IR 05000445/2010001

From kanterella
(Redirected from IR 05000446/2010001)
Jump to navigation Jump to search
Annual Assessment Letter - Comanche Peak Nuclear Power Plant (Reports 05000445-10-001 and 05000446-10-001)
ML100620924
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/03/2010
From: Webb Patricia Walker
NRC/RGN-IV/DRP/RPB-A
To: Flores R
Luminant Generation Co
References
IR-10-001
Download: ML100620924 (6)


Text

UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N rch 3, 2010

SUBJECT:

ANNUAL ASSESSMENT LETTER - COMANCHE PEAK NUCLEAR POWER PLANT (REPORTS 05000445/2010001 AND 05000446/2010001)

Dear Mr. Flores:

On February 16, 2010, the NRC staff completed its performance review of the Comanche Peak Nuclear Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs)

for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, Comanche Peak Nuclear Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Comanche Peak Nuclear Power Plant -2-If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8148 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Wayne C. Walker, Chief Reactor Projects Branch A Division of Reactor Projects Docket: 50-445, 50-446 Licenses: NPF-87, NPF-89 Enclosure:

Comanche Peak Inspection/Activity Plan cc w/Enclosure:

Mike Blevins, Chief Operating Officer Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043 Mr. Fred W. Madden, Director Oversight and Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq.

Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 County Judge P.O. Box 851 Glen Rose, TX 76043 Chief Bureau of Radiation Control Texas Department of Health P.O. Box 149347, Mail Code 2835 Austin, TX 78714-9347

Comanche Peak Nuclear Power Plant -3-Environmental and Natural Resources Policy Advisor Office of the Governor P.O. Box 12428 Austin, TX 78711 County Judge P.O. Box 851 Glen Rose, TX 76043 Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78711-3326 Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Chief Boiler Inspector Texas Department of Licensing And Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711 Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76209 Sheriff Somervell County 750 E. Gibbs Blvd.

Glen Rose, TX 76043

Comanche Peak Nuclear Power Plant -4-The Mayor of the City of Glen Rose P.O. Box 1949 Glen Rose, TX 76043 Hood County Judge 100 E. Pearl Street Granbury, TX 76048 The Mayor of the City of Granbury P.O. Box 969 Granbury, TX 76048 Chairman Public Utility Commission William B. Travis Bldg.

P.O. Box 13326 Austin, TX 78711-3326 State Energy Conservation Office Comptroller of Public Accounts P.O. Box 13528 Austin, TX 78711-3528 Director Infrastructure Reliability Division, PUC 1701 N. Congress Ave Austin, TX 78711-3326 Sheriff, Hood County 400 N. Gordon Street Granbury, TX 76048 Deputy Director Office of Permitting, Remediation and Registration TCEQ MC-122 P.O. Box 13087 Austin, TX 78711-3087 State Coordinator Division of Emergency Management Texas Department of Public Safety 5805 North Lamar Blvd.

Austin, TX 78773-4087

Comanche Peak Nuclear Power Plant -5-Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.goV)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)

Senior Resident Inspector (John.Kramer@nrc.gov)

Resident Inspector (Brian.Tindell@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Administrative Assistant (Lucy.Owen@nrc.gov)

DRA Administrative Assistant (Anita.Tannenbaum@nrc.gov)

Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)

Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)

Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)

Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)

Branch Chief, DRS/OB (Mark.Haire@nrc.gov)

OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)

Director, DIRS, NRR (Frederick.Brown@nrc.gov)

Director, DORL, NRR (Joseph Giitter@nrc.gov)

Deputy Director, DORL, NRR (Robert.Nelson@nrc.gov)

Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)

NRR Project Manager (Balwant.Singal@nrc.gov)

RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov Congressional Affairs Officer (Jenny.Weil@nrc.gov)

mortensengk@INPO.org File located: R:\_REACTORS\EOC2009\CP.doc SUNSI Rev Compl. 7 Yes No ADAMS 7 Yes No Reviewer Initials WW Publicly Avail 7 Yes No Sensitive Yes 7 No Sens. Type Initials WW C:DRP/A D:DRS D:DRP C:DRP/Signature WWalker RJCaniano DDChamberlain WWalker

/RA/ /RA/ /RA/ /RA/

2/23/10 2/23/10 2/25/10 2/25/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Page 1 of 1 Comanche Peak 02/18/2010 10:35:40 Inspection / Activity Plan Report 22 04/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EXAM - INITIAL EXAM 3 1 03/29/2010 04/02/2010 X02437 INITIAL EXAM UNIT 1-CP 2 03/29/2010 04/02/2010 X02438 INITIAL EXAM UNIT 2- CP PSB2-08P - INSERVICE INSPECTION - U1 2 1 04/05/2010 04/16/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 1 04/05/2010 04/16/2010 IP 7111108P Inservice Inspection Activities - PWR RP123 - OCCUPATIONAL RADIATION SAFETY 2 1, 2 04/12/2010 04/16/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/12/2010 04/16/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/12/2010 04/16/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 04/12/2010 04/16/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 04/12/2010 04/16/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent EB1-21 - COMPONENT DESIGN BASES INSPECTION 6 1, 2 05/24/2010 06/18/2010 IP 7111121 Component Design Bases Inspection BRQ - OPERATOR REQUAL INSPECTION 3 1, 2 11/29/2010 12/03/2010 IP 7111111B Licensed Operator Requalification Program RS678 - RADIATION SAFETY TEAM INSPECTION 3 1, 2 12/06/2010 12/10/2010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 12/06/2010 12/10/2010 IP 71124.07 Public Radiation Safety 1, 2 12/06/2010 12/10/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 12/06/2010 12/10/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 12/06/2010 12/10/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent EB2-05T - TRIENNIAL FIRE PROTECTION 1 1, 2 01/31/2011 02/04/2011 IP 7111105T Fire Protection [Triennial]

1, 2 02/14/2011 02/18/2011 IP 7111105T Fire Protection [Triennial]

PSB2-08P - INSERVICE INSPECTION - U2 3 2 04/04/2011 04/29/2011 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.