Notice of Violation from Insp on 960827-1021.Violation Noted:Temporary Change to Transient Response Implementation Plan Procedure T-103,secondary Containment Controls & Other Procedures Were Not Reviewed & Approved by Manager
ML20135B081
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/15/1996
From: Ne R1
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20135B067 List:
References
50-352-96-07, 50-352-96-7, 50-353-96-07, 50-353-96-7, NUDOCS 9612040158
Download: ML20135B081 (1)


Text

I l

ENCLOSURE 1 NOTICE OF VIOLATION PECO Energy Docket Nos. 50-352, 50-353 Limerick Nuclear Generating Station License Nos. NPF-39, NPF-85 Units 1 and 2 During an NRC inspection conducted on August 27 through October 21,1996, a violation of NRC requirements was identified, in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:

Technical Specification 6.8.3.c. requires, in part, that temporary changes to procedures be reviewed and approved by the Director or Manager designated by  ;

administrative procedures as the responsible Director or Manager for that procedure i within 14 days of implementation.

I Contrary to the above, a temporary change to transient response implementation '

plan procedure T-103, Secondary Containment Controls, and several other )

associated procedures implemented on August 25,1996, was not reviewed and '

approved by the Director or Manager designated by administrative procedures within 14 days of implementation.  !

l This is a Severity Level IV' violation (Supplement 1).  !

The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence and the date when full compliance was achieved is already adequately addressed on the docket in inspection Report No. 50-352/353 96-07, dated November 15,1996. However, you are required to submit a written statement or explanation pursuant to 10 CFR 2.201, if the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to respond, clearly mark your response as a " Reply to a Notice of Violation," and send it to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region j 1, and a copy to the NRC Resident inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

Dated at King of Prussia, PA this 15th day of November 1996 9612040158 961115 ,