Forwards FEMA Ltr & Final Exercise Rept for 960918 Full Participation Exercise.No Deficiences Noted
ML20138H462
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/24/1996
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Feigenbaum T
NORTHEAST UTILITIES SERVICE CO.
Shared Package
ML20138H466 List:
References
NUDOCS 9701060065
Download: ML20138H462 (3)


Text

. _ _ _ _ _ _ _ _ __ _ _ _

4 December 24, 1996 i

Mr. Ted C. Feigenbaum '

Executive Vice President and Chief Nuclear Officer Northeast Utilities Service Company c/o Mr. Terry L. Harpster P.O. Box 128 Waterford, CT 06385

SUBJECT:

FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) FINAL REPORT OF THE SEPTEMBER 18,1996, FULL-PARTICIPATION EMERGENCY PREPAREDNESS EXERCISE AT SEABROOK STATION

Dear Mr. Feigenbaum:

Enclosed is a letter from Mr. Louis A. Elisa ll, Regional Director for FEMA Region I, dated December 17,1996, transmitting the final exercise report for the September 18,1996, full-participation exercise at the Seabrook Nuclear Power Station.

There were no deficiencies identified during the exercise, and FEMA has concluded that off-site emergency preparedness is adequate to protect the health and safety of the public.

However, 24 Areas Requiring Corrective Action (ARCAs) were identified in New  ;

Hampshire, and eight ARCAs were identified in Massachusetts. We request that your staff

assist the appropriate off-site officials, where possible, to resolve the identified ARCAs

!, prior to the next full-participation exercise, if this has not already been done.

No response to this letter is required. If you have any questions concerning this matter, please contact me at (610) 337-5255.

4 Sincerely, ORIGINAL SIGNED BY:

EDWARD B. KING for Richard R. Keimig, Chief Emergency Preparedness and Safeguards Branch

- Division of Reactor Safety i

a Docket No. 50-443

Enclosure:

1 FEMA Letter dated December 17,1996 and Exercise Report

)

/ )

4 9701060065 961224 PDR ADOCK 05000443 F

{

PDR ~ ~

i

l 1

Ted C. Feigenbaum 2 cc w/o encl:

B. D. Kenyon, President - Nuclear Group D. M. Goebel, Vice President - Nuclear Oversight i F. C. Rothen, Vice President - Work Services J. K. Thayer, Vice President - Recovery Officer, Nuclear Engineering & Support Officer i H. F. Haynes, Director - Nuclear Training i

B. L. Drawbridge, Executive Director - Services & Senior Site Officer A. M. Callendrello, Licensing Manager - Seabrook Station W. A. DiProfio, Nuclear Unit Director - Seabrook Station R. E. Hickok, Nuclear Training Manager - Seabrook Station L. M. Cuoco, Senior Nuclear Counsel W. D. Meinert, Nuclear Engineer l D. C. McF.thinney, RAC Chairman, FEMA RI, Boston, Mass.

R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire S. Choi, D; ector, Nuclear Safety, Massachusetts Emergency Management Agency

} F. W. Getrran, Jr., Vice President and General Counsel - Great Pay Power J Corporation Commonwealth of Massachusetts, SLO Designee R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts Seacoast Anti-Pollution League State of New Hampshire, SLO D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States l

Ted C. Feigenbaum 3 Distribution w/enci:

Region 1 Docket Room (with concurrences)

D. Screnci, PAO Nuclear Safety Information Center (NSIC)

PUBLIC DRS File Distribution w/o encl:

W. Dean, OEDO P. McKee, PD l-3, NRR A. DeAgazio, PD l-3, NRR R. Correia, NRR (RPC)

R. Frahm, Jr., NRR (RKF)

D. Screnci, PAO, ORA Inspection Program Branch, NRR (IPAS)

J. Rogge, DRP NRC Resident inspector E. Conner, DRP C. O'Daniell, DRP J. Laughlin, DRS DOCUMENT NAME: G:\EP&SB\LAUGHLIN\SBFEMALT.96 Ts receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure 'E" = Copy with attachment / enclosure *N' = No copy 0FFICE RI/DRS j RI/DRS , l, l l l NAME JLaughlinS/,'fL RKeimig &(.._-46 DATE 12/24/96 12/A /96 12/ /96 12/ /96 12/ /96 0FFICIAL RECORD COPY