 X02485 INITIAL EXAM - UNIT 2 - CP (04/2012)
EB1-17T - 50.59 & PERM PLANT MODS 3 1, 2 03/26/2012 04/06/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 03/26/2012 04/06/2012 IP 7111117T-chng/tst change/test/evaluations 1, 2 03/26/2012 04/06/2012 IP 7111117T-evals evaluations 1, 2 03/26/2012 04/06/2012 IP 7111117T-permmodspermanent mods EP-1 - BIENNIAL EP PROGRAM INSPECTION 1 1, 2 07/16/2012 07/20/2012 IP 7111402 Alert and Notification System Testing 1, 2 07/16/2012 07/20/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 07/16/2012 07/20/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 07/16/2012 07/20/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 07/16/2012 07/20/2012 IP 71151-EP01 Drill/Exercise Performance 1, 2 07/16/2012 07/20/2012 IP 71151-EP02 ERO Drill Participation 1, 2 07/16/2012 07/20/2012 IP 71151-EP03 Alert & Notification System RS12 - RADIATION SAFETY 2 1, 2 10/15/2012 10/19/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/15/2012 10/19/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 10/15/2012 10/19/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 10/15/2012 10/19/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent RS5678 - RADIATION SAFETY TEAM INSPECTION 4 1, 2 12/03/2012 12/07/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 12/03/2012 12/07/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 12/03/2012 12/07/2012 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 12/03/2012 12/07/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB1-21 - COMPONENT DESIGN BASIS INSPECTION 6 1, 2 05/20/2013 06/21/2013 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.