Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2014001 and 05000446/2014001)
ML15063A575
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/04/2015
From: Webb Patricia Walker
NRC/RGN-IV/DRP/RPB-A
To: Flores R
Luminant Generation Co
R. Alexander
References
IR 2014001
Download: ML15063A575 (4)


Text

arch 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2014001 and 05000446/2014001)

Dear Mr. Flores:

On February 17, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Comanche Peak Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections.

The NRC determined that overall, Comanche Peak Nuclear Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Comanche Peak Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to the first unit at each site achieving compliance with the Orders, and will aid staff in development of a Safety Evaluation for the site. The onsite component at your site has been scheduled for the week of April 27, 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1148 with any questions you have regarding this letter.

Sincerely,

/RA/

Wayne C. Walker, Chief Project Branch A Division of Reactor Projects Docket: 50-445 and 50-446 License: NPF-87 and NPF-89 Enclosure:

Inspection Plan

Page 1 of 2 Comanche Peak 02/26/2015 19:45:48 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EXAMS - INITIAL OPERATOR EXAM 5 1 05/04/2015 05/08/2015 X02552 INITIAL EXAM CP UNIT 1(6/2015)

2 05/04/2015 05/08/2015 X02553 INITIAL EXAM CP UNIT 2 (6/2015)

1 06/01/2015 06/15/2015 X02552 INITIAL EXAM CP UNIT 1(6/2015)

2 06/01/2015 06/15/2015 X02553 INITIAL EXAM CP UNIT 2 (6/2015)

ISFSI - ROUTINE LOADING INSPECTION 1 1 04/27/2015 05/01/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EB1-21T - CP COMPONENT DESIGN BASIS INSPECTION 6 1, 2 06/01/2015 07/02/2015 IP 7111121 Component Design Bases Inspection EP-2 - HAB EXERCISE INSPECTION 5 1, 2 06/08/2015 06/12/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/08/2015 06/12/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event EP-3 - EP PERFORMANCE INDICATORS 2 1, 2 06/08/2015 06/12/2015 IP 71151-EP01 Drill/Exercise Performance 1, 2 06/08/2015 06/12/2015 IP 71151-EP02 ERO Readiness 1, 2 06/08/2015 06/12/2015 IP 71151-EP03 Alert & Notification System Reliability TSB 52B - BIENNIAL PI&R INSPECTION 4 1, 2 08/31/2015 09/04/2015 IP 71152B Problem Identification and Resolution 1, 2 09/14/2015 09/18/2015 IP 71152B Problem Identification and Resolution RS 13 PI - RADIATION SAFETY 2 1, 2 10/12/2015 10/16/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/12/2015 10/16/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/12/2015 10/16/2015 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 10/12/2015 10/16/2015 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION 2R15 1 2 10/12/2015 10/23/2015 IP 7111108P Inservice Inspection Activities - PWR EXAMS - INITIAL OPERATOR EXAM 4 1 05/16/2016 05/20/2016 X02572 INITIAL EXAM COMANCHE PEAK UNIT 1 (06/2016)

2 05/16/2016 05/20/2016 X02573 INITIAL EXAM COMANCHE PEAK UNIT 2 (06/2016)

1 06/13/2016 06/17/2016 X02572 INITIAL EXAM COMANCHE PEAK UNIT 1 (06/2016)

2 06/13/2016 06/17/2016 X02573 INITIAL EXAM COMANCHE PEAK UNIT 2 (06/2016)

RS 5678 - RADIATION SAFETY - TEAM 4 1, 2 02/08/2016 02/12/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 02/08/2016 02/12/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Comanche Peak 02/26/2015 19:45:48 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 5678 - RADIATION SAFETY - TEAM 4 1, 2 02/08/2016 02/12/2016 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 02/08/2016 02/12/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EP-1 - BIENNIAL EP PROGRAM INSPECTION 1 1, 2 02/22/2016 02/26/2016 IP 7111402 Alert and Notification System Testing 1, 2 02/22/2016 02/26/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 02/22/2016 02/26/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 02/22/2016 02/26/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EP-2 - EP PERFORMANCE INDICATORS 1 1, 2 02/22/2016 02/26/2016 IP 71151-EP01 Drill/Exercise Performance 1, 2 02/22/2016 02/26/2016 IP 71151-EP02 ERO Readiness 1, 2 02/22/2016 02/26/2016 IP 71151-EP03 Alert & Notification System Reliability RS 12 PI - RADIATION SAFETY 2 1, 2 04/11/2016 04/15/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/11/2016 04/15/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/11/2016 04/15/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 04/11/2016 04/15/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION 1RF18 1 1 04/11/2016 04/22/2016 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.