IR 05000352/1999301

From kanterella
Jump to navigation Jump to search
NRC Operator Licensing Exam Repts 50-352/99-301 & 50-353/99-301 Administered on 990312-19 (Administration & 990322-26 (Grading).Exam Results:Five RO & Four SRO Applicants Were Administered Exam.One RO & One SRO Failed
ML20206H847
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/30/1999
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20206H833 List:
References
50-352-99-301, 50-353-99-301, NUDOCS 9905120033
Download: ML20206H847 (120)


Text

{{#Wiki_filter:(: i-

      ;
      )

i

'

L: U. S. NUCLEAR REGULATORY COMMISSION l REGION 1 i l-  !

      !

l Docket Nos: 50-352, 50-353 Report Nos: . 50-352/99-301, 50-353/99-301 ! l Licensee: PECO Nuclear i l i Facility: Limerick Units 1 and 2 Location: Sanatoga, PA Dates: March 12-19,1999 (Administration) March 22-March 26,1999 (Grading) Examiners: Steve Dennis, Operations Engineer, Chief Examiner under Instruction i

      '

Herb Williams, Senior Operations Engineer, Chief Examiner Carl Sisco, Operations Engineer Approved By: Richard J. Conte, Chief Human Performance and Emergency Preparedness Branch Division of Reactor Safety l rp= 9905120033 990430 PDR ADOCK 05000352 V PDR

I

      .

EXECUTIVE SUMMARY Limerick Generating Station Examination Report No. 50-352,353/99-301

Operations l e Five RO applicants and four SRO applicants were administered initial licensing exams.

One SRO applicant failed the written test but passed all other portions of the exam. One RO applicant failed the category B operating test but passed all other portions of the exam. All other applicants successfully passed all portions of the exam.

. e Positive observations were noted on the simulator test in the area of communications and teamwork. However, three of nine applicants exhibited unsatisfactory individual knowledge of the reactor automatic depresssurization system indicating a potential problem in the initial operator program.

i e Overall, the as-submitted examination material was acceptable with some exceptions.

Five of 125 written exam questions required revision due to either being too easy or not evaluating at the appropriate licensed level. Additionally, the operating test contained one JPM out of 20 which was also too easy and required replacement. Facility personnel subsequently incorporated changes in the final exams. Post-exam facility comments reflected needed technical corrections for five of the written exam questions, and also indicated a lack of thorough review on those questions by the facility during the examination preparation phase.

e The facility used an examination preparation team of experienced instructors who assisted the NRC examiners in an exceptional manner.

ii

I

      :

l Report Details Operations 06 Operator Training and Qualifications 05.1 Reactor Ooerator and Senior Reactor Ooerator initial Exams a. Scope The NRC examiners reviewed the written and operating initial examinations submitted by the facility staff to ensure that they were prepared and developed in accordance with the guidelines of the " Examination Standards for Power Reactors"_ (NUREG-1021, interim Revision 8). The review was conducted both in the Region 1 office and at the Limerick training facility. The NRC examiners administered the operating portion of the exam to all candidates. c The written exams were administered by the facility's training organization.

b. Observations and Findinos Gradino and Results The results of the exams are summarized below: SRO RQ Pass Fail Pass Fail  ; i Written 3 1 5 0 Operating 4 0 4 1 Overall 3 1 4 1 The facility provided post-examination comments reflected technical corrections to five of j the written exam questions. The NRC accepted four of the comments and revised the answer key accordingly. The changes indicated also a lack of thorough review on those questions by the facility during the exam preparation phase. Attachment 1 is the NRC l staff resolution of facility post-examination comments (Attachment 2).

Examination Preoaration and Quality The written exams, job performance measures (JPMs) and simulator scenarios were developed by the facility using the guidelines of the examination standards. The exam development team was comprised of training and operations representatives. All individuals signed onto a security agreement once the development of the exam commenced. The NRC subsequently reviewed and approved all portions of the q proposed exams. '

I i

Five of 125 written exam questions required revision due to either being too easy or not evaluating at the appropriate licensed level. The operating test contained one JPM out I of 20'which was replaced also due to being too easy. In response to the written and I operating test comments, facility personnel subsequently incorporated changes in the final exams.

The facility used an examination preparation team of experienced instructors who j assisted the NRC examiners in an exceptional manner, Written Test Performance l The facility training department performed an analysis of questions missed on the written exam for generic weaknesses. The facility noted seven examples where four of the applicants missed the same question. The training staff subsequently determined the quedions met the guidance of NUREG 1021, Appendix B, and were technically . accurate. Facility staff stated they would review these questions with the applicants.

i This action was determined to be acceptable.

Operatina Test Administration and Performance l The applicants demonstrated good communications and teamwork during the simulator l !: exercises in both the routine and emergency portions of the exercise. Briefings were routinely conducted by the applicants when in the control room supervisor position. The briefings were well controlled and ensured that all personnel knew the plant (simulator) status. One RO applicant failed the category B operating portion of the exam and all other applicants performance were acceptable.

I One question on the operating test dealing with the reactor automatic depressurization system (ADS) was missed by three applicants out of nine. This question failure rate indicated a potential problem with the initial operator program dealing with knowledge of the ADS logic for opening the ADS valves. This issue was discussed with the licensee and they agreed to review the area, c. Conclusions Five RO applicants and four SRO applicants were administered initial licensing exams.

One SRO applicant failed the written examination but passed all other portions of the exam. One RO applicant failed the category B operating examination but passed all other portions of the exam. All other applicants successfully passed all portions of the exam.

Positive observations were noted on the simulator test in the area of communications and teamwork. However, three of nine applicants exhibited unsatisfactory individual knowledge of the reactor automatic depresssurization system indicating a potential problem in the initial operator program.

I L

,

Overall, the as-submitted examination material was acceptable with some exceptions.

Five of 125 written exam questions required revision due to either being too easy or not evaluating at the appropriate licensed level. Additionally, the operating test contained one JPM out of 20 which was also too easy and required replacement. Facility personnel subsequently incorporated changes in the final exams. Post-exam facility

- comments reflected needed technical corrections for five of the written exam questions, and also indicated a lack of thorough review on those questions by the facility during the examination preparation phase.-

The facility used an examination preparation team of experienced instructors who assisted the NRC examiners in an exceptional manner.

08 ' Miscellaneous Operations issues During a review of the candidates' applications, the examiners determined that: 1) the candidates had performed the required number of significant reactivity control manipulations; 2) the candidates met eligibility guidelines of NUREG 1021 and Reg.

Guide 1.8 as applicable; and 3) the licensing basis documents for eligibility requirements (i.e., the Quality Assurance Plan, Technical Specifications, the Final Safety Analysis Report, and the licensed operator program requirements as accredited) were consistent.

The licensee is committed to ANSI /ANS 3.1-1978.

The eligibility requirements of one senior reactor operator instant (SROI) applicant were ; reviewed. With the assistance of the NRC program office regarding the acceptance of military reactor operator experience to fulfili experience requirements, the NRC staff ,

' determined that the eligibility requirements were met for the SROI in question.

X1 Exit Meeting Summary On March 19,1999, exam-related observations were discussed with the manager of Operations Training. The NRC expressed appreciation for the cooperation and assistance that was provided during both the preparation and exam week by the licensee's examination team.

There were no observed discrepancies between the simulator and the plant. Therefore, simulator fidel?y was not discussed at the exit meeting or in this report.

, Attachments: 1. NRC Resolution of Facility Comments 2. Facility Comments on the Written Examination 3. RO Written Exam w/ Answer Key 4. SRO Written Exam w/ Answer Key

Attachment 1 - NRC RESOLUTION OF FACILITY COMMENTS SRO/RO #54 l Summary of Facility Comment The question asked which SRV's were available for pressure control given the conditions that the Unit 2 remote shutdown panel (RSP) was manned due to a fire in the MCR, high ' - drywell pressure existed, and Division 3 DC power was lost.

The facility stated that the question stem did not discriminate between automatic pressure control (overpressure lift setpoint reached) or manual pressure control.

Additionally, the facility stated, if the candidate assumed automatic pressure control,' then instrument air backup would not be required for any SRV's. Consequently, the facility recommended accepting either "a" or "c" as the correct answer.

Resolution of Facility Comment The NRC staff agreed with the facility's comment that, if the candidate assumed l automatic pressure control, SRV's are operable at their respective overpressure lift setpoints. The setpoint for the "N" SRV is 1170 psig. This SRV has controls at the remote shutdown panel. The other SRVs listed have a higher setpoint and some are not , controlled at the remote shutdown panel. With the reactor shut down, the heat removal capacity of the "N" SRV exceeds the decay heat load, and would be the controlling SRV in the automatic mode of operation. This would make answer"a" correct. If only manual controlis assumed, answer"c"is correct. Therefore, NRC staff accepted answers "a" and "c".

SRO/RO#58 Summarv of Facility Comment I The question asked why the Recirc pumps are required to be tripped during a loss of instrument air.

The facility provided the basis document for the loss of instrument air off-normal procedure, ON-199 Rev.14. The procedure stated that, upon the loss of instrument air, recire pump seal purge and motor airspace cooling will be lost; and, therefore, the recirc pumps must be tripped per procedure step 2.6.1. Consequently, the facility recommended accepting either "a" or "c" as the correct answer.

Resolution of Facility Comment The NRC staff accepted the facility's comment and revised the answer key to accept answers "a" and "c" as correct because the facility training staff provided a technical basis to support the recommendation.

__

Attachment 1 (Cont'd) NRC Resolution of Facility Comments RO #94 Summary of Facility Comment The question asked the MCR response to an alarming overhead a'nnunciator caused by an ongoing l&C test. Specifically, the performance of Main Steam Line Flow H gh channel B calibration functional test (ST-2-041-425-2) caused overhead annunciator ? MAIN STEAM LINE Hi FLOW" to alarm.

The facility stated that operations procedure OM-L-7.1, step 5.1.2, indicates that it is at ' the operator's discretion to permit non-operators to acknowledge MCR alarms, in which case, answer "c" is correct. The procedure also states an exception to this step in which only licensed personnel shall be permitted to acknowledge alarming RPS annunciators.

The " MAIN STEAM HI FLOW " trip units provide a Group 1 isolation signal which results in a RPS trip signal. Because of this relationship, a RO who treats the this alarm in the same fashion as an RPS alarm is taking reasonable and conservative action. Therefore, answer "a" is also correct.

Resolution of Facility Comment The question asks what is the _" required MCR response." In this case, the alarming annunciator is not a RPS alarm (defined as an overhead alarm tile with a RED triangle in the corner) and, therefore, by procedure can be acknowledged by other non-operations personnel with RO concurrence (answer"c"). While the RO is taking reasonable and conservative action by treating the main steam line alarm in the same fashion as a RPS alarm, it is NOT a requirement that only the RO be permitted to acknowledge the alarm (answer "a"). By procedure, the alarm may still be acknowledged by the l&C technician with RO concurrence, making answers "a" and "c" mutually exclusive. Therefore, the NRC staff denies the facility comment and accepts answer "c" as the only correct answer.

RO#96 Summary of Facility Comment The question asked to describe the status of core alterations if the refuel bridge has lost communications with the MCR RO while removing a bundle from the core.

The facility stated that the question stem did not stipulate at what point in the fuel movement sequence the communications failure occurred. Therefore, answer "d," that stated " core alterations must be suspended immediately and the bundle must not be raised or lowered," would also be correct, if the candidate assumed the failure occurred I just after grappling the bundle in the core.

i

Attachment 1 (Cont'd) NRC Resolution of Facility Comments Resolution of Facility Comment The NRC staff accepted the facility's comment and revised the answer key to accept answers "b" and "d" as correct because the facility training staff provided a procedural basis to support the recommendation.

RO #98 Summarv of Facility Comment The question asked to describe the action to be taken after exiting a posted contamination area and observing during a whole body frisk that your highest reading was 120 cpm above background readings.

The facility stated that an additional correct answer would be to reperform the frisk, and if readings are unchanged, contact HP. This answer, as well as the original correct answer, is supported and described in procedure HP-C-818-1, Whole Body Frisking Method. Therefore, answers "b" and "d" are correct.

Resolution of Facility Comment The NRC staff reviewed Exhibit HP-C-818-1, Rev.4. A note at the top of procedure HP-C-818-1 and steps E. and F. suppo-t answer "b." Therefore, the NRC staff accepted the facility's comment and revised the answer key to accept answers "b" and "d" as correct.

Attachment 2 FACILITY COMMENTS ON THE WRITTEN EXAMINATION l l l

' l

. James O. von Suskil  j Vic2 President   i Limetic.k Generating Staten PECO NUCLEAR    esco ene,g, comnee, 2300 A Unit of PECO Energy    $s"13 7 Sanatoga. PA 19464-o92o 61o 718 300o / Fax 610 718 3008 Pager 1800 672 2285 #o271 Internet address. jvonsuskrs'peco-energy com 10CFR55.57 March 24,1999 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 Mr. Hubert J. Miller, Regional Administrator U. S. Nuclear Regulatory Commission Region 1 475 Allendale Road  -

King of Prussia, PA 19406 SUBJECT: Limerick Generating Station Written Examination Comments Dear Mr. Miller.

The NRC Initial License Written Examinations administered on March 12,1999 at the Limerick j Generating Station were overall comprehensive and thorough. Your organization's cooperation I and assistance during development was beneficial for ensuring a fair and reliable evaluation  ! instrument. ,

Attached are the facility comments to selected questions. These comments are being submitted using the guidance of NUREG 1021, ES-402, to clarify areas where attemative answers may be l considered. References are attached to support the recommendations.

] If there are any questions conceming these comments, please contact Mr. Pete Orphanos at l (610)18-4010.  !

        !

Sincerely, Enclosure j

        !

l

        !

I l i

5:

-

1 I QUESTION: 54 (RO/SRO) l Unit 2 Remote Shutdown' Panel is manned due to a fire in the MCR.

- Drywell pressure: 2.5 psig

 - DIV 3 DC power lost
 -

WHICH ONE of the following states available pressure control? . a. "2A", *2C", or "2N" SRV b. "2S", "2M", or "2K" SRV c. "2A", "2C", or "2N" SRV only after instrument Air backup d. "2S", "2M",' or "2K" SRV only after Instrurnint Air backup ANSWER: C q

       "

REFERENCE: LLOT-0120 FACILITY RECOMMENDATION: Accept A or C as correct JUSTIFICATION: With a high drywell pressure condition present, all SRVs are still operable for automatic pressure control at the respective overpressure lift setpoints. The question does not specify that the candidate must discriminate between automatic or manual; both of which are available pressure 3 control modes. The "C," "A," and *N" SRVs are associated with the RSP. They will be available for j automatic pressure control prior to Instrument Air backup, and automatic and manual control after 2 Instrument Air backup.

REFERENCE ATTACHED TO SUPPORT FACILITY RECOMMENDATION:

 . LGS Technical Specifications LCO 3.4.2 1-
       !

I

       :

JtEACTOR C00UNT SYSTDI

       : l 3 /4.4.2 SAFETY / RELIEF VALVES   3W U  I LIMITING CO E ITIGN FOR OPERATION 3.4.2 The safety valve function of at least 11 of the following reactor coolant system  i safety / relief valves shall.be OPERABLE with the specified code safety valve function lift  :

settings:*f  ! 4 safe relief valves 01170 t15 5 safe relief valves 0 1180 215 , . 5 safe m11ef valves 01190 115 APPLICABILITY: OPERATIONAL CO W ITIONS 1, 2, and 3.

EIIM: a. With the safety valve function of one or more of the above required safety / relief valves inoperable, be in at least'HDT SHUTDOW within 12 hours - and in COLD SHUTDOW within the uext 24 hours.

b.

With one or more pool average watersafety t / relief valves stuck openratureislessthan105'f,providedthats close the stuck open safety / relief valve if unable to close the stuck open valve minutes or if suppre(s) ss on pool average water temperature is 110{s) F orwithin 2 greater, place the reactor mode switch in the Shutdown position.

c. With one or more safety / relief valve acoustic monitors inoperable, restore the inoperable acoustic monitors to OPERABLE status within 7 days or be in at least I HOT SWTDOW within the next 12 hours and in COLD SWTDOW within the following 24 hours. l SURVEILLANCE REQUIREMENTS , 4.4.2.1 The acoustic monitor for each safety / relief valve shall be demonstrated OPERA 8LE i with the setpoint verified to be 0.20 of the full open noise leve1## by performance of a:  ; a. CHAMEL FUNCTIONAL TEST at least once per 92 s, and a j b. CHANNEL CALIBRATION at least once per 24 months . l 4.4.2.2 At least 1/2 of the safety relief valves shall be removed, set pressure tested and reinstalled or replaced with spares that have been previously set pressure tested and stored in accordance with manufacturer's recommendations at least once per 24 months, and they shall be rotated such that all 14 safety relief valves are removed, set pressure tested and reinstalled or replaced with spares that have been previously set pressure tested and stored in accordance with manufacturer's recommendations at least once per 54 months. ,

* The lift setting pressure shall correspond to ambient conditions of the valves at nominal rating temperatures and pressures.
    • The provisions of fication 4.0.4 are not applicable provided the Surveillance ormed within 12 hours after reactor steam pressure is adequate to fu the test.
  1. Up to 2 i le valves may be replaced with spare OPERABLE valves with i lower set ats until the next refueling
       '
## Initial setting shall be in accordance with the manufacturer's recommendation. Adjustment to the valve full open noise level shall be accomplished during the startup test program. l
       !

I LINERICK - UNIT 1 3/4 4-7 Amendment No. 56,70,7f,106 FE812 996 , s b> CW l po- (L P a ,p ~

       '

t l

       :

nen , e s . . . s ., , , , . . . . . . ..... . .. .. . ... . _

-
*

PECD Nuclear Limerick Training Center 34114egview Read , Unfield.PA 19444 1 Date ]$

.
-an .~ .. - -   -_

Yh j [Ll& &W fh&MOf

     -  --

maclear Trainia, sootaan , _ Mail Code LTC 1/1 Phone Phone ' FaxPhone (610) 718- 4 0 / O Fax Phone (610) 718-4028 CC: O urgent groryour review O Reply ASAP O Please comment VES T7OA) 00 A4 MAk'71)/3

  -
       -sy

APRL W *WW 14: 00 eMUn Lit sxHamsmo Lnen av sootooco rnoc.vuv vuu ... i

       '

y QUESTION: 54 (RO/SRO) Unit 2 Rernote Shutdown Panelis manned due to a fire in the MCR.

+. Drywell pressure: 2.5 psig

 . DIV 3 DC powerlost
' WHICH ONE of the following states available pressure control?

a. *2A", *2C', or *2N' SRV b. *2S". *2M*, or *2K" SRV

 '

c. *2N, MC", or *2N' SRV only after instrutnent Air backup d. *2S", *2M*, or *2K* SRV only after instrument Air backup

       ,

ANSWER: C REFERENCE: LOT-1563 FACILITY RECOMMENDATION: Accept A or C as correct JUSTIFICATION: Under the given conditions, SRVs 'A,* 'C," and *N* are operable for automatic (pressure) actuabon and will be ope.rable for manual operation from the Remote Shutdown Panel (RSP) after restoration of pneumatics. The question provides no restriction on the mode of pressure control to be consdered, and A or C is correct.

SRVs "S," "H," and *M* are also operable for pressure actuaten; however, choices "B," and *D* are incorrect for the following reasons 1. The stem of the question restricts the candidates' responses to those SRVs associated with the RSP. Only SRVs *A." *C," and *N* are associated with and indicate at the RSP, 2. The setpoet for the *N" SRV is 1170 psig and the setpont for the *S,""H," and *M" 4 SRVs is 1180 psig. With the reactor shut down, the heat removal capacity of the "N* SRV (870,000 LB/hr or 5.8%) exceeds the ex.WM decay heat load, it will lift and reduce pressure; preventing the *S,Q* and *M* SRVs from controlling pressure, and 3. Procedure SE-1. * REMOTE SHUTDOWN * stipulates in Step 4A.1 that the "A," *C," and 'N' SRVs ane the mode of pressure control.

~~ Choices "N and 'C' are the only correct answers.

REFERENCE ATTACHED TO SUPPORT FACILITY RECOMMENDATION: SE-1, * REMOTE SHUTDOWN * Sechon 4A - PRESSURE CONTROL P&lD M41, Sheet 6, Table ll - Unit 2 SRV Setpoints LGS UFSAR Table 5.2-2. SRV Sepoints and Capacities

       $$

F- ,, r m o ao ... . . , . . , . . . . . . . . . . . . . . . . . . . . . _ _ _ _ . _ _ . _ _ . .. ... ___

.

I REACTOR PRESSURE CONTROL SE-1, Rav. 43 < ' Paga 13 of 44 1

.

l RCB/DFP/ALC:eer l 4.4 REACTOR PRESSURE CONTROL

 ~4.4.1 Manually OPERATE the following Main Steam Relief Valves (SRVs) to
.

control Reactor pressure between 990 to 1096 psig:

  -

PSV *F013A

  -

PSV *F013C

  -

PSV 'F013N 4.4.2 ff SRVs fail to operate, THEN REFER TO SE-1-1, Protected Depressurization Control (Long Term Gas Supply). *

.
        .
 .
       .
      %

i I q <v

nrn , , , , . . , . . . . . . . . . .. ....... .. .. ...... .. .... . .

.
*

LGS UFSAR w Table 5.2-2

    .

EUCLEAR SYSTER SAFETY / RELIEF VALVE SBTPOINTS

 '

ASME RATED CAPACITY SPRING SET AT 103% REFERENCE No. OF PRESSURE PRESSURE OF 1090 psig VALVESUI (Dsia) (Ib/hr eachi _ l 4 - 1170 870,000 _ l- S 1180 870,000 l 5 1190 870,000 l l l W Five of the SRVs serve in the automatic depressurization l function.

l

*
       ;
     ~

um., Rev. 5 4/96

- - - .

RPR 14 'WW lulWW :PkVM Lib ikHtN!Nu 'N'" 8V 3Jd'3d'* ""*'** **J TAati !- SArETYMIELMF VALVES Ase ASSOCIATED E0tartoff UICAT10N Ase SUFFIX A553Coa a Llet kust O N - ass N*M gT g,

        ,_

A gj3g lfh IAT003 SF036A IN004A C1259 - 185A-3 1:5A-2 tt5A 195s2 s , 8 IF0138 lhg tes006 Citit 1158-1 154-2 1158 195121 1 C ir ist l$$ IC7003 w03sc IN004C Ct272 itsc-t i15C-2 9ISC iAssts , D tFoi30 l[$$ 1as004 C1273 1150 1 150-2 150 is5 sat i A g[,3g l[$$ 1ET003 IF036E tas004E Citre i15E-1 liSE 2 tu inst 21 , B trotsr ll$$

 -

IN004F

    -

Cl275 stSF-1 ItSF-2 IISF 16512 I C W0tsc {l$$ IN004G C1276 115c-1 1150-2 15C IA$ste r 0 glim ll$ 18ff003 IF03GN 110004H Cl2TT tl5H-1 Il5H-2 IISM LASS 21 L A WotM jp$h 18eD04J C1278 Il5J-l stSJ 2 815J 185921 s 3 gl,3g lh$$ IET003 WO36E tts004E Cl2TS IISK-1 It5st 2 ttSE 18532 t

 @ C Wol3L ll${  1se004L C12a0 itSL-t itsL-2 insa, lAS$21 i O3 0 pf,3g lp05W leff003 IF036W tea 004W Cttel it$W-l stSM-2 1tSes SASS 2s (

A S,.. --- - 3 gf,, l[0 4WT005 lF03Ges tes004N C1282 815D6-l 19586-2 ttSN 16S$21 s C - O gg,39 jf0 151003 IF0345 144004$ C1293 1155-1 1155-2 1955 1AS528 I e flELIEF VALVES FOR AUTOWATIC DEPflES$tatIZAT30N SYSTEW (ADS). VALVES EJUL.ns.S O CONTOL Petov10ED IN fD80TE SeeJTDosef SYSTEW FOR VALVES A.C as TABLE II TABLE III VALVE PIE 55URE STEAM FLDs INSTRUWDfTATIond LisE

 ,   SETTING WS LINE 'A' 'B' T* 'O'

SET fELIEF PelESS. VALvt t*0CA 135 -139 -143 -147 (PSICs tFos3 f*0CA-136 140 -144 -148 1870 W f* 0CA-137 -841 -t45 -849 stao OE.Kae.5 i.0CA t34 -842 -14G -150 lt30 A.B.Cf C TA8LE IV TA8LE V

  . . . . . . . . . . . . . . . . . ~ . . . . . . . . . ~ . . . - . - - - -

r-

- QOESTION: 58 (RO/SRO)

Recirc pumps are required to be tripped during a loss of Instrument Air

       .

WHICH ONE of the following states the basis for this action? a. loss of Recirc M-G set winding cooling b. loss of Recirc M-G set oil cooling c. loss of Recirc pump sealcooling

'

d. loss of Recirc pump oil cooling ANSWER: A - REFERENCE: ON-119, " LOSS OF INSTRUMENT AIR * FACILITY RECOMMENDATION: Accept A and C as correct

' JUSTIFICATION:

Following a loss of instrument Air, the Recirc Pump Seal Stage Control Valves HV-46 *15 A(B) fait closed. The purpose of the seal stage flow is to maintain the seals cleaned and cooled. Without seal stage flow, the seals are operating with degraded cooling. Both A and C describe valid reasons to shut down the Recirc pumps.

REFERENCE ATTACHED TO SUPPORT FACILITY RECOMMENDATION: P&lD M-46

~ LGS Design Basis Document DBD L-S-19 I

h

'

l ON-119 BASES, Rav.14 Page 1 of 13 l DJD/RCB/BJL/ALC:eer PECO Nuclear LIMERICK GENERATING STATION

.ON-119 LOSS OF INSTRUMENT AIR - BASES cu-1    i 1.0 SYMPTOMS 1.1 Both Instrument Air Header low pressure alarms.

BASIS Both Instrument Air Header. Iow pressure annunciators alarming (*18-B(C)-2) indicates 1 that both the *A and *B Instrument Air Headers are less than the alarm setpoint of 85 psig. Air systems redundancy has failed to maintain at least one source of Instrument I Air at normal pressure to critical plant valves and instrumentation. Consequently, plant stability is threatened.

1.2 Scram pilot air header low pressure alarm.

BASIS This alarm (*08-D-5) is indicative of a low Instrument Air header pressure. Pressure is sensed downstream of a pressure control valve which reduces normal Instrument Air pressure to 70 to 75 psig. 'This alarm annunciates at 65 psig.

2.0 OPERATOR ACTIONS, 2.1 -lE any of the follow'.ng compressors are not running, THEN START thom:

-
 *A Ins'trument Air Compressor   l
-
 *B instrument Air Compressor
-

Service Air Compressor BASIS These compressors should be running and loaded (automatically) at receiver pressures less than 97 psig. A compressor not running may be a failure to auto start, and a manual start could restore Instrument Air pressure.

i

l ON-119 BASES, Rsv.14 Page 2 of 13 l DJD/RCB/BJL/ALC:cer 2.2 MONITOR the following instrument air pressure indications:

-

PI-15 *20A, "* A instrument Air Header Pressure" (PX), at *0C655

-

PI-15 *208, "*B Instrument Air Header Pressure" (PX), at *0C655 BASIS Pressure indicators PI-15 *20A(B) indicate instrument air pressure downstream of the instrument air dryers and are indicative of actual pressure on the instrument air header.

- Computer point G500 (C*130), "*A Instrument Air Receiver Lower Pressure"

-

Computer point G501 (C*131), "*B instrument Air Receiver Low Pressure" BASIS G500 and G501 change from NORMAL to LO at 80 psig as measured at the instrument air receivers. . These computer points can help determine if the loss of instrument air is resulting from a problem with the instrument air dryers or the instrument air compressor.

2.3 JE both PI-15 *20A, " Instrument Air Header Pressure Indicator" (PX), AND PI-15 *20B " Instrument Air Header Pressure Indicator" (PX), at *0C655 are less than 85 psig, THEN PERFORM the following: 2.3.1 REDUCE reactor power per Reactor Maneuvering Shutdown Instructions to less than 45%. BASIS Reducing reactor power will reduce feedwater flow rate and provide the feed pump control system greater margin to maintain adequate feed to the reactor should feed pump or condensate pump minimum flow valves start to drift open on low instrument operating air pressure. Also, a reactor scram, should it occur, would be a less severe transient when initiated at a lower reactor power.

l' ON-119 BASES, Rev.14 Page 3 of 13 l DJD/RCB/BJL/ALC:eer 2.3.2 MONITOR control rod positions for inadvertent inward drifting via Control Rod Position Report AND ROD DRIFT (*08-F-4) alarm.

2.3.3 E control rods drift, THEN manually SCRAM the reactor AND PLACE Mode Switch in " SHUTDOWN" AND ENTER T-100, SCRAM.

BASIS Low Instrument Air pressure could cause CRD HCU scram valves to drift open, resulting in the associated control rods to insert. Operation at power with an abnormal rod pattern could result in a highly undesirable core power distribution.  ; 2.3.4 MONITOR reactor water level AND reactor feedwater flow for possible loss of feedwater due to condensate /RFPT min. flow valves failing open.

BASIS The condensate pump minimum flow valve and the reactor feed pump minimum flow j valves fail open on a loss of operating air. Should any of these valves drift open while at I high power, a loss of feed in excess of feed system reserve capacity could result.

l I 2.3.5 E reactor water leve! drops, THEN ENTER OT-100 l AND EXECUTE concurrently.  ! t BASIS l OT-100, Reactor Low Level, gives the immediate operator actions for low reactor water j level.

2.3.6 MONITOR feedwater string operation for loss of feedwater heating.

BASIS l

      '

The dump valves associated with the feedwater heaters fail open on a loss of operating air. Should any of these valves drift open, feedwater heating would be reduced, and increased feed subcooling could elevate core thermal power above the 100% load line. ; i

l l ON-119 BASES, Rev.14 Page 4 of 13 l DJD/RCB/BJL/ALC:eer 2.3.7 lE feedwater heating is lost QB partially lost, I THEN ENTER OT-104 AND EXECUTE concurrently.

BASIS OT-104, Unexpected / Unexplained Reactivity insertion, gives the immediate operator  ! actions for a reactivity insertion resulting from a loss of feedwater heating.

2.3.8 MONITOR condenser vacuum for possible loss of vacuum.

BASIS The steam jet air ejector steam supply pressure control valves and air ejector discharge (recirc to the condenser) pressure control valves fail open on a loss of operating air. The level control valves associated with the offgas preheater, after condenser, and hold-up pipe drains fail closed. Should any of these valves drift to their failed position, condenser vacuum could be adversely affected.

2.3.9 IE condenser vacuum drops, j THEN ENTER OT-116  ! AND EXECUTE concurrently.  ! SASIS OT-116, Loss of Condenser Vacuum, gives the immediate operator actions for loss of condenser vacuum.

'"

',
      '
'1 .'  : <

WARNING < L  : o

 '
  ,
      ' ~  ' l
        '
' ^    '  '
-
 ,
 -
  ,
  ,,
  ,
   , , , ,
    , ,,'> ,
       .
       ,
        '
,With Service Air header isolated from the Service Air compressor,, Backup Service Air   i must be ^e veitable to the affected Unit to' ensure a continued supply of breathing air   j AND'to' refuel floor seals. , >
   ,, ,
    , ,,
    '
     ,
     ,
      -
      , .
     ',{
    ,     '
    ,<  s'
  '
     ,
 , ,
 '
  ~ > , i >  s' ' '
       ' +>  7 2.4 ENSURE Backup Service Air is in service AND can supply the affected Unit Service Air header.

BASIS Service Air header will be isolated from the Service Air compressor on a low Instrument 1 Air condition. Backup Service Air should be in service and selected to the appropriate Unit so that air will be supplied to users such as breathing air and fuel pool inflatable seals, hN

p l ON-119 BASES, Rsv.14 Page 5 of 13 l DJD/RCB/BJL/ALC:eer 2.5 DISPATCH operator to: 2.5.1 VERIFY TECW cooling water available to compressors which will not start N remain loaded.

AN_Q BASIS A loss of compressor cooling is the most likely source of compressor trouble.

2.5.2 MONITOR *A(B) Instrument Air Dryer prefilter A_NQ after filter differential pressures at *0C130A(B).

2.5.3 JE 'A(B) Instrument Air Dryer prefilter QB after filter differential pressures are greater than 5 psid, THEN PLACE appropriate standby filter in service per S15.6.E BASIS Clogged air dryer filters could be at fault. Valving into service the standby filters takes relatively little time.

2.5.4 CLOSE 15 *042, " Service Air Comp Air Receiver Outlet" (328-T1-217/357-T5-217).

BASIS Both Instrument Air receivers less than 70 psig should cause the automatic Service Air header isolation valve to close, dedicating the output of the Service Air compressor to the Instrument Air system. Should a fault exist downstream of the automatic isolation valve and that valve not fully close, Service Air system capacity as a backup source of air could be degraded.

lps9

l ON-119 BASES, Rav.14 Page 6 of 13 l DJD/RCB/BJL/ALC:eer NOTE 1. Following step assumes Service Air was backing up "A" instrument Air Header at time of pressure loss.

2. E Service Air was backing up "B" instrument Air header, THEN 15 *009A, " Service Air To "A" Inst Air Tie Viv," would be closed AND 15 *0098, " Service Air To "B" Inst Air Tie Vlv," would be opened.

2.5.5 E Service Air compressor is still operating AND both Instrument Air headers are depressurized, THEN PERFORM the following: 1. CLOSE 15 *009A(B), " Service Air To A(B) Inst Air Tie Viv" (328-T1-217/357-T5-217).

2. OPEN 15 *009B(A), " Service Air To B(A) Inst Air Tie Viv", in an attempt to repressurize the header (328-T1-217/357-TS-217).

I BASIS ] in the case of a failure of B(A) Instrument Air compressor and a coincident failure of A(B) j

. Instrument Air header (i.e. line break), it would be appropriate to isolate Service Air to !

the A(B) header and to valve it into the B(A) header. l

2.5.6 E Service Air compressor discharge pressure is greater than Instrument Air compressor discharge pressures, THEN OPEN 15 *027, " Service Air to Inst Air Tie Viv" (328-T1-217/357-T5-217).

BASIS Service air pressure should not be significantly greater than Instrument Air header pressure since the Service / Instrument Air header cross-tie check valve augments Service Air to the instrument Air header. However, if the cross-tie check valve was to malfunction (not open), Service Air pressure could be greater than Instrument Air pressure. Only in this situation should the cross-tie check valve be bypassed to restore the backup air supply to instrument Air.

I l l l

     @ 57
      )
      $

I l ON-119 BASES, Rev.14 i Page 7 of 13 ) l DJD/RCB/BJL/ALC:eer j i a '

 '- <

M (C OTIOff sp

   
 ~
 :

lik jdopardizingian%persiir!g}OhitMsuppipingjiistr'ume6 fair 1to$ lie:odipOhin '

     '
,. f ainuldLbe>,avoidedh ,
   , >
    ,

2. :lE the instrument Air problern has been identified'

'

l c j' , AN12 the' operating Unit will D91 be' adversely affected by cross ^conne6tionh

    ,

THEN the following step should be used/ , '

'
    .

l

   &
  '
  >
   :' "
    ,s, ,  j
      !

2.5.7 E Instrument Air pressure has not been re-established  ; AND the other Unit's Instrument Air system is available, j THEN CROSS CONNECT Instrument Air between Units 1 and 2 as ] follows: l 1. MONITOR operating Unit Instrument Air system during cross j connection efforts.

2. ENSURE 15-0563A, "A Inst Air Hdr To & From Unit #2 Turbine Area Stop Valve" (277-T9*200), AND 15-0563B, "B Inst Air Hdr To & From Unit #2 Turbine Area Stop Valve" (277-T9*200), open.

3. Slowly OPEN 15-0100A, " Unit 1 To Unit 2 Inst Air A Hdr Tie Valve" (258-A8-200), AND 15-01008, " Unit 1 To Unit 2 Inst Air B Hdr Tie Valve" (258-A8-200). j 4. E operating Unit Instrument Air system performance is degraded, THEN TERMINATE cross connection efforts.

BAS!S If all previous efforts to restore Instrument Air have failed, cross connection between the two Units may be considered. The possible adverse consequences to the non-affected

Unit need to be carefully considered prior to cross connecting air systems. An operating Unit could be inadvertently tripped or otherwise unfavorably affected. The malfunction in the affected Unit air system must be identified and understood prior to considering this corrective action. Slowly opening cross connection valves while monitoring the non affected Unit air system performance should allow termination of the evolution if significant pressure losses or other non-desirable events occur.

kN

p l ON-119 BASES, Rev.14 Page 8 of 13 l DJD/RCB/BJL/ALC:eer 2.6 lE pressure can an.t be restored to either Instrument Air header, THEN COMMENCE rapid plant shutdown per GP-4. 1 BASIS ' The plant cannot operate indefinitely without proper pressure present in at least one of the two Instrument Air headers. Should the determination be made that instrument Air cannot be restored, the plant should be shutdown in a controlled fashion before Instrument Air loss degrades plant systems in a random unpredictable manner.

2.6.1 WHEN all control rods are inserted per GP-4, THEN TRIP both reactor recirculation MG sets.

BASIS The,drywell chilled water system shuts down, and the reactor recirculation pump mechanical seal purge supply isolation valves fail closed on a loss of Instrument Air. The i reactor recirc pumps are not needed when the reactor is shut down and should not be l operated without seal purge and motor airspace cooling. Also, the turbine building i

      !
- ventilation system shuts down on a loss of Instrument Air. This, in turn, would cause the reactor recirculation MG sets to trip on high air temperature.

l

I i n l l f 5Y

l ON-119 BASES, Rev.14 Page 9 of 13 l DJD/RCB/BJL/ALC:eer NOTE MSIVs may begin to drift closed. )

      !

l 2.6.2 lE Main Condenser can no_t be maintained as a heat sink, THEN PERFORM the following: 1. CLOSE inboard AND outboard MSIVs.

2. ENSURE HV-41 *F016, " Main Stm Line Drain inboard PCIV" (STEAM DRAINS INBOARD), AND HV-41 *F019, " Main Stm Line Drain Outboard PCIV" (STEAM DRAINS OUTBOARD), closed at *0C601. l 3. ENTER T-101 for reactor vessel pressure l AND level control.

BASIS The main condenser is not a maintainable heat sink without Instrument Air. The auxiliary boilers become inoperable, the offgas system drain valves fail closed, and the mechanical vacuum pump suction isolation valve fails closed on a loss of instrument Air. Isolating reactor pressure vessel steam protects the main turbine, condenser and associated auxiliary systems by forcing decay heat to be deposited in the suppression pool where the energy can be dissipated by systems not dependent upon Instrument Air.

! l l l

o

l ON-119 BASES, Rev.14 Page 10 of 13 l DJD/RCB/BJL/ALC:eer NOTE Placing RECW in service to cool the Drywell will violate primary containment integrity.

2.6.3 SECURE Drywell Chilled Water per S87.2.A ANQ CONSIDER placing RECW in service to cool the Drywell per S13.6.D.

BASIS I The Drywell Chilled Water System will shut itself down on a loss of Instrument Air and so should be secured in a controlled fashion. RECW backup to DWCW may be able to be placed in service, however, primary containment will be violated. (Ref. 3.3.2) 2.6.4 MONITOR secondary containment pressure.

2.6.5 lE Reactor Enclosure HVAC isolates, THEN PERFORM the following: 1. ENSURE SGTS maintain: secondary containment pressure at least negative 0.25 inches of water pressure.

2. lE secondary containment pressure can not be maintained THEN ENTER ON 111-ann EXECUTE concurrently.

BASIS Reactor building ventilation supply and exhaust dampers fail closed on a loss of instrument Air, tripping their respective fans. The recirculation and standby gas treatment systems should still function to maintain proper negative secondary containment pressure. The operator should monitor secondary containment pressure to ensure pressure is controlled within Technical Specifications requirements. ON-111, Loss Of Secondary Containment, provides the operator actions in the event secondary containment pressure can not be maintained.

l ON-119 BASES, Rev.14 Paga 11 of 13 l DJD/RCB/BJL/ALC:eer 2.6.6 MONITOR following levels l AND TAKE manual action, as necessary, to control level.

l

 -

RECW Head Tank

 -

TECW Head Tank j l BASIS The automatic makeup valves for these tanks fail closed on a loss of Instrument Air, j

 -

Main Condenser Hotwell BASIS The coarse and fine condensate makeup and reject valves all fail closed on a loss of Instrument Air.

- Condensate Storage Tank l BASIS The Condensate Storage Tank (CST) makeup isolation valve fails closed. Additionally with the condensate makeup and reject valves failing closed, if a condensate pump is in service, CST level could actually rise if a reject valve leaks by.

2.6.7 MINIMlZE evolutions that discharge water to Radwaste.

BASIS The radwaste processing systems are inoperable without instrument Air. Any water collected by the drain collection systems will accumulate in the Floor Drain Collection Tank, the Equipment Drain Collection Tank, and the Chemical Waste Tank. Unnecessary depletion of the available storage capacity of these tanks is undesirable.

2.6.8 _ SECURE Auxiliary Boilers per S21.2.A.

BASIS The Auxiliary Boilers will shut themselves down on a loss of Instrument Air and so should be secured in a controlled fashion.

t

     $W

- l ON-119 BASES, Rev.14 Page 12 of 13 l DJD/RCB/BJL/ALC:eer 2.6.9 MONITOR Reactor Pressure.

2.6.10 jf Reactor begins to depressurize due to the SSE main steam supply valves PV-C-07 *52 A_Np_ PV-C-07 *53 failing open THEN CLOSE HV-07 *50.

BASIS The Steam Seal Evaporator main steam supply valves PV-C-07 *S2 and PV-C-07 *S3 fail open on a loss of air. The Reactor may depressurize through the SSE and through the main steam supply pressure relief valves PSV-07 *51 A(B)(C)(D)(E)(F). Closing HV-07 *50 will isolate main steam from the SSE and prevent Reactor Depressurization.

I l

      !

l

c: l. ON-119 BASES, Rev.14 Page 13 of 13 l DJD/RCB/BJL/ALC:eer 3.0 REFERENCES 3.1 . TECHNICAL SPECIFICATIONS i NONE 3.2: INTERFACING PROCEDURES 3.2;1 GP-4, Rapid Plant Shutdown To Hot Shutdown 3.2.2 ON-111, Loss Of Secondary Containment 3.2.3 OT-100, Reactor Low Level  ;

      !

3.2.4 OT-104, Unexpected / Unexplained Reactivity insertion 3.2.5 OT-116, Loss of Condenser Vacuum 3.2.6 S13.6.D, RECW Operation With Loss of Drywell Chilled Water 3.2.7 S15.6.E, Placing Standby Instrument Air Dryer Prefilter/Afterfilter in Service-3.2.8 S21.2.A, Shutdown of an Auxiliary Boiler 3. 2. 9 -' S87.2.A, Normal Shutdown Of The Drywell Chilled Water System 3.2.10 T-100, SCRAM 3.2.11 T-101, RPV Control 3.3' OTHER 3.3.1 CM-1 SOER 88-01, Rec. #1, T01785 3.3.2 NCR 94-00254 Os1

              -
   -   .     -
.
 -
   -
    - . . . . . . .
               .
. 4  I  3  . 2  (  e  I
-               ;

t,, utsk 7 ~_3 pm,;;'  ::.:.

      ' -
        . :: :---
         -- =
          ::=.===.=. T'
            :=.
            "~"~~

i

  "~"

i y, *

      / . ==.:-==.= .,,.:.-. . =. -  , =.....':..-..   -

i l

  <>i    'E=513i:.EE"'"   J :'.= == =.==.
  .

ul

  :

A4---).A.

< ' ' '

       "Jr=== "=.-   ==::. == = rwa
 .. t_..__..-.ej nl  . t ".2" ".".".".". ".I' ".   :: . .=:- "" ~ ~
              -

_ =;..=: /r- - -- _ . . . - . =,.. . :..:.::;.=..:::

           .

j y , .,... . . .. .uj .- .~,== -..-- .-

           .  . - . .
               ;

I

.
 .nI4i
  *** <m y J:  l
    ' '   .
       '
          -:::: :r= :==::.T.=
          ====:.;'.=====:?    .
               ;

j c e 'A ,  ; gg , l *=,am,a. van.

_

          ..
          .=/#.."."~.:~-iE:":iLi!" -
             -
  .. - ... n .
               ! n c;;g
. -  k w
  .
  ~     ._ ,
              .
               ,
       .= m. w :-

A- - .u . . o. .

         .

n,, qas .- r

     .i- *ci      .

" ..s.x.nts -

          ,, -.
..L.g        '.nW.#  1
            . .
            '
        -

Wy~4 Ge Ty ,_ P". .u 'e4 kx _ y._ __, - 0;"-

     .        -
           ._   i !

1-4 - ser-A _g ,.

        '
       . .. . . .
        . .

i p =: *- g i .

        *
             *
         -
     {h  t-
       - wq
        =----
          ,f
               ,

gg g F c FM, q.

.

             .

l

               -

_

     . 4...1g        !

.. . _ ... .. a ,

          ,.   , ,  ,

. . _ =. _ _ .

 . _ ,. .m, #..- a  _i.x, .
        -.      ,
               ,
        .,
         -
          ._  .

.. , __ - . -- *m .,

       .

_ _ _ 3 a, _ m_ -

           ."i
 ,  ;i
    -- r_s -   r
        .- ,- ,,   .HI
           ..

_ A *

     $~
=

s.=_. .. m Bl: i

    +  -.
     :-
      .i h__....W  . . __i
  ,a . .            1

_ s_n

        .

,. m

. . ..-

t - 4 gge a.a . _

    ._. 4  o _

_ _ _ . . _

             .
   ,  r. M  ..M         ,

I 3r -f

    ... ,

i

      . r- d %. __ _ ,;
      -
      -
        -
             .

i I

   $ ' th:  -   .
         ,
              .

l 4 8*

         "

h Er - -. . . . .-.zat7:t'"- - =.!i*

             ,,. ,
              *
 .
 ......$  :
         -

Q%EA'RILtr.r . E.

'-

   == ;1 ,

i c-. , x . m -

    ,
    " ,P *- '     _ murm.t.mn..

d

   ,

WCHANICAl, l

    '
     .  ,, ,.,   C017811 ADB Dit Pale.9AalAIC * Past A
   . 1
      . _ g'
     -
    "'       - u ...: -
          ".lll ; = l A ; = =.A*..' ".".  .
             '
          -  -  1
;  4
  ' ' '

5 4t f I 0F 1 8031-W-46 E 42 l 3 ' 2 I e CafEGORY Al]

..

^

m

,

QUESTION: 94 (RO) l&C testing is being performed Main Steam Line Flow High channel B calibration functional (ST-2-041-425-2) is in progress Expected alarm * MAIN STEAM LINE Hi FLOW' annunciates WHICH ONE of the following describes the required MCR alarm responses to this testing? a. only the unit RO is permdted to acknowledge this alarm .

, b. only the PRO is permitted to acknowledge this alarm c. I&C is permitted to acknowledge this alarm with RO concurrence d. l&C is permitted to acknowledge this alarm without RO concurrence ANSWER: C -

REFERENCE: OM-L-71," ALARMS AND INDICATIONS" FACILITY RECOMMENDATION: Accept A and C as correct JUSTIFICATION: OM-L-7.1 Step 5.1.2 indicates that it is at the Operator's discretion to permit non-operations individuals to acknowledge MCR alarms. The MAIN STEAM HI FLOW trip units provide a Group i MSIV isolation signal which will result in a RPS trip signal. Both RPS and MSIV logic testing requires manual reset by the RO. A RO who treats this key alarm in the same fashion as RPS alarms is taking reasonable and conservative action.

REFERENCE ATTACHED TO SUPPORT FACILITY RECOMMENDATION:

 * OM-L-7.1, " ALARMS AND INDICATIONS' Step 5.1.2 l

l

      .
      'l
- _ _ - _ _ -_ _ _. _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - - _ _ - -

OM-L-7.1, Rev. 1 Page 4 of 8 DAN:hdp S.0 MCR ALARM RESPONSE DURING TESTING

- 5 .' 1 The responsible MCR' Operator shall:

1. Know when alarms will actuate due to testing.

2. ' Grant' permission (at'the Operator's ' discretion) for the
 . acknowledgement / reset of MCR annunciators to non-Operations personnel and ensure adherence to thesefatated guidelines.

-EXCEPTION: Only Licensed personnel shall be permitted to acknowledge alarming RPS annunciators.

5.2 Both the responsible Operator and the test performer shall jointly and independently verify that the respective alarming annunciators to be acknowledged / reset are associated with the respective test.

NOTE: Responsibilities for non-Operations test performers are included in this'Section for MCR Operator awareness.

'5.3 MCR Operators should enforce the following requirements: 1. The test performer should not impair the Operator's communication pathway (i.e., test performer wears headset over one ear only, etc.). 2. Non-Operations personnel performing tests in the'MCR shall: a. Discuss expected annunciator response and request permission for the acknowledgement / reset of MCR annunciators prior to the commencement of the respective test. <<T00848>> b. Receive verbal' concurrence from the responsible Operator prior to any respective test manipulations resulting in an RPS actuation- (i .e . , causing a half scram), c. Communicate impending alarms (raise arm) immediately prior to (preferred) or coincident with (acceptable) annunciator alarm receipt associated with the respective surveillance tests. <<T00848>> d.- Receive concurrence from the responsible Operator prior to.the acknowledgement / reset of any MCR annunciator.

e. Inform the responsible Operator of alarming annunciators not associated with the respective test. Testing shall not continue until authorized by the responsible Operator.

f. . Inform the responsible Operator of any annunciators not associated with the respective test which clear during associated resets.

l l .. .-

'
         $k
.

QUESTION: 96 (RO) - Unit 1 is in OPCON 5 with Core Alterations in progress The Refuel Bridge has lost communication with the RO while removing a bundle from the core.

WHICH ONE of the following desenbes the status of core alterations? a. may continue at the discretion of the Fuel Handling Director b. must be suspended after the bundle is placed in a safe location c. may continue if the RO monitors fuel movement via the Refuel Floor video equipment d. must be suspended immediately and the bundle must not be raised or lowered ANSWER: B REFERENCE: FH-105, " CORE COMPONENT MOVEMENT-CORE TRANSFERS" FACILITY RECOMMENDATION: Accept B or D as correct JUSTIFICATION: The question stem does not stipulate at what point in the fuel movement sequence (grapple in core to un-grapple in fuel pool) the failure occurs. This information is relevant as follows: e if the communications failure occurred just after grappling in the core or seating in the fuel pool, then the appropriate action is to stop all motion and not raise the bundle (canr.ot be lowered), and D is correct.

  • If the communications failure occurred with the bundle hanging from the grapple between the core and fuel pool, then the appropriate action could be to maintain the current position or to continue to the fuel pool, and B or D is correct.

The action of placing a bundle in the safe condition does not exclude halting all bridge and mast movement and awaiting further direction. In comparing the actions in B and D for the given scenario, there are no adverse consequences for the additional restrictions imposed in D, and both B and D are correct.

REFERENCES ATTACHED TO SUPPORT FACILITY RECOMMENDATION: a FH-105, " CORE COMPONENT MOVEMENT-CORE TRANSFERS"

. LGS Technical Specifications LCO 3.9.5

l

REFUELING OPERATIONS 3/4.9.5 COMUNICATIONS LINITING COMITION FOR OPERATION 3.9.5 Direct communication shall be maintained between the control room and refueling floor personnel.

APPLICABILITY: OPERATIONAL CONDITION 5, during CORE ALTERATIONS.* ACTION: l When direct communication between the control room and refueling floor - personnel cannot be maintained, immediately suspend CORE ALTERATIONS.* l SURVEILLANCE REQUIREMENTS 4.9.5 Direct communication between the control room and refueling floor personnel shall be demonstrated at least once per 12 hours during CORE ALTERATIONS.*

*Except movement of control rods with their nonnal drive system.

LINERICK - UNIT 1 3/4 9-7 Amendment No. 109 FE8 0 21996 6 16

I l FH-105, Rev. 26 Page 17 of 25 WFB:wfb 8.0 LIMITATIONS AND ACTIONS 8.1 Difficulties in handling fuel shall be treated as described in Refueling Bridge Operating Procedure S97.0.M, (Ref. 2.5).

Manual operation of refuel platform hoist, when necessary to maintain refuel platform in a safe condition, shall be performed in accordance with Operating Procedure S97.0.L )

(Ref. 2. 6) . l 8.2 LIMITATION TO CONTINUED CORE ALTERATIONS i

NOTE l Suspension of CORE ALTERATIONS shall not preclude completion of movement of a component to a safe position.

8.2.1 IF failure of a DOUBLE VERIFICATION is BIscovered, THEN Core Alterations shall be terminated AND Shift Management, NMD Management and Reactor Engineering shall be notified. (Ref. 2.12) a. Review LR-C-10 and Ensure interim corrective actions are taken prior to resuming Core Alterations 8.2.2 IF communications are lost between the control room and the refueling floor, THEN terminate core alterations until communication is restored. (T.S. 3. 9. 5) 8.2.3 IF the source range monitors as required by Tech Spec. 3.9.2 become inoperable, THEN suspend all core alterations until the SRM's are restored to service.

8.2.4 IF two or more IRMs fail in one channel, THEN terminate core alterations unless a full scram signal is present AND the IRMs are in the Trip Condition.

8.2.5 IF a fuel assembly or single fuel rod is dropped or damaged, THEN terminate core alterations AND perform the applicable steps of ON-120.

Permission to continue fuel handling operations shall be obtained from the operations - Senior Manager.

& $b'

,

'
      !

QUESTION: 98 (RO) After exiting a posted Contamination Area, you perform a whole body frisk.

- Background Readings are 350 cpm 1

- ' Highest reading during whole frisk 470 cpm WHICH ONE of the following describes the action to be taken?

a. continue with assigned work b. reperform frisk, if readings are unchanged, contact HP .

. c. change scrubs, reperform frisk, if readings remain unchanged continue work l d. move to an area of lower background, taking measures to contain any contamination, reperform frisk.

ANSWER: D REFERENCE: HP-C-818 ) FACILITY RECOMMENDATION: Accept B or D as correct JUSTIFICATION: To remain in this area is to minimize the likelihood of contamination spread and will result in promptly obtaining HP assistance. The action to remain in the area is also supported by procedure HP-C-818-1, *WHOLE BODY FRISKING METHOD" as follows: 1. Note at the top of Page 1 2. Step *F" Both B and D describe sound, reasonable, and permitted actions.

REFERENCES ATTACHED TO SUPPORT FACILITY RECOMMENDATION: e HP-C-818, PERSONAL CONTAMINATION MONITORING, DECONTAMINATION, AND REPORTING 1

. .HP-C-818-1,"WHOLE BODY FRISKING METHOD" i
*

Effcctivo Datos Exhibit HP-C-818-1, Rev. 4 Page 1 of 1 WHOLE BODY FRISKING METHOD Contact Health Physics if personal or clothing contamination is suspected, or if there are problems with equipment or background.

' IMPORTANT A. A proper whole body frisk should take a minimum of two minutes.

B. Verify the equipment is within calibration, has had proper pre-operational checks, and is operating on the X1 scale.

C. The background reading should be less than 300 cpm.

Preliminary surveys may be performed in an area 2300 cpm prior to transit to a <300 cpm background area.

D. Hold probe approximately 1/2 inch from surface being surveyed and move probe slowly (@ 2 inches per second).

E. If an increase in count rate is noted, return the probe to the spot.

F. If count rate increases to greater than 100 counts'above background using an HP-210 probe or equivalent or greater than 5000 dpm using-a 100 cm probe, remain in area and notify

Health Physics.

RECOMMENDED SURVEY HIERARC1"l: 1. Survey hands ~(both sides) before picking up probe.

2. Proceed to survey in the following recommended order: a. Head and hard hat (pause at mouth and nose) b. Neck and shoulders c. Arms (pause at each elbow) d. Chest and abdomen e. Back, hips, and, seat of pants f. Legs (pause at each knee).

g. Shoe bottoms (pause at sole and heel) h. Shoe tops i. Dosimetry 3. Carefully return probe (face up or side for next person) and leave area.

.rc HP-C-818, Rev. 5 l Page 5 of 11 I b. If the background is above acceptable limits for the l

instrument used, the individual should perform a { i

 . preliminary frisk of hands and feet. If contamination I is suspected, take appropriate measures to contain the !

contamination, and move to an area of lower background and complete whole body monitoring.

-7.2 HEALTH PHYSICS RESPONSE TO SUSPECTED CONTAMINATION 7.2.1 When notified of a suspected personnel contamination, a Health Physics technician shall promptly assist the worker in verifying whether contamination is present. . Attachments l HP-C-818-8, 9, 11, and 12, Alarm Response Flow Charts,

* provide guidance for dispositioning a suspected contamination.

7.2.2 Attempt to determine the potential source of the contamination; interview the individual on topics such as: 1. Medical procedures; l 2. Work areas and routes traveled; 3. Activities performed by the individual; 4. Area conditions such as leaks or degraded equipment.

7.2.3 Attempt to verify if contamination is internal or external.

1. Use a frisker, or equivalent; survey affected area (s), a. If external contamination is present, it shall be quantified using a field monitoring instrument.

b .- Only ANSI 3.1 qualified individuals may determine that contamination is not present and approve release of workers.

2. If the WBM alarms for the foot, shin, or lower body zone, frisk the shin / lower pants leg and top of shoe.

3. If internal contamination is suspected, notify HP Supervision and proceed to Section 7.4.

4. Require whole body counts as specified in HP-C-628.

7.2.4 Determination of contamination due to short-lived activity (ie. half-life s 2 hrs.)

' l 1. Contaminations due to Short Lived Activity shall not be considered a PCR.

kk

.   ._ _ _ _ _
   - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ -

HP-C-818, Rev. 5 Page 4 of 11 i 7.0 PROCEDURE l 7.1 PERSONNEL CONTAMINATION MONITORING 7.1.1 Contaminated Area Exits:.A whole body monitor (WBM) or field monitoring instrument should be located as near as practical to each contaminated area exit.

7.1.2 Radiologically Controlled Area (.R CA) Exits 1. A WBM (s) and/or a field monitoring instrument (s) shall be located at the approved exits from the Power' Block RCA.

2. Satellite RCA Exit (Non Power Block) - Monitoring should be performed in accordance with the posted instructions at each area. Satellite RCAs (i.e., not connected to the Power Block), such as the New Fuel Storage Yard and R/W Storage Pad at LGS and the South Yard at PBAPS, are exempt from monitoring upon exit if all radioactive materials are contained.

7.1.3 Protected Area Exit: Gamma whole body monitor (s) and a field monitoring instrument (s) and monitoring instructions shall be located at the guard house exit from the protected area.

7.1.4 Personnel Contamination Monitoring l 1. Individual's entire body shall be monitored.

2. Instructions should be posted at the WBM to provide guidance on the monitoring method and to reinforce the individual's responsibility to contact Health Physics when contamination is suspected. Exhibit HP-C-818-1, Whole Body Frisking Method, and Exhibit HP-C-818-2, WBM Instructions, are provided as examples.

3. When a WBM is available: a. If an individual alarms a whole body monitor, then another attempt shall be made.

b. If an individual receives a second alarm, then HP shall be notified.

4. If a WBM is not available: i a. If individual is performing a whole body frisk and suspected personnel contamination is detected, then HP shall be notified,

 ..
 ..

hN

I

i I Attachment 3 RO WRITTEN EXAM W/ ANSWER KEY l l I

 !
 !

i i

 !
 !

I j l

 .

I

 )

l

 !
 )

_.

l l l

 << EXAM INFORMATION >>
.

EXAM NO.: ROWRITTEN DATE GENERATED: 02/11/99 TOTAL POINTS: 100.00 RESPONSE TIME (min): 0.0 AVERAGE DIFFICULTY : 1.9 MULT. CHOICE TRUE FALSE ESSAY FILL IN MATCHING QUESTIONS:100 QUESTIONS: 0 QUESTIONS: 0 QUESTIONS: 0 QUESTIONS: 0 POINTS:100.00 POINTS: 0.00 POINTS: 0.00 POINTS: 0.00 POINTS: 0.00

PAGE: 1 EXAM: ROWRITTEN 1) *PV:1.0 Reactor power ic 32% LT-47 *N012D SDV level transmitter fails upscale resulting in a B2 half scram.

WHICH ONE of the following describes the resulting position of the SDV vent and drain valves.

a. ALL SDV vent and drain valves open b. ALL SDV vent and drain valves closed c. Inboard vent and drain valves open, outboard vent and drain valves closed.

d. Outboard vent and drain valves open, inboard vent and drain valves closed.

2) PV:1.0 A total loss of Instrument Air occurs.

Plant conditions are as follows:

-

All scram valves are open with reactor power at 28%

-

LI-48-1R601 on 10C603 SLC tank level reads 0 inches

-
" STANDBY LIQUID TANK HI/LO LEVEL" alarm annunciates
-
" STANDBY IIQUID TANK LO-LO LEVEL" alarm not lit WHICH ONE of the following describes the response of the SLC system.

a. All SLC pumps are tripped on low level and will not start b. All SLC pumps will start 118 seconds after RRCS is initiated c. A & B pumps will start 118 seconds after RRCS is initated.

C SLC pump is tripped on low level and will not start.

d. C SLC pump will start 118 seconds after RRCS is initiated.

A & B pumps are tripped on low level and will not start.

PAGE: 2 EXAM: ROWRITTEN 3) PV:1.0 Plant conditions are as follows:

-

A loss of offsite power has occurred for both units

-

D12, D14, and D21 busses are de-energized WHICH ONE of the following describes the loops of RHR that can be placed in Suppression Pool Cooling? a. 1A and 2A b. 1A and 2B c. 1B and 2A d. 1B and 2B 4) *PV:1.0 A chemical spill results in the following indications:

"A" and "C" Toxic Gas monitors tripped
"A" and "D" Control Enclosure Chlorine monitors upscale WHICH ONE of the following describes CREFAS status?

a. will remain in standby, no CREFAS fan running b. will automatically initiate only "A" CREFAS, with "A" CREFAS fan running c. will automatically initiate only "B" CREFAS, with "B" CREFAS fan running d. will automatically initiate both "A" and "B" CREFAS, both fans running

PAGE: 3 EXAM: ROWRITTEN 5) PV:1.C Plant conditions are as follows:

-

Reactor Level is +35"

-

DIV 3 LOCA signal (-129") was initiated 10 minutes ago due to an excess flow check valve actuation

-
"C" RHR pump is in full flow test for PMT WHICH ONE of the following would result in an automatic initiation of ADS after 105 seconds?

a. RPV level drops below +12.5" l b. "A" RHR pump is started ' c. RPV level drops below +12.5" and "A" RHR pump is started d. RPV level drops below +12.5" and "B" RHR pump is started 6) *PV:1.0 WHICH ONE of the following identifies the parameter held constant by the HPCI Flow Controller when operating in " MANUAL" mode as reactor pressure changes? a. discharge flow b. control valve position c. turbine speed i d. discharge pressure

_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _- PAGE: 4 EXAM: ROWRITTEN 7) PV:1.0 t

" Unit 1 plant conditions are as follows:
-

D13 bus is locked out

-

RFV level is -140"

-

RPV pressure is 230 psig WHICH ONE of the following describes the status of "A" Loop Core Spray? a. Not injecting, A and C pumps running on min flow b. Injecting approximately 3000 gpm c. Not injecting, A and C pumps off d. Injecting approximately 6000 gpm 8) *PV:1.0 Unit 1 plant conditions are as follows:

-

Reactor Pressure 300 psig

-

Reactor Level -25 inches

-

Drywell Spray is in service using "1A" RHR pump

-

HV51-1F017A is closed in " MANUAL OVERRIDE" The RPV pressure input signal to 1A RHR valve logic fails to 1100 psig WHICH ONE of the following describes the response of the 1A RHR System? a. HV51-1F017A re-opens, " MANUAL OVERRIDE" light lit b. HV51-1F017A re-opens, " MANUAL OVERRIDE" light out c. HV51-1F017A remains closed, " MANUAL OVERRIDE" light lit

      '

d. HV51-1F017A remains closed, " MANUAL OVERRIDE" light out ! _

l PAGE: 5 EXAM: ROWRITTEN l 9) *PV:1.0 l l

     ,

Unit 1 plant conditions are as follows:

-
"DIV 1 STEAM LEAK DETECTION" alarm lit due to high temperature in RCIC room    .
-
"DIV 3 STEAM LEAK DETECTION" alarm not lit  1
-
"RCIC STEAM LINE HI FLOW" Alarm lit due to steam flow greater than 300% of rated WHICH ONE of the following describes the expected status of the RCIC
 ~

l Isolation Valves? l HV49-1F007 HV49-1F008 (RCIC Steam Line (RCIC Steam Line Inboard Isolation) Outboard Isolation) a. open open b. open closed c. closed open d. closed closed i I i i

     !
     .

i I

PAGE: 6 EXAM: ROWRITTEN 10) *PV:1.0 The plant is in OPCON 2 performing startup IRM's on range 5 reading between 40 and 60 The SRM's are being withdrawn from the core with the following readings: SRM: A B C D CPS: 120 86 118 109 WHICH ONE of the following describes plant status? SRM RETRACT PERMIT Licht ROD OUT BLOCK a. on yes l b. off yes j l c. on no ) d. off no 11) PV:1.0 l

     '

During steady state operation at 50% power, 8 LPRM's fail downscale.

WHICH ONE of the following describes the effect on core thermal power P-1 calculations? ,

a. will abort and not run b. will indicate less than actual power c. will indicate actual power d. will indicate greater than actual power

PAGE: 7 EXAM: ROWRITTEN 13) *PV:1.0 The plant is operating at 100% power One RWCU filter /demin is removed from service.

RWCU remains in service at the same flowrate with 2 pumps, 1 filter / demin, and the DEMIN BYPASS (HV-44 *F044) throttled.

WHICH ONE of the following describes the trend on reactor water conductivity? a. remain at the current value b. drop and stabilize at a lower value c. rise and stabilize at a higher value d. rise continually until the second filter /demin is restored 13) *PV:1.0 Unit 2 is operating at 65% power during a power ascension.

RCIC is operating in Full Flow test for surveillance testing.

Feedwater Level Control is selected to Automatic 3-element control.

"2B" Reactor Feed Flow transmitter fails upscale.

WHICH ONE of the following is a problem associated with continued operation in this condition? a. excessive "2A" RFP flow b. reduced Recirc Pump NPSH c. RFP suction header vibration d. unplanned RCIC high level shutdown

PAGE: 8 EXAM: ROWRITTEN l 14) *PV:1.0 The plant is operating at 95% A leak occurs on the "A" recirc loop.

"A" recirc pump is shutdown and isolated.

Reactor level dropped to -50" and is stabilized at +30" 5 minutes later.

WHICH ONE of the following describes the status of seal purge flow to the recirc pumps? A Recire Pumo B Recirc Pumn a. in service in service b. isolated in service c. in service isolated d. isolated isolated 15) PV:1.0 Unit I was operating at 59% power when total feed flow drops to 15%. Plant conditions are as follows:

-

Reactor Power: 43%

-

Recirc Speed: 28%

-

Recirc Speed Demand 51%

-

Feedwater restored with level stabilized at +35"

-

Recirc deviation meter pegged upscale WHICH ONE of the following describes the status of the recire flow control system?

     >

a. scoop tube is locked b. runback signal is still present c. manual controller has failed upscale d. scoop tube positioner has failed to minimum l

     >

l l PAGE: 9 EXAM: ROWRITTEN

. . . .   - -
  .

16) PV:1.0 The following sequence of events have occurred on Unit 2:

-

A GP-4 (Rapid Plant Shutdown) was performed

-

RPV water level initially dropped to -48" and has been restored to +38" and rising

-

RPV pressure is 960 psig

-

Drywell pressure is 0.4 psig WHICH ONE of the following will prevent a HPCI High Level trip while maintaining HPCI automatic injection capability? a. Depress Manual Isolation pushbutton b. Close Steam Line Inboard Isolation valve (HV55-2F002) c. Depress Turbine Trip while closing Steam Supply (HV55-2F001) d. Place Flow Controller in " MANUAL" and reduce speed to 2000 rpm 17) PV:1.0 WHICH ONE of the following describes the significance of the yellow stripe on selected MCR instrumentation? a. required by Appendix R b. powered by Safeguard DC c. operates in harsh environments d. redundent indication at RSP 18) PV:1.0 WHICH ONE of the following describes the effect of a complete loss of cooling water to a control rod drive mechanism during power operation? a. Index tube bowing b. RPIS reed switch failures c. Reduced life of the graphitar seals d. Expansion of internal components causing binding

PAGE: 10 EXAM: ROWRITTEN

   .
    .
    . .

19) PV:1.0

~ The CRD Flow Controller (FV46-1F0028) fails open during power operation. ,

WHICH ONE of the following illustrates the expected change in CRDH system parameters? System Flow Drive Water do Coolina Water dp

     !
     !

a. higher lower higher b. higher higher higher c. lower higher lower d. lower lower lower

     ;

20) *PV:1.0 l i A Rod Sequence timer malfunction has occurred.

All insert signal times are increased by 8 seconds.

Rod 06-39 is at position 30.

WHICH ONE of the following describes rod 06-39 position after a single notch withdraw signal? a. "00" b. "02" to "28" c. "30 d. "32" to "48"

r

PAGE: 11 EXAM: ROWRITTEN i 2i' *PV:1.0 i i Plant conditions are as follows: l

-

A Reactor Shutdown is in progress

-

Reactor Power: 19%

-

Next in-sequence rod: 18-31

-

Rod 18-31 position: "12"

-

Rod 18-31 target position: "08" Rod 18-31 is Selected.

The " INSERT" Pushbutton is depressed and continously held for 30 seconds.

WHICH ONE of the following describes the status of rod 18-31? a. settle at "10" b. settle at "08" l

     '

c settle at "06" d. settle at "00" .

     !

22) *PV:1.0

 ** REFER TO THE ATTACHED REFERENCE **

l Plant conditions are as follows:

     !
-

Generator load 1175 MWe I

-

Generator reactive load 225 MVAR (lagging)

-

Generator H2 Gas pressure 75 psig i The PSD requests generator load be maintained at 1175 MWe, t WHICH ONE of the following states the additional MVAR (lagging) capacity available? a. 220 b. 275 c. 370 l d. 455 l l

[[ ! l l PAGE: 12 EXAM: ROWRITTEN l

  .

23) PV:1.0 D11 Diesel is running loaded to 2850 KW for its monthly operability ST.

Unit 1 Reactor Level drops to -150".

WHICH ONE of the following describes the status of D11 Diesel and l the Diesel output breaker? D11 Diesel Diesel Outout Breaker a. Isochronous Closed b. Isochronous Open c. Droop Open d. Droop Closed 24) *PV: 1.0 Unit 2 ADS /SRV indication is as follows on 20C626 panel: ADS /SRV Red Licht Green Licht Amber Licht White Licht

"2A" ON OFF ON OFF
"2H" OFF ON ON ON
"2K" OFF ON OFF OFF
"2S" ON OFF ON ON WHICH ONE of the choices below states the ADS /SRV that is currently automatically open due to high reactor pressure?

a. "2A' b. "2H" c. "2K" d. "2S" l l

I ' l l PAGE: 13 EXAM: ROWRITTEN 25) PV:1.0 Unit 1 plant conditions are as follows:

-

ATWS in progress

-

T-270 " Terminate and Prevent" is complete

-

RPV level is -190" and dropping

-

Emergency blowdown is in progress

-

RPV pressure is 210 psig and dropping WHICH ONE of the following actions will initiate Core Spray injection to the reactor? a. Open Inboard (HV52-1F005) and Outboard (HV52-1F004A) valves b. Start "1A" Core Spray pump, open Outboard (HV52-1F004A) valve I c. Close Inboard (HV52-1F005) valve, open Outboard (HV52-1F004A), reopen Inboard (HV52-1F005) valves l d. Start "1A" Core Spray pump, close Outboard (HV52-1F004A) valve, , open Inboard (HV52-1F005), reopen Outboard (HV52-1F004A) valves l l 26) *PV:1.0 The Drywell N2 Purge Supply (HV-57 *21) is currently administratively blocked closed.

WHICH ONE of statements below describes the bases for this configuration? a. nitrogen vaporizer trip due to high flow b. pressure suppression bypass during plant fires c. inability of valves to close against nitrogen flow during purge d. excessive SGTS drawdown time if other unit containment isolates l !

PAGE: 14 EXAM: ROWRITTEN i l

     ,

27) PV:1.0 l l I

The plant is operating at 75% power when the "B" Reactor Enclosure Vent l Exhaust Duct Radiation Monitor fails downscale.

WHICH ONE of the following describes the status of Reactor Enclosure Ventilation and SGTS systems? RE Vent SGTS a. operating standby b. isolated standby c. operating initiated d. isolated initiated 20) *PV:1.0 Unit 2 is in OPCON 5*. The air supply to Refuel Floor Supply to SGTS damper (HV76-019) is lost.

WHICH ONE of the following describes the status of Refuel Floor Secondary Containment? a. will be maintained by the operating RF ventilation fans b. cannot be maintained following RF ventilation fan trip c. will be maintained by SGTS initiation , d. cannot be maintained following SGTS flowpath closure !

PAGE: 15 EXAM: ROWRITTEN

    .

29) *PV:1.0 Unit 2 is operating at 80% power with Feedwater Level Control in Automatic, 3-element control.

The "2A" RFP MGU output fails upscale. l WHICH ONE of the following describes the expected plant response? a. Reactor level decreases, reactor scrams on low level b. Reactor level increases, all turbines trip on high level c. "2B" & "2C" RFP speed decreases, level stabilizes at 35" d. "2B" & "2C" RFP speed remains constant, level stabilizes at 40" 30) PV:1.0 Unit 1 is operating at 25% power when a load reject occurs.

WHICH ONE of the following states the valves that close to prevent a turbine overspeed trip? a. Control and Intercept b. Bleeder Trip and Bypass c. Main Stop and Intermediate Stop d. #2 Main Stop and Moisture Separator Dump l l l

PAGE: 16 EXAM: ROWRITTEN 31) PV:1.0 Unit 1 is in OPCON 3 l Zone 1 and 3 are inter-tied for shield block removal Unit 2 Drywell pressure increases to 2.1 psig i WHICH ONE of the choices below states the zones aligned to SGTS? ' a. Zone 1 only b. Zone 2 only c. Zones 2 and 3 only d. Zones 1, 2, and 3 32) PV:1.0 Unit 2 plant conditions are as follows:

-

The reactor has been shutdown due to a leak in the Drywell

-

Drywell Spray is required

-

D21 Safeguard Bus is de-energized WHICH ONE of the following s an be used to Spray the Drywell without locally operating componentsi a. "2A" RHR pump b. "2B" RHR pump c. Fire Water System d. RHR Service Water System

PAGE: 17 EXAM: ROWRITTEN

    . ,

33) *PV:1.0 Unit 1 Turbine is being removed from service due to an EHC leak. The reactor is to remain critical.

Plant conditions are as follows:

-

Reactor Power is 25%

-

An "A" side half scram is present

-

An EO in the Aux Equipment Room reports that PIS-01-1N652D, First Stage Turbine Pressure, is in the tripped condition WHICH ONE of the following will prevent an automatic reactor scram when the Main Turbine is tripped? a. transfer House Loads to reset PIS-01-1N652D b. insert control rods until PIS-01-1N652D resets c. reduce Generator reactive load with AUTO voltage adjust until PIS-01-1N652D resets d. open Bypass valves until " TURBINE CONTROL /STOP VALVE SCRAM BYPASSED" alarm is lit 34) *PV:1.0 Plant conditions are as follows:

-

Two in-series downcomer vacuum breakers are stuck epen

-

A LOCA occurs in the Drywell

-

Drywell pressure stabilizes at 23 psig

-

Suppression Pool level is 23.5 ft WHICH ONE of the following indicates final Suppression Pool pressure? a. 10 psig b. 18 psig c. 23 psig d. 28 psig

l PAGE: 18 EXAM: ROWRITTEN

     '
  .
     .

l 35) PV:1.0 l

     !

l Plant conditions are as follows:

-

Main Turbine tripped from 100% power

-

40 control rods failed to fully scram due to hydraulic lock

-

Reactor Power is 5%

-

Reactor Mode Switch is in SHUTDOWN"

-

CRD drive water pressure is 260 psid WHICH ONE of the following describes why the RO cannot manually insert control rods? a. RWM rod block b. APRM rod block c. Low CRD drive water pressure d. Full Scram Discharge Volume 36) PV:1.0 Both Units are in OPCON 2 . l A loss of Offsite power occurs WHICH ONE of the following describes the cooling water alignment for the Diesel Generators? Source Return a. Cooling Tower Cooling Tower b. Spray Pond Cooling Tower c. Cooling Tower Spray Pond d. Spray Pond Spray Pond

i PAGE: 19 EXAM: ROWRITTEN

 .
     !

37) *PV:1.0 A loss of all AC power occurs E-1 directs Natural Ventilation to be established for HPCI and RCIC WHICH ONE of the following describes why this action must be taken? a. Service Water flow is lost l b. Reactor Enclosure Ventilation fans are off c. HPCI and RCIC room unit coolers are de-energized d. Steam Leak Detection temperature isolations occur 38) *PV:1.0

WHICH ONE of the following is an Immediate Operator Action for reactor j i high pressure? a. lower Load set b. raise Load Limit c. lower Pressure set d. raise Maximum Combined Flow 39) *PV:1.0

     )

Unit 2 is operating at 100% power.

A Feedwater Level transmitter failure causes reactor level to drop to j-5" for several seconds.

Reactor Power is 37%. WHICH ONE of the following will allow control of RPV level using the j Feedwater Master Controller? { a. " AUTO" mode with thumbwheel setpoint l

     !

b. " AUTO" mode with "OPEN" and "CLOSE" pushbuttons  ; l c. " MANUAL" mode with thumbwheel setpoint d. " MANUAL" mode with "OPEN" and "CLOSE" pushbuttons l

     ,
     ,
     ~,

l PAGE: 20 EXAM: ROWRITTEN i 40) PV:1.0 Unit 1 is in OPCON 5

-

Suppression Pool Cooling is in service using the cross-tie and the "1C" RHR pump

-

DIV 3 LOCA signal occurs WHICH ONE of the following describes the resulting valve alignment for HV51-1F048A (Heat Exchanger Bypass) and HV51-1F017C ("C" LPCI Injection) valves? HV51-1F048A HV51-1F017C a. open open b. open close c. close close d. close open 41) *PV:1.0 Unit 2 is at 90% power

-
" LOSS OF SQUIB VALVE CONTINUITY" alarm annunciates
-

Reactor power is lowering'

-

RWCU isolates WHICH ONE of the following states required action and bases? a. Scram the reactor due to uncontrolled reactivity insertion b. Scram the reactor due to possible thermal limit violations c. Secure SLC pumps due to regional power oscillations d. Secure SLC pumps due to reactor coolant high conductivity < l

a PAGE: 21 EXAM: ROWRITTEN l l t i 42) *PV:1.0

     .

All Remote Transfer Switches are placed to " REMOTE" at the Unit 1 ! Remote Shutdown Panel. I WHICH ONE of the following describes the status of "RCIC STEAM LINE OUTBOARD ISOLATION" (HV-49-1F008) valve? MCR Control Comoonent Interlocks Control Power a. Enabled Active Normal l b. Disabled Bypassed Alternate c. Enabled Bypassed Alternate d. Disabled Active Normal 43) *PV:1.0 l l

     '

Plant conditions are as follows: i

-

Unit 1 is in OPCON 5 l

-

Reactor cavity is flooded with spent fuel pool gates removed

-

Both Reactor Well Top and Bottom seals, #3 and #4, have failed

-

A Site Area Emergency has been declared due to offsite release l WHICH ONE of the following actions is required? a. Enter and execute T-101 j j b. Enter and execute T-102 l c. Enter and execute T-103 d. Enter and execute T-104 l

     !
 .

l

i PAGE: 22 EXAM: ROWRITTEN

 .
  .

44) *PV:1.0 Unit 1 is in OPCON 5* Unit 2 is in OPCON 1 with Drywell N2 makeup in progress A fuel bundle drops in the Unit 1 Spent Fuel Pool Refuel Floor Exhaust Radiation levels increase to 5 mr/hr WHICH ONE of the following states plant response? Unit 2 N2 Makeun RF Ventilation SGTS a. aligned in service in standby b. isolated in service running c. aligned isolated in standby d. isolated isolated running 45) *PV:1.0 Plant conditions are as follows:

-

Drywell Pressure: 24 psig

-

Drywell Temperature: 250 F

-

Suppression Pool level: 39.2 ft WHICH ONE of the following bases states why Drywell Spray is prohibited? a. excessive stress on SRV tailpipes b. excessive Suppression Pool wall loading c. excessive Suppression Pool to Drywell differential pressure d. excessive pressure drop due to evaporative cooling _ ___

 . .

PAGE: 23 EXAM: ROWRITTEN 46) *PV:1.0 Plant conditions are as follows:

-

Reactor is shutdown

-

Suppression Pool level is 16.9 ft

-

RCIC is injecting to the RPV, suction temp 106 F

-

A RHR is in Suppression Pool Cooling, suction temp 115*F

-

B RHR is secured, suction temp 97 F

-

SPOTMOS indicated temp 128*F

-

CST level is 33.5 ft.

WHICH ONE of the following describes the valid Suppression Pool temperature? a. 97*F b. 106*F c. 115 F d. 128 P 47) *PV:1.0 Plant conditions are as follows:

-

Drywell temperature: 200 F

-

Drywell Pressure: 23 psig

-

Suppression Pool Pressure: 22.5 psig

-

Suppression Pool Level: 13.1 ft

-

Suppression Pool Water Temperature: 98*F WHICH ONE of the following actions will allow use of RHR for Suppression Pool Spray? a. vent the Drywell b. vent the Suppression Pool c. raise Suppression Pool level d. reduce Suppression Pool temperature -____

PAGE: 24 EXAM: ROWRITTEN , l 48) *PV:1.0 Steam cooling is in progress per T-111, with the following conditions:

 -

RPV level is -196"

 -

No injection into the RPV WHICH ONE of the following describes the status of the fuel? Adeauate Core Coolino Exoected Peak Clad Temo a. yes 1800 F b. yes 2200 F c. no 1800 F d. no 2200*F 49) *PV:1.0 Plant conditions are as follows:

 -

An ATWS is in progress

 -

Plant Monitoring System (PMS) is inoperable WHICH ONE of the following can be used to confirm that a control rod is fully inserted? a. Green "IN" light is lit on the Full Core Display b. Blue " SCRAM" light is lit on the Full Core Display c. "- " (two dashed lines) on the Four Rod Display d. "X X" (two X's) on the Four Rod Display _ _ _ _ _ _ _ _ _ __ -

l l l l PAGE: 25 EXAM: ROWRITTEN 50) *PV:1.0 Plant conditions are as follows:

-

A South Vent Stack radiation release is in progress

-

Unit 1 Containment Purge with air is in progress

-

SGD-206-3 (Refuel Floor to SGTS connecting damper) is closed WHICH ONE of the following describes the source of the rad release? a. Unit 1 TEECE b. Unit 1 REECE c. Off-gas System d. Unit 1 Containment Purge 51) *PV:1.0 Plant conditions are as follows:

-

A LOCA is in progress

-

Drywell H2 - 3%

-

Drywell O2 - 8%

-

Suppression Pool H2 - 7%

-

Suppression Pool O2 - 4% WHICH ONE of the following describes the T-102 Sheet 2 sections required to be performed? a. DW/G-3 and SP/G-1 b. DW/G-2 and SP/G-2 c. DW/G-3 and SP/G-3 d. DW/G-2 and SP/G-1

     '

I l l PAGE: 26 EXAM: ROWRITTEN

    /  '

i

52) *PV:1.0 l t I Unit 2 is operating at 75% power

     :

The "2B" steam pressure transmitter for EHC fails upscale j l Reactor Mode Switch is placed in " SHUTDOWN"

     {

Reactor pressure is 850 psig and lowering l

WHICH ONE of the actions below will terminate this plant transient?

     !

a. raise PRESSURE SET 1 b. lower BYPASS JACK c. raise LOAD LIMIT l i d. lower MAXIMUM COMBINED FLOW

     !

53) *PV:1.0 i l Unit 1 is operating at 60% power l The "1C" RFP trips while being placed in service l The "1C" Low Pressure Heater string isolates FLLLP is 1.104 and slowly rising WHICH ONE of the following describes the effect on Thermal Power and f reason for this trend? ' a. rising due to rising Reactor Pressure j b. dropping due to lowering Reactor Level c. rising due to loss of feedwater heating d. dropping due to loss of feedwater flow

     !

l l l PAGE: 27 EXAM: ROWRITTEN )

   -
  ..

54) *PV:1.0 l l Unit 2 Remote Shutdown Panel is manned due to a fire in the MCR.

- Drywell Pressure: 2.5 psig

-

DIV 3 DC power lost WHICH ONE of the following states available pressure control? a. "2A", "2C", or "2N" SRV l b. "2S", "2M", or "2K" SRV l c. "2A", "2C", or "2N" SRV only after Instrument Air backup d. "2S", "2M", or "2K" SRV only after Instrument Air backup 55) *PV:1.0

** REFER TO THE ATTACHED REFERENCE **

Unit 1 plant conditions are as follows:

-

Reactor Power: 70%

-

LP Turbine Inlet Pressure: 84 psig

-

Condenser Vacuum: 23.9" Hg WHICH ONE of the following states action required? a. raise recirc flow b. raise " PRESSURE SET" c. place the standby SJAE in service d. trip the turbine within 5 minutes

     ~

F PAGE: 28 EXAM: ROWRITTEN 56) *PV:1.0 Unit 1 DIV IV DC is deenergized.

E-1FD directs initiation of a Manual MCR Chlorine Isolation.

WHICH ONE of the following describes why the manual isolation is initiated? a. minimizes heat load on CEHVAC System b. ensures outside air is isolated to the MCR c. prevents excessive positive MCR pressure d. places MCR on recirc to ensure panel cooling 57) *PV:1.0 The following conditions exist:

-

Unit 1 is at 100% power

-
"1D" Narrow Range Level Transmitter is upscale
"1C" Feedwater Narrow Range Level Transmitter fails upscale.

WHICH ONE of the following states the status of the Reactor Feedpump Turbines and the Main Turbine? RFP Turbines Main Turbine a. operating operating b. tripped tripped c. tripped operating d. operating tripped

     -

, PAGE: 29 EXAM: ROWRITTEN

 .
   .

58) *PV:1.0 Reactor Recirc pumps are required to be tripped during a loss of Instrument Air.

WHICH ONE of the following states the basis for this action? a. loss of Recirc M-G set winding cooling b. loss of Recirc M-G set oil cooling c. loss of Recirc pump seal cooling d. loss of Recirc pump oil cooling 59) *PV:1.0 Following a LOCA, the HV-C-01-1F020 (Main Steam Line Equalizer Valve) is closed and cannot be opened.

All MSIV's are closed.

WHICH ONE of the following describes how leakage past the MSIV seats is controlled? a. directed to the Main Condenser via Main Stop Valve Above Seat Drain lines b. directed to the Main Condenser via Hotwell Heating Coils c. directed to the Reactor Enclosure via Main Steam Line Barrier Vent valves d. directed to the Reactor Enclosure via "1C" Main Steam Line Vent

r ' i l I I

     )

PAGE: 30 EXAM: ROWRITTEN )

  .
    .

60) *PV:1.0 i Unit 2 plant conditions are as follows:  !

-
"2B" RHR operating in Shutdown Cooling in OPCON 4
-
"2B" Reactor Recire Pump SUCTION and DISCHARGE valves (HV43-2F023 and 2F031) are OPEN.

- Reactor Pressure: 25 psig l

-
"2B" RHR Suction Temperature: 120 F  l
-
"2B" RHR Flow:  6200 gpm
-

Reactor Level: +54" WHICH ONE of the following reflects plant status? l Shutdown Coolina Flow Reactor Water Temperature i a. thru core 120*F - b. bypassing core greater than 120 F c. thru core greater than 120 F d. bypassing core 120 F i 61) *PV:1.0 Plant conditions are as follows:

-

RPV Pressure: 50 psig

-

Drywell Pressure: 30 psig l

-

Drywell Temperature: 350 F l

-

Suppression pool level: 20.6 ft i Reactor Level indications: i

-

Wide Range: -70"

-

Shutdown Range: +80" l

-

Upset Range: +60"

-

Narrow Range: +10"

-

Fuel Zone: Upscale l WHICH ONE of the following describes Reactor water level? ) l a. unknown ! I b. -60" to -80" ) l c. +0" to +20" d. +70" to +90" l l

     -

___

l

     !

PAGE: 31 EXAM: ROWRITTEN

 .
    .

63) *PV:1.0 i WHICH ONE of the following describes the basis for maximum Containment l

     '

water level of 115.8 ft? a. Drywell pressure tap becomes covered with water b. Drywell Purge Exhaust line fills with water c. Drywell Spray headers become covered with water d. Drywell equipment hatch seal failure 63) *PV:1.0 Unit 1 is operating at 35% TIP operations are in progress Reactor water level drops to -75".

" REACTOR ENCLOSURE AREA HI RADIATION" Annunciates.

An EO reports " NEUTRON MONITORING SYSTEM AREA" ARM is alarming.

WHICH ONE of the following describes the status and cause of this MCR alarm? a. expected, as TIP withdraws and stops at the indexer b. expected, as TIP withdraws and stops at the shield c. not expected, as TIP withdraws and stops at the indexer d. not expected, as TIP withdraws and stops at the shield !

PAGE: 32 EXAM: ROWRITTEN

  .-

64) *PV:1.0 Plant conditions are as follows:

-

RWCU resin spill has occurred in the Reactor Enclosure

-

Reactor Enclosure HVAC Exhaust rad level is 8.7 mr/hr

-

T-290 readings above MNO as follows: RFCU "A" pump room 121 mr/hr RWCU regen Htx room 102 mr/hr Access to the Reactor Enclosure is required.

WHICH ONE of the following actions is required?  ! a. isolate Refuel Floor HVAC b. restore Reactor Enclosure HVAC c. ensure Standby Gas Treatment System running d. manually scram the reactor at 50% core flow 65) *PV:1.0 Unit 2 Reactor Power is 3%

"2A" Recirc Pump trips WHICH ONE of the choices below states required Immediate Operator Action (s)?

a. SCRAM the Reactor and PLACE mode switch in " SHUTDOWN" b. Drive rods to exit the Restricted Area of Power / Flow Map c. Close " DISCHARGE" Valve (HV43-2F031A) for tripped Recirc Pump d. MONITOR and CONTROL Reactor Level until normal level restored

PAGE: 33 EXAM: ROWRITTEN 66) *PV:1.0 Refueling activities are in progress on Unit 1.

All control rods are fully inserted.

A fuel bundle is being moved from the Spent Fuel Pool to the Core.

WHICH ONE of the following conditions is required if the Refuel i Bridge is to enter the fuel transfer / cattle chute area at normal speed? l a. Auxiliary Hoists are not loaded b. Boundary Zone Computer in " Bypass" c. Reactor Mode Switch in " SHUTDOWN" d. Grapple at the normal full up position 67) *PV:1.0 Plant conditions are as follows:

-

Unit 1 is at 3% power

-

Mechanical vacuum Pump operating

-

All MSIVs and Main Steam Line Drain valves open

"1A" and "1B" Main Steam Line Radiation Monitors both trip (>3xNFPB)

WHICH ONE of the following describes plant status? MSIVs Steam Line Drains Mechanical Vacuum Pumo a. open open tripped b. isolated open running c. open isolated running d. ioolated isolated tripped

r~ 1 i l l PAGE: 34 EXAM: ROWRITTEN j

     )
     -

i 68) *PV:1.0 i Reactor power is 20% j l Control Rod 28-29 is selected i WHICH ONE of the following describes Rod Block Monitor (RBM) status? a. bypassed, will not enforce a rod block b. bypassed, will enforce a rod block at 107% c. enforcing, will enforce a rod block at 112% d. enforcing, will enforce a rod block at 117% 69) *PV:1.0 Plant conditions are as follows:

-

In OPCON 5

-

Reactor Cavity is flooded

-

Spent Fuel Pool gates are removed

-

Reactor Cavity Water Level begins to drop

-

Spent Fuel Pool makeup cannot stabilize Reactor Cavity Water Level WHICH ONE of the following describes the long term effects? Fuel Pool Fuel In Spent Coolina Pumos Fuel Pool a. tripped uncovered b. running uncovered c. tripped covered d. running covered l

E'  ! PAGE: 35 EXAM: ROWRITTEN l 70) *PV:1.0 The following parameters are reported for Unit 1:

-

HPCI Pump Room: 160*F

-

RCIC Pump Room: 100*F

-
 "1A" & "1C" RHR Pump Room: 150 F
-

HPCI Room Water Level: 8"  !

-

All other T-290, " Instrumentation Available For T-103", j parameters are normal  ; WHICH ONE of the following systems are no longer assured to be available for safe shutdown of the plant?

a. HPCI b. RCIC c. HPCI and RCIC d. "1A" & "1C" RHR pumps

     !

71) *PV:1.0 The Unit 2 RO is requested to support a PMT which requires data collection from the Containment Hydrogen Recombiner panel 2AC696.

The data will take 20 minutes to obtain.

WHICH ONE of the following describes the necessary steps for the RO to obtain the data? a. notify the PRO, short term relief is not required b. obtain CRS authorization, short term relief is not required c. short term relief is required, no log entry is required d. short term relief is required, log entry is required

l i

I .

     (

PAGE: 36 EXAM: ROWRITTEN

     .

72) *PV:1.0 The Unit is in OPCON 1 Manual Scoop Tube operation is required at the M-G set ' The Floor Supervisor is standing by at the M-G set to provide needed support WHICH ONE of the individuals below is permitted to manipulate the Scoop Tube? a. Duty Reactor Engineer b. Turbine Enclosure EO (nonlicensed) c. Engineer in current SRO Certification class d. EO in current RO licensing class 73) *PV:1.0 j t ST-6-092-364-1, D14 DIESEL GENERATOR OPERABILITY VERIFICATION, is in j progress. l The EO working locally at the EDG reports that the procedure directs operation of LOCAL-REMOTE SELECTOR SWITCH "43-DG207". j The EO verifies that this switch number should be "43-DG501". I i WHICH ONE of the following describes the actions necessary to complete i this ST? a. stop, submit a TC for the change and then continue b. stop, submit a PPIS for the change and then continue l c. complete the ST, then submit a TC for the change d. complete the ST, then submit a PPIS for the change _____

I l PAGE: 37 EXAM: ROWRITTEN 74) *PV:1.0 Clearance removal is being evaluated for Independent and Double Verification requirements? Verification of several steps in the clearance will require exposure of 12 to 15 mR.

WHICH ONE of the following reflects verification requirements? Independent Double Verifications verifications a. can be waived can not be waived

      :

b. can not be waived can be waived c. can not be waived can not be waived d. can be waived can be waived 75) *PV:1.0 Plant conditions are as follows:

 -

An ATWS is in progress

 -

T-101, RPV CONTROL, and T-117, POWER / LEVEL CONTROL, are being implemented

 -

SAMP procedure entry is now required WHICH ONE of the following states the procedures which are required to be implemented? a. SAMPs only b. SAMPs and T-101 c. SAMPs and T-117 d. SAMPs, T-101 and T-117 l I l.

L_______________.______________ _ __ _ _ __ _ __

m l l PAGE: 38 EXAM: ROWRITTEN 76) *PV:1.0 Plant conditions are as follows: i l

-

Reactor power is 7% j

-

Mode Switch is in "RUN"

-

All IRMs are fully inserted

-
"E" APRM is downscale reading 2%   l
-
"B" APRM is INOP    l
- "G" IRM is INOP WHICH ONE of the following describes how RPS will respond?

a. full scram b. remains energized c. only "A" side half scram d. only "B" side half scram 77) *PV:1.0 All Non-Safeguard DC power is lost.

WHICH ONE of the following describes the operation of the 13.2 kV Aux Buses? a. auto transfers to offsite source when main turbine trips b. can be manually transferred to offsite source from MCR c. auto transfers when 13.2 kV bus voltage drops to 90% d. bus voltage drops to zero as the turbine slows

.

PAGE: 39 EXAM: ROWRITTEN

 -
     ,

78) *PV:1.0 SRVs are automatically cycling open and closed due to high Reactor pressure.

WHICH ONE of the following describes the reason SRVs should be opened l manually to reduce Reactor pressure to 990 psig? a. prevents excessive inventory loss

b. minimizes the potential of an SRV sticking open j c. minimizes SRV accumulator inventory loss d. minimizes potential for a stuck open Downcomer Vacuum Breaker 79) *PV:1.0 Plant conditions are as follows:

-

Drywell Pressure: 2.5 psig

-

Reactor Pressure: 600 psig

-

H202 Analyzers are bypassed and returned to service

-

Reactor level subsequently drops to -135" '

WHICH ONE of the following describes why the H202 Analyzer sample

     '

valves have re-closed?  ; a. bypass logic malfunction ' 1. second isolation signal received l l c. loss of Instrument Air pressure l d. loss of power to the valve logic l

     <
,-

f , I PAGE: 40 EXAM: ROWRITTEN

   -
  -
'  '
   ' v . et u '

80) =FV:1.0 Plant conditions are as follows:

-

Unit 1 is in OPCON 2

-

Reactor Pressure: 300 psig l

-

Feedwater is aligned for Startup Level Control, RFP Discharge i

     '

Valves are closed

-

A loss of Instrument Air occurs, both headers indicate 0 psig WHICH ONE of the following describes Feedwater makeup capability? , l a. not available b. available with "1A" RFP c. available with LIC-06-138 (STARTUP BYPASS) l d. available with LIC-06-120 (RFP BYPASS CONTROLLER) l 81) *PV:1.0 All four (4) POST LOCA RAD MONITORS trip.

WHICH ONE of the choices below reflects the status of Reactor Enclosure sumps? Floor Drain Eauioment Drain a. aligned to Radwaste aligned to Radwaste b. pumps tripped aligned to Radwaste c. aligned to Radwaste pumps tripped d. pumps tripped pumps tripped }

 ..

_ _ PAGE: 41 EXAM: ROWRITTEN

  .

82) *PV:1.0 A TIP is stuck in the core during an accident.

WHICH ONE of the following will isolate the TIP penetration? a. place Drive Control Unit power switch to "OFF" b. place Explosive Shear Valve keylock to " FIRE" c. remove control power fuse from front of Drive Control Unit d. place Drive Control Unit Ball Valve control switch to " CLOSED" 83) *PV:1.0 Unit 2 is in OPCON 4.

"2B" RHR Loop in Shutdown Cooling.

A Div II High Drywell Pressure signal is initiated.

WHICH ONE of the following describes the status of "2B" RHR Loop? LPCI Injection Shutdown Cooling Valve (2F017B) Return Valve (2F015B) a. open closed b. closed closed c. open open d. closed open _____ -

r PAGE: 42 EXAM: ROWRITTEN 84) *PV:1.0 CARDOX has been manually initiated for CABLE SPREAD ROOM Worriers are still ,in the Inverter Room WHICH ONE of the following describes the action required to terminate CARDOX operation? a. set pneumatic discharge timer to zero b. isolate CO2 line in Cable Spread Room c. select " ABORT" on panel outside Cable Spread Room d. isolate CO2 tank located on Turbine Enclosure 217' elevation 85) *PV:1.0 Plant conditions are as follows:

-

Unit 1 is in OPCON 1

-

Hotwell Level: 45"

-

CST Level: 28.5' WHICH ONE of the following adjustments to the Hotwell Level Controllers will add inventory to the CST? a. select " MANUAL" and adjust output to " REJECT" b. select " MANUAL" and adjust output to zero c. select " MANUAL" and adjust output to " MAKEUP" d. select " AUTO" and adjust setpoint ribbon to 50"

   . _ _ _ _ _ _ _ _ _ ____-__- -

PAGE: 43 EXAM: ROWRITTEN 86) *PV:1.0 Plant conditions are as follows:

-

Both units are at 8% power

-

Both turbines are at 1800 rpm WHICH ONE of the following describes the results of Turbine Exhaust Hood Temperature reaching 230 F on both Units? Unit 1 Turbine Unit 2 Turbine a. Tripped Tripped b. On-line On-line c. Tripped On-line d. On-line Tripped 87) *PV:1.0 Unit 2 has sustained combustion in the Offgas System.

HWC System is in operation.

WHICH Flow? ONE of the following will immediately terminate 02 Injection a. manually closing SJAE first stage steam valves b. manually closing SJAE second stage steam valves c. depressing HWC SHUTDOWN SWITCH for 2 seconds d. depressing HWC SHUTDOWN SWITCH for 17 seconds ! l . _--_--

PAGE: 44 EXAM: ROWRITTEN 88) *PV:1.0 Unit 1 plant conditions are as follows:

-

A LOCA signal is present

-
"1A" RHR is in Suppression Pool Spray
-

Drywell Pressure has been lowered to 1.2 psig The LOCA signal is reset WHICH ONE of the following describes the status of a "1A" RHR? Full Flow Test Pool Spray HV51-1F024A HV51-1F027A a. Closed Closed b. Open Closed c. Closed Open d. Open Open 89) *PV:1.0 Plant conditions are as follows:

-

Unit 2 experienced a loss of offsite power 10 minutes ago

-

D22 and D24 diesels failed to start

-

Reactor Power: 9%

-

Reactor Pressure: 1160 psig WHICH ONE of the following describes the status of Unit 2 SLC System? SLC Pumos SLC Souib Valves a. not running not fired b. A and B running A and B fired c. A and C running A and C fired d. A,B, and C running A,B,and C fired s

I I I PAGE: 45 EXAM: ROWRITTEN l l

   '

n i 90) *PV:1.0 i j n Plant conditions are as follows: 4

-

RCIC is running aligned to the CST j

-

Suppression Pool Level is 17 feet and rising  !

     !

CST level is dropping.

WHICH ONE of the following describes when RCIC suction will automatically align to the Suppression Pool? a. 22 feet in Suppression Pool b. 24.2 feet in Suppression Pool c. 29 feet in CST d. 2.3 feet in CST 91) *PV:1.0 Unit 1 is at 40% power

-
"1A" and "1B" RFP's in service
-
"1C" RFP is secured
-

Reactor Level Control is in automatic, 3-element control.

The "1B" RFP Low Pressure Main Stop Valve fails closed.

WHICH ONE of the following describes plant status five (5) minutes later? 1B RFP Reactor Water Level a. feeding lowering b. feeding normal c. not feeding lowering

'

d. not fending normal

l l PAGE: 46 EXAM: ROWRITTEN

l 92) *PV:1.0

l l

     '

l The plant is in OPCON 2 with the following IRM indications: IRM RANGE READING A 6 79 l B 6 83 C 6 123 D 6 Bypassed E 6 97 F 6 122 G 6 81 H 6 103 WHICH ONE of the following actions are required? a. Bypass C IRM b. Perform a GP-4 shutdown c. Immediately scram the reactor d. Position all IRMs to range 7 93) *PV:1.0 Unit 2 has scrammed due to a Main Turbine high water level trip.

WHICH ONE of the following communications from the RO to the CRS requires a repeat back? a. " securing the CRD pump" b. " inserting SRMs and IRMs" c. " placing the Mode Switch in Shutdown" d. " House Loads have transferred"

II l PAGE: 47 EXAM: ROWRITTEN l 94) *PV:1.0 I&C testing is being performed Main Steam Line Flow High channel B calibration functional (ST-2-041-425-2) is in progress.

Expected alarm " MAIN STEAM LINE HI FLOW" annunciates.

WHICH ONE of the following describes required MCR alarm response to this testing? a. only the unit RO is permitted to acknowledge this alarm b. only the PRO is permitted to acknowledge this alarm c. I&C is permitted to acknowledge this alarm with RO concurrence d. I&C is permitted to acknowledge this alarm without RO concurrence.

95) *PV:1.0 WHICH ONE of the following describes appropriate use of an Information Tag? a. on the HPCI Auxiliary Steam manual supply valve during a HPCI block b. on a Service Water motor operated valve feeder breaker during adjustment to valve packing c. on a CRD HCU manual valve that is to be replaced during a CRD block d. on a Feedwater Heater Level Controller Drain valve operated in

" MANUAL" during troubleshooting under TRT

l PAGE: 48 EXAM: ROWRITTEN

.  .
   .
    .

96) *PV:1.0 Unit 1 is in OPCON 5 with Core Alterations in progress.

The Refuel Bridge has lost communication with the RO while removing a bundle from the core.

WHICH ONE of the following describes the status of core alterations? a. may continue at the discretion of the Fuel Handling Director ; i b. must be suspended after the bundle is placed in a safe location

c. may continue if the RO monitors fuel movements via the Refuel Floor video equipment d. must be suspended immediately and the bundle must not be raised or lowered.

97) *PV:1.0 An individual has 3200 mR TEDE annual exposure.

This worker is required to perform an evolution with an exposure estimate of 400 mR.

WHICH ONE of the following describes the appropriate dose controls? a. no Dose Extension is required b. Admin Dose Extension is required c. Planned Special Exposure is required d. no further exposure is permitted

l l PAGE: 49 EXAM: ROWRITTEN l

     '

98) *PV:1.0 After exiting a posted Contaminated Area, you perform a whole body frisk.

- Background Readings are 350 cpm

-

Highest reading during whole frisk 470 cpm WHICH ONE of the following describes action to be taken? a. continue with assigned work b. reperform frisk, if readings are unchanged, contact HP c. change scrubs, reperform frisk, if readings remain unchanged l

     '

continue work d. move to an area of lower background, taking measures to contain any contamination, reperform frisk 99) *PV:1.0 T-200, Primary Containment Emergency Vent Procedure, requires closing Steam Flooding 7ampers when preparing to vent through the 24" Suppression Pc. Surge supply Line.

WHICH ONE of the followinf describes the method and reason for accomplishing this? a, place steam flooding damper keylock switches to test; prevents duct work rupture b. initiate a reactor enclosure HVAC isolation from the MCR; prevents duct work rupture c. place steam flooding damper keylock switches to test; minimizes steam flooding in critical areas d. initiate a reactor enclosure HVAC isolation from the MCR; minimizes steam flooding in critical areas

i

i PAGE: 50 EXAM: ROWRITTEN l l l l 100) *PV:1.0 A Site Area Emergency has been declared.

' All required Emergency Response Facilities have been activated.

WHICH ONE of the following describes where Equipment Operators '

     ,

will assemble? i I a. OSC 1 l b. FOF l c. EFDC d. TSC l

    ;
    ;

i l j

I

i

    !

i

  ,u   O  e- a 5 3
      -

ne o

 -
- 7e  WO ^m.       ,Wa 7Oa ,Oa Mm    OO I E  G. 'I I u,>a  o eO * m ,.

G .Wa iO_ gg Mmu a Ia oO

          -

I u,>m E N NO$ : I ,o 9 O "m. ~ A ,Wu * O a., W m r nIu mO I

      ~ H  wc5 d'.
 *e
            :

I s ,o

  -

O m D C '

          .

Wu nO. ,O oIa NO I I

>m 'e g.      O   .

nWa h. dOa rIa oO b T

   -

w . m T = I N

         .
   'm.. e= Y   .N I O , > ;. 7mu  *O.

t A L -W u dO. Mme nIu oO I 1" t T 3 E I n,>m om dO_ "m.. R B T Wa qO. Mma e r N a 4O I O L E I O,>a I

 "m  o-  m  P  L   mWa MO. nOs  mu MO
        %:%" PmWs rOo
   "   I       1 (

I M C A P I o,>a "m.oa

 *
   ' m ,. I N c M -

Mmu pIu NO I E : O I Oe>m ,mm SOu *mu P E C ,Wo nOu ,Oo r 2 L fIu"O t' I P E I nru Oma " Oa r h m ;. # M S ,Wu l nOu Nmu nIu OO 1 I u,>a 4a. . 1O. 1 rm E S U A X E A R E

          ,Wu nOu  Mma nIu OD  i -
               -

I u,>u ,o . 9O. 7 m m.

  • * * W e Oa nmo n N u CM l

I - I a,>c 7eo ,o.. ,ma ,Wu 1Ou 9mu nIu NQ t I I w,>e ,ou ,Om 9ma -

       - ,
          ,Wu l DOu Mmo n   u CQ I

_ I O,>a Wou ,Ou 9ma ka u nOu nOu Mmo mD = I n,>u Mmm mom t' t m, - g g N O I Wu tFOu Mmt u 4W e i i _

               =

_ _ T - I a,>e 1m_

7Oa 'me ' o A ,us J MOu Mmu 's c N u OG I g ]. N C 1 o,>a ,oa 7Oe nma I M ,Wu MOu MOu AT rIu ND i I A

uO ,> u ,oa ' tom 9m- X ,luu 'Oa Mmu

           "
             .Iu "W y/
  '

I E e i n ,>a ea,.

 .

noo Smu @

     /   S t

a n ru _Wu MOu qOa emu t OW I

_ I un ,mo oa nom *m- ' B 0 IH e s ,Wo l MOu Ama nIu O& I _ I uw , > u ,om MO, ama P8 - T N ,Wu OOu NOu AY rIu oN u N mr t I O M O , Wu l 1Ou Mmu dIa NN N I aa *am ,oo ~ O ,. m m ;.

 :

I r I O T A A

    .

K I T I nw , >u fm4 , o ,. 1 *m,

    -  T X   R  mWu OOu nOu Mmo   ON I C S E   O       E I

aO ,> u ,om m O x, W Wu OOu nOu Mmu R

   - m :.          mN I I D

L I as 9mm ,om *.O. 'm2

    -

L E Wu l nOu Mmu r Ia 4> t I S I na ,> s om A C 2 H T I 9

nOu Mm-  ; N nUu fOu nOu Nma t

          "

9>

              ( I Z A I       D I

uo,>> imu 7 Oe Mm>

   --

t U TS Wu l "Ou ?mu nIu N> t

           ' 9
            '

I E E s w O I S F I uO om ,ou m O ,. am.. f

          ,Wu f nOu smu nIu ek
            't i

D S I u ,,>a ou a Om , mu E A Wu t qOa Dmu rIu O> 1 7" T i I uu e > m ,o

  .

mOu t*m.

- C D E E R V

          ,Wu ,Ou  Dmu 1Iu O@ r  I
               ^
               -

I I ou , > o ,oa 'Ou ,ms t

   -

R E ,Ju u nOu MOu 'mu t

            '

OO C I O C I ua n > o 7ma 7Om 1 7 m> - C E mWu f Ou MOu Mmu

N@ I - E R I uw r au moa - O t -

   '

q m ,. H R Wu t rOu 1mo nIu o@) f I

       -

~ I uO , > u %' mm ,oa #1 m, T O MWu t MOu Mmu n u o@ I D N t ~I I un , > > e m , ua , > a 7, m s 1Oo m m ,. 1O ,. rm ,. - N N A E T S V I nWo MOu

          ,.Wu MOu nO Mmu nIa T@

nIu oC t I I - I uo r >, 1me ro,

.  ,

nm- # R G E D R mWu ,Ou 45Ou 1W erIu ND I %I aO > > nma ,om - me t T R E L L N E H

          ,Wa nOo nOu Mmu    eO I

~ ts B O U T I a- geu L ,o."Ou 1 c mr

    =   la M R D E I

Wu nOo ,Ou O N u O@ I U Y I su ,> a ,o2 moo 9mo L N A N N ,Wu DO. n a Nmo OD P A E - wh I

  ,o:      Y O D      0D I

au n >o r.mm 1m-R TI C E V A e,*,Oc PO_ *fO Oma . ( I I I sa , > ', m e ,o aw > . a m- O

mmo ma A E L T E L I R U C E E P

       /

E W I V H(.. I N, s

         . uWa Wa 7Ou iou ,mu

_Wa "Ou nOa t T oNu OD ND I I

               =

_ _ C T S Y EW _ _ _ I aO,>. ? m, 'O.

" " m- t U E N R O ,Wu *Ou

           * ,m .

7Iu mD I _ N S T L A E ., O R EIR N A P Y~ 4Wa "l 3 r> I an > . ~ m *O. - m. I C M E V f ,i 'o.

' 4 SL I C E O U MP O O T A M

         '% rW-

_ I aa tm o.'O. ' a mi ... A A H _Wu 9Ou gg Mmu 1c a OD C I _

     .

P C N S C D i ._

               =

I se m o *C -m A%

          ,

7Oa T mu ,

Iu ND I l

        '

_

,         ,  ,Ws *O 7Oa Om   "M =

I uO > i o Dm m - g : I

               =

m Hm@ gg t Ma A( _

Attachment 4 SRO WRITTEN EXAM W/ ANSWER KEY j l l

l

  !

l l l

_ f

     !

I

 << EXAM INFORMATION >>

EXAM NO.: SROWRITTEN

     .

DATE GENERATED: 02/11/99 TOTAL POINTS: 100.00 RESPONSE TIME (min): 0.0 AVERAGE DIFFICULTY : 1.9 R MULT. CHOICE TRUE FALSE ESSAY FILL IN MATCHING _ _ QUESTIONS:100 QUESTIONS: 0 QUESTIONS: 0 QUESTIONS: 0 QUESTIONS: 0 POINTS:100.00 POINTS: 0.00 POINTS: 0.00 POINTS: 0.00 POINTS: 0.00

r i l i l PAGE: 1 EXAM: SROWRITTEN

 .. . . .
    .  .

I 1) *PV:1.0 j l Reactor power is 32% LT-47 *N012D SDV level transmitter fails upscale resulting in a B2 half scram.

WHICH ONE of the following describes the resulting position of the SDV 1

     '

vent and drain valves.

a. ALL SDV vent and drain valves open

b. ALL SDV vent and drain valves closed ' c. Inboard vent and drain valves open, outboard vent and drain valves closed.

d. Outboard vent and drain valves open, inboard vent and drain valves closed.

3) PV:1.0 A total loss of Instrument Air occurs.

Plant conditions are ao follows:

-

All acram valves are open with reactor power at 28%

-

LI-48-1R601 on 10C603 SLC tank level reads 0 inches

-
" STANDBY LIQiTID TANK HI/LO LEVEL" alarm annunciates
-
" STANDBY LIQUID TANK LO-LO LEVEL" alarm not lit WHICH ONE of the following describes the response of the SLC system.

a. All SLC pumps are tripped on low level and will not start b. All SLC pumps will start 118 seconds after RRCS is initiated c. A & B pumps will start 118 seconds after RRCS is initated.

C SLC pump is tripped on low level and will not start.

d. C SLC pump will start 118 seconds after RRCS is initiated.

A & B pumps are tripped on low level and will not start.

l PAGE: 2 EXAM: SROWRITTEN !

 ,
 .
 .
    .

l i 3) PV:1,.0 ) Plant conditions are as follows:

-

A loss of offsite power has occurred for both units D12, D14, and D21 busses are de-energized

     ,
-

i WHICH ONE of the following describes the loops of RHR that can be placed l in Suppression Pool Cooling? '

a. 1A and 2A

     ,

b. 1A and 2B c. 1B and 2A . l d. 1B and 2B 4) *PV:1.0 A chemical spill results in the following indications:

"A" and "C" Toxic Gas monitors tripped
"A" and "D" Control Enclosure Chlorine monitors upscale
     !

WHICH ONE of the following describes CREFAS status?

     !

a. will remain in ctandby, no CREFAS fan running b. will automatically initiate only "A" CREFAS, with "A" CREFAS fan running  ; c, will automatically initiate only "B" CREFAS, with "B" CREFAS fan running d. will automatically initiate both "A" and "B" CREFAS, both fans running i

PAGE: 3 EXAM: SROWRITTEN 5) PV:1.0 Plant conditions are as follows:

-

Reactor Level is +35"

-

DIV 3 LOCA signal (-129") was initiated 10 minutes ago due to an excess flow check valve actuation

-
"C" RHR pump is in full flow test for PMT WHICH ONE of the following would result in an automatic initiation of ADS after 105 seconds?

a. RPV level drops below +12.5" b. "A" RHR pump is started c. RPV level drops below +12.5" and "A" RHR pump is started d. RPV level drops below +12.5" and "B" RHR pump is started 6) *PV:1.0 WHICH ONE of the following identifies the parameter held constant by the HPCI Flow Controller when operating in " MANUAL" mode as reactor pressure changes? a. discharge flow b. control valve position c. turbine speed d. discharge pressure

l PAGE: 4 EXAM: SROWRITTEN i

     !

7) PV:1.0 Unit 1 plant conditions are as follows: l

-

D13 bus is locked out  ;

-

RPV level is -140" q

-

RPV pressure is 230 psig  ; WHICH ONE of the following describes the status of "A" Loop Core Spray? a. Not injecting, A and C pumps running on min flow I b. Injecting approximately 3000 gpm l

c. Not injecting, A and C pumps off d. Injecting approximately 6000 gpm

8) *PV:1.0 Unit 1 plant conditions are as follows: I

-

Reactor Pressure 300 psig

-

Reactor Level -25 inches

-

Drywell Spray is in service using "1A" RHR pump

-

HV51-1F017A is closed in " MANUAL OVERRIDE" The RPV pressure input signal to 1A RHR valve logic fails to 1100 psig WHICH ONE of the following describes the response of the 1A RHR System? a. HV51-1F017A re-opens, MANUAL OVERRIDE" light lit b. HV51-1F017A re-opens, " MANUAL OVERRIDE" light out c. HV51-1F017A remains closed, " MANUAL OVERRIDE" light lit d. HV51-1F017A remains closed, " MANUAL OVERRIDE" light out

PAGE: 5 EXAM: SROWRITTEN 9) *PV:1.0 Unit 1 plant conditions are as follows:

-
"DIV 1 STEAM LEAK DETECTION" alarm lit due to high temperature in RCIC room
-
"DIV 3 STEAM LEAK DETECTION" alarm not lit
-
"RCIC STEAM LINE HI FLOW" alarm lit due to steam flow greater than 300% of rated WHICH ONE of the following describes the expected status of the RCIC Isolation Valves?

HV49-1F007 HV49-1F008 (RCIC Steam Line (RCIC Steam Line Inboard Isolation) Outboard Isolation) a. open open b. open closed c. closed open l d. closed closed j

     ;

1 I

     !
     !

l l PAGE: 6 EXAM: SROWRITTEN l 10) *PV:1.0 The plant is in OPCON 2 performin.J startup IRM's on range 5 reading between 40 and 60 The SRM's are being withdrawn from the core with the following readings: SRM: A B C D CPS: 120 86 118 109 WHICH ONE of the following describes plant status? SRM RETRACT PERMIT Licht ROD OUT BLOCK a. on yes b. off yes l c. on no d. off no i 11) PV:1.0 During steady state operation at 50% power, 8 LPRM's fail downscale.

WHICH ONE of the following describes the effect on core thermal power P-1 calculations? a. will abort and not run b. will indicate less than actual power c. will indicate actual power d. will indicate greater than actual power

-

c 1 l PAGE: 7 EXAM: SROWRITTEN l l 12) *PV:1.0 The plant is operating at 100% power l l One RWCU filter /demin is removed from service.

RWCU remains in service at the same flowrate with 2 pumps, 1 filter / demin, and the DEMIN BYPASS (HV-44 *F044) throttled.

WHICH ONE of the following describes the trend on reactor water l conductivity? a. remain at the current value l b. drop and stabilize at a lower value c. rise and stabilize at a higher value d. rise continually until the second filter /demin is restored 13) *PV:1.0 Unit 2 is operating at 65% power during a power ascension.

RCIC is operating in Full Flow test for surveillance testing.

Feedwater Level Control is selected to Automatic 3-element control.

"2B" Reactor Feed Flow transmitter fails upscale.

WHICH ONE of the following is a problem associated with continued operation in this condition? a. excessive "2A" RFP flow b. reduced Recirc Pump NPSH c. RFP suction header vibration d. unplanned RCIC high level shutdown

i t PAGE: 8 EXAM: SROWRITTEN l l 14) *PV:1.0 l The plant is operating at 95% I i

     !

A leak occurs on the "A" recirc loop. l l

"A" recirc pump is shutdown and isolated. i
     .

l Reactor level dropped to -50" and is stabilized at +30" 5 minutes later. ! WHICH ONE of the following describes the status of seal purge flow to the recire pumps? A Recirc Pumo B Recirc Pumo a. in service in service  ! l b. isolated in service l c. in service isolated d. isolated isolated 15) PV:1.0 Unit 1 was operating at 59% power when total feed flow drops to 15%. Plant conditions are as follows:

-

Reactor Power: 43%

-

Recirc Speed: 28%

-

Recirc Speed Demand 51%

-

Feedwater restored with level stabilized at +35"

-

Recirc deviation meter pegged upscale WHICH ONE of the following describes the status of the recirc flow control system? a. scoop tube is locked b. runback signal is still present c. manual controller has failed upscale d. scoop tube positioner has failed to minimum

PAGE: 9 EXAM: SROWRITTEN

 ..     .

16) PV:1.0 The following sequence of events have occurred on Unit 2: i

-

A GP-4 (Rapid Plant Shutdown) was performed

-

RPV water level initially dropped to -48" and has been restored to +38" and rising

-

RPV pressure is 960 psig

-

Drywell pressure is 0.4 psig WHICH ONE of the following will prevent a HPCI High Level trip while maintaining HPCI automatic injection capability? l a. Depress Manual Isolation pushbutton i b. Close Steam Line Inboard Isolation valve (HV55-2F002) c. Depress Turbine Trip while closing Steam Supply (EV55-2F001) d. Place Flow Controller in " MANUAL" and reduce speed to 2000 rpm 17) PV:1.0 WHICH ONE of the following describes the significance of the yellow stripe on selected MCR instrumentation? a. required by Appendix R b. powered by Safeguard DC c. operates in harsh environments d. redundent indication at RSP 18) PV:1.0 WHICH ONE of the following describes the effect of a complete loss of cooling water to a control rod drive mechanism during power operation? a. Index tube bowing b. RPIS reed switch failures c. Reduced life of the graphitar seals d. Expansion of internal components causing binding

[ l l l PAGE: 10 EXAM: SROWRITTEN

     -
     .

l l 19) PV:1.0 l l l The CRD Flow Controller (FV46-1F002B) fails open during power operation.

WHICH ONE of the following illustrates the expected change in CRDH system parameters? System Flow Drive Water do Coolina Water do a. higher lower higher b. higher higher higher c. lower higher lower d. lower lower lower 20) *PV:1.0 A Rod Sequence timer malfunction has occurred.

All insert signal times are increased by 8 seconds.

Rod 06-39 is at position 30.

WHICH ONE of the following describes rod 06-39 position after a single notch withdraw signal? a. "00" b. "02" to "28" c. "30 d. "32" to "48"

PAGE: 11 EXAM: SROWRITTEN

  ~   t
    .

21) *PV:1.0

, Plant conditions are as follows:
-

A Reactor Shutdown is in progress

-

Reactor Power: 19% 1

-

Next in-sequence rod: 18-31

-

Rod 18-31 position: "12"

-

Rod 18-31 target position: "08" Rod 18-31 is Selected.

The " INSERT" Pushbutton is depressed and continously held for 30 seconds.

WHICH ONE of the following describes the status of rod 18-31? a. settle at "10"  ! b. settle at "08" I c. settle at "06" l

d. settle at "00" 22) *PV:1.0 j

     !
     :
 ** REFER TO THE ATTACHED REFERENCE **  l Plant conditions are as follows:
-

Generator load 1175 MWe

-

Generator reactive load 225 MVAR (lagging)

-

Generator H2 Gas pressure 75 psig i The PSD requests generator load be maintained at 1175 MWe.

WHICH ONE of the following states the additional MVAR,(lagging) capacity available? a. 220 b. 275 c. 370 d. 455

T* PAGE: 12 EXAM: SROWRITTEN 23) PV:1.0 {

D11 Diesel is running loaded to 2850 KW for its monthly operability ST.

Unit 1 Reactor Level drops to -150".

WHICH ONE of the following describes the status of D11 Diesel and the Diesel Output breaker? D11 Diesel , Diesel Outout Breaker a. Isochronous Closed b. Isochronous Open c. Droop Open d. Droop Closed l 24) *PV:1.0 Unit 2 ADS /SRV indication is as follows on 20C626 panel: ADS /SRV Red Licht Green Licht Amber Licht White Licht

"2A" ON OFF ON OFF  l
"2H" OFF ON ON ON  l
"2K" OFF ON OFF OFF  i
"2S" ON OFF ON ON i

WHICH ONE of the choices below states the ADS /SRV that is currently automatically open due to high reactor pressure? a. "2A' b. "2H" c. "2K" d. "2S"

PAGE: 13 EXAM: SROWRITTEN

  -
   ,
    .
     ..
     !

25) PV:1.0 t

     !

Unit 1 plant conditions are as follows:

     {
-

ATWS in progress

-

T-270 " Terminate and Prevent" is complete

-

RPV level is -190" and dropping

-

Emergency blowdown is in progress

     {
-

RPV pressure is 210 psig and dropping  ; i WHICH ONE of the following actions will initiate Core Spray injection ! to the reactor?  !

     ;

a. Open Inboard (HV52-1F005) and Outboard (HV52-1F004A) valves b. Start "1A" Core Spray pump, open Outboard (HV52-1F004A) valve c. Close Inboard (HV52-1F005) valve, open Outboard (HV52-1F004A), l reopen Inboard (HV52-1F005) valves i i d. Start "1A" Core Spray pump, close outboard (HV52-1F004A) valve, , open Inboard (HV52-1F005), reopen Outboard (HV52-1F004A) valves 26) *PV:1.0

     ,

The Drywell N2 Purge Supply (HV-57 *21) is currently administratively blocked closed.

WHICH ONE of statements below describes the bases for this configuration? a. nitrogen vaporizer trip due to high flow i

     !

b. pressure suppression bypass during plant fires  ! c. inability of valves to close against nitrogen flow during purge l d. excessive SGTS drawdown time if other unit containment isolates l t

F l PAGE: 14 EXAM: SROWRITTEN l l 27) PV:1.0 The plant is operating at 75% power when the "B" Reactor Enclosure Vent Exhaust Duct Radiation Monitor fails downscale.

WHICH ONE of the following describes the status of Reactor Enclosure Ventilation and SGTC systems? l RE Vent SGTS a. operating standby b. isolated standby c. operating initiated l d. isolated initiated 28) *PV:1.0 l Unit 2 is in OPCON 5*. , The air supply to Refuel Floor Supply to SGTS damper (HV76-019) is lost.

! WHICH ONE of the following describes the status of Refuel Floor Secondary Containment? a. will be maintained by the operating RF ventilation fans b. cannot be maintained following RF ventilation fan trip c. will be maintained by SGTS initiation d. cannot be maintained following SGTS flowpath closure

p l l PAGE: 15 EXAM: SROWRITTEN

     ,

29) *PV:1.0 Unit 2 is operating at 80% power with Feedwater Level Control in Automatic, 3-element control.

The "2A" RFP MGU output fails upscale.

WHICH ONE of the following describes the expected plant response? a. Reactor level decreases, reactor scrams on low level b. Reactor level increases, all turbines trip on high level c. "2B" & "2C" RFF speed decreases, level stabilizes at 35" d. "2B" & "2C" RFP speed remains constant, level stabilizes at 40" 30) PV:1.0 Unit 1 is operating at 25% power when a load reject occurs.

WHICH ONE of the following states the valves that close to prevent a turbine overspeed trip? a. Control and Intercept b. Bleeder Trip and Bypass I c. Main Stop and Intermediate Stop

     ,

d. #2 Main Stop and Moisture Separator Dump l

1

     !

I i I I i

I I i l l

     ,

l PAGE: 16 EXAM: SROWRITTEN 31) PV:1.0 Unit 1 is in OPCON 3 Zone 1 and 3 are inter-tied for shield block removal Unit 2 Drywell pressure increases to 2.1 psig WHICH ONE of the choices below states the zones aligned to SGTS? a. Zone 1 only b. Zone 2 only c. Zones 2 and 3 only d. Zones 1, 2, and 3 33) PV:1.0 Unit 2 plant conditions are as follows:

-

The reactor has been shutdown due to a leak in the Drywell

-

Drywell Spray is required

-

D21 Safeguard Bus is de-energized WHICH ONE of the following can be used to Spray the Drywell without locally operating components? a. "2A" RHR pump b. "2B" RHR pump c. Fire Water System d. RHR Service Water System

- PAGE: 17 EXAM: SROWRITTEN 33) *PV:1.0 Unit 1 Turbine is being removed from service due to an EHC leak. The reactor is to remain critical.

Plant conditions are as follows:

-

Reactor Power is 25%

-

An "A" side half scram is present

-

An EO in the Aux Equipment Room reports that PIS-01-1N652D, ,

     '

First Stage Turbine Pressure, is in the tripped condition WHICH ONE of the following will prevent an automatic reactor scram when the Main Turbine is tripped? l a. transfer House Loads to reset PIS-01-1N652D b. insert control rods until PIS-01-1N652D resets c. reduce Generator reactive load with AUTO voltage adjust until PIS-01-1N652D resets d. open Bypass valves until " TURBINE CONTROL /STOP VALVE SCRAM BYPASSED" alarm is lit 34) *PV:1.0 Plant conditions are as follows:

-

Two in-series downcomer vacuum breakers are stuck open

-

A LOCA occurs in the Drywell

-

Drywell pressure stabilizes at 23 psig

-

Suppression Pool level is 23.5 ft WHICH ONE of the following indicates final Suppression Pool pressure? a. 10 psig b. 18 psig c. 23 psig d. 28 psig

  . _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _ __

l PAGE: 18 EXAM: SROWRITTEN 35) PV:1.0 Plant conditions are as follows:

-

Main Turbine tripped from 100% power

-

40 control rods failed to fully scram due to hydraulic lock

-

Reactor Power is 5%

-

Reactor Mode Switch is in " SHUTDOWN"

-

CRD drive water pressure is 260 psid ' WHICH ONE of the following describes why the RO cannot manually insert control rods? a. RWM rod block b. APRM rod block c. Low CRD drive water pressure d. Full Scram Discharge Volume 36) PV:1.0 Both Units are in OPCON 2 A loss of offsite power occurs WHICH ONE of the following describes the cooling water alignment for the Diesel Generators? Source Return a. Cooling Tower Cooling Tower b. Spray Pond Cooling Tower c. Cooling Tower Spray Pond d. Spray Pond Spray Pond

 . .
 ,,
  .
      .
      .
     !
     !

t PAGE: 19 EXAM: SROWRITTEN I 37) *PV:1.0 l A loss of all AC power occurs  ! E-1 directs Natural Ventilation to be established for HPCI and RCIC WHICH ONE of the following describes why this action must be taken? a. Service Water flow is lost i b. Reactor Enclosure Ventilation fans are off c. HPCI and RCIC room unit coolers are de-energized

     !

d. Steam Leak Detection temperature isolations occur  ! 38) *PV:1.0 WHICH ONE of the following is an Immediate Operator Action for reactor high pressure? a. lower Load Set I b. raise Load Limit c. lower Pressure Set d. raise Maximum Combined Flow 39) *PV:1.0 l Unit 2 is operating at 100% power.

A Feedwater Level transmitter failure causes reactor level to drop to-5" for several seconds.

Reactor Power is 37%. WHICH ONE of the following will allow control of RPV level using the , Feedwater Master Controller? 1 ' a. " AUTO" mode with thumbwheel setpoint b. " AUTO" mode with "OPEN" and "CLOSE" pushbuttons c. " MANUAL" mode with thumbwheel setpoint d. " MANUAL" mode with "OPEN" and "CLOSE" pushbuttons _ __ ___

PAGE: 20 EXAM: SROWRITTEN 40) PV:1.0 Unit 1 is in OPCON 5

-

Suppression Pool Cooling is in service using che cross-tie and the "1C" RHR pump

-

DIV 3 LOCA signal occurs WHICH ONE of the following describes the resulting valve alignment for HV51-1F048A (Heat Exchanger Bypass) and HV51-1F017C ("C" LPCI Injection)

     ,

valves?

     !

HV51-1F048A HV51-1F017C l

     !

a. open open b. open close c. close close d. close open 41) *PV:1.0 Unit 2 is at 90% power

-
" LOSS OF SQUIB VALVE CONTINUITY" alarm annunciates
-

Reactor power is lowering

-

RWCU isolates WHICH ONE of the following states required action and bases? a. Scram the reactor due to uncontrolled reactivity insertion b. Scram the reactor due to possible thermal limit violations c. Secure SLC pumps due to regional power oscillations d. Secure SLC pumps due to reactor coolant high conductivity

f l PAGE: 21 EXAM: SROWRITTEN

42) *PV:1.0 All Remote Transfer Switches are placed to " REMOTE" at the Unit 1 Remote Shutdown Panel.

WHICH ONE of the following describes the status of "RCIC STEAM LINE OUTBOARD ISOLATION" (HV-49-1F008) valve? MCR Control Component Interlocks Control Power a. Enabled Active Normal b. Disabled Bypassed Alternate c. Enabled Bypassed Alternate d. Disabled Active Normal 43) *PV:1.0 Plant conditions are as follows:

-

Unit 1 is in OPCON 5

-

Reactor cavity is flooded with spent fuel pool gates removed

-

Both Reactor Well Top and Bottom seals, #3 and #4, have failed

-

A Site Area Emergency has been declared due to offsite release WHICH ONE of the following actions is required? a. Enter and execute T-101 b. Enter and execute T-102 c. Enter and execute T-103 d. Enter and execute T-104

PAGE: 22 EXAM: SROWRITTEN

.  .
   .

44) *PV:1.0 Unit 1 is in OPCON 5* Unit 2 is in OPCON 1 with Drywell N2 makeup in progress A fuel bundle drops in the Unit 1 Spent Fuel Pool Refuel Floor Exhaust Radiation levels increase to 5 mr/hr WHICH ONE of the following states plant response? Unit 2 N2 Makeue RF Ventilation SGTS a. aligned in service in standby l b. isolated in service running c. aligned isolated in standby d. isolated isolated running 45) *PV:1.0 Plant conditions are as follows:

-

Drywell Pressure: 24 psig

-

Drywell Temperature: 250 F

-

Suppression Pool level: 29.2 ft WHICH ONE of the following bases states why Drywell Spray is prohibited? a. excessive stress on SRV tailpipes b. excessive suppression Pool wall loading c. excessive Suppression Pool to Drywell differential pressure d. excessive pressure drop due to evaporative cooling

PAGE: 23 EXAM: SROWRITTEN

  .
     .

46) *PV:1.0 Plant conditions are as follows:

-

Reactor is shutdown

-

Suppression Pool level is 16.9 ft

-

RCIC is injecting to the RPV, suction temp 106oF

-

A RHR is in Suppression Pool Cooling, suction temp 115*F

-

B RHR is secured, suction temp 97*F

-

SPOTMOS indicated temp 128*F

-

CST level is 33.5 ft.

WHICH ONE of the following describes the valid Suppression Pool temperature? a. 97*F b. 106 F c. 115 F d. 128*F 47) *PV:1.0 Plant conditions are as follows:

-

Drywell temperature: 200 F

-

Drywell Pressure: 23 psig

-

Suppression Pool Pressure: 22.5 psig

-

Suppression Pool Level: 13.1 ft

-

Suppression Pool Water Temperature: 98*F WHICH ONE of the following actions will allow use of RHR for Suppression Pool Spray? a. vent the Drywell b. vent the Suppression Pool c. raise Suppression Pool level d. reduce Suppression Pool temperature l

.

PAGE: 24 EXAM: SROWRITTEN l \ 48) *PV:1.0 l l l Steam cooling is in progress per T-111, with the following conditions:

-

RPV level is -196"

-

No injection into the RPV l WHICH ONE of the following describes the status of the fuel? Adecuate Core Coolina Expected Peak Clad Temo a. yes 1800 F b. yes 2200oF c. no 1800 F d. no 2200oF 49) *PV:1.0 Plant conditions are as follows:

-

An ATWS is in progress

-

Plant Monitoring System (PMS) is inoperable WHICH ONE of the following can be used to confirm that a control rod is fully inserted?

     '

a. Green "IN" light is lit on the Full Core Display b. Blue " SCRAM" light is lit on the Full Core Display c. "- " (two dashed lines) on the Four Rod Display d. "X X" (two X's) on the Four Rod Display

PAGE: 25 EXAM: SROWRITTEN 50) *PV:1.0 Plant conditions are as follows:

-

A South Vent Stack radiation release is in progress

-

Unit 1 Containment Purge with air is in progress

-

SGD-206-3 (Refuel Floor to SGTS connecting damper) is closed WHICH ONE of the following describes the source of the rad release? a. Unit 1 TEECE b. Unit 1 REECE c. Off-gas System 1 d. Unit 1 Containment Purge i 51) *PV:1.0 l Plant conditions are as follows:

-

A LOCA is in progress

-

Drywell H2 - 3%

-

Drywell O2 - 8%

-

Suppression Pool H2 - 7%

-

Suppression Pool O2 - 4% WHICH ONE of the following describes the T-102 Sheet 2 sections required to be performed? a. DW/G-3 and SP/G-1 b. DW/G-2 and SP/G-2 c. DW/G-3 and SP/G-3 d. DW/G-2 and SP/G-1

PAGE: 26 EXAM: SROWRITTEN 52) *PV:1.0 Unit 2 is operating at 75% power The "2B" steam pressure transmitter for EHC fails upscale Reactor Mode Switch is placed in " SHUTDOWN" Reactor pressure is 850 psig and lowering WHICH ONE of the actions below will terminate this plant transient? a. raise PRESSURE SET b. lower BYPASS JACK c. raise LOAD LIMIT d. lower MAXIMUM COMBINED FLOW I l

     !

I 53) *PV:1.0 l Unit 1 is operating at 60% power The "1C" RFP trips while being placed in service The "1C" Low Pressure Heater string isolates FLLLP is 1.104 and slowly rising WHICH ONE of the following describes the effect on Thermal Power and reason for this trend? l l a. rising due to rising Reactor Pressure

b. dropping due to lowering Reactor Level c. rising due to loss of feedwater heating d. dropping due to loss of feedwater flow

PAGE: 27 EXAM: SROWRITTEN 54) *PV:1.0 Unit 2 Remote Shutdown Panel is manned due to a fire in the MCR.

- Drywell Pressure: 2.5 psig

-

DIV 3 DC power lost WHICH ONE of the following states available pressure control? a. "2A", "2C", or "2N" SRV b. "2S", "2M", or "2K" SRV c. "2A", "2C", or "2N" SRV only after Instrument Air backup d. "2S", "2M", or "2K" SRV only after Instrument Air backup 55) *PV:1.0

** REFER TO THE ATTACHED REFERENCE **

Unit 1 plant conditions are as follows:

-

Reactor Power: 70%

-

LP Turbine Inlet Pressure: 84 psig

-

Condenser Vacuum: 23.9" Hg WHICH ONE of the following states action required? a. raise recirc flow b. raise " PRESSURE SET" c. place the standby SJAE in service d. trip the turbine within 5 minutes

p ! PAGE: 28 EXAM: SROWRITTEN

  '  '
 /  *. ,s
    = -

N 56) *PV:1.0 Unit 1 DIV IV DC is deenergized.

E-1FD directs initiation of a Manual MCR Chlorine Isolation.

WHICH ONE of the following describes why the manual isolation is initiated? a. minimizes heat load on CEHVAC System b. ensures outside air is isolated to the MCR c. prevents excessive positive MCR pressure d. places MCR on recirc to ensure panel cooling 57) *PV:1.0 The following conditions exist:

-

Unit 1 is at 100% power

-
"1D" Narrow Range Level Transmitter is upscale
"1C" Feedwater Narrow Range Level Transmitter fails upscale.

WHICH ONE of the following states the status of the Reactor Feedpump Turbines and the Main Turbine? RFP Turbines Main Tui5ine a. operating operating b. tripped tripped c. tripped operating d. operating tripped

e - -

     ;

I PAGE: 29 EXAM: SROWRITTEN !

   ..

58) *PV:1.0

' Reactor Recirc pumps are required to be tripped during a loss of l Instrument Air.    '

WHICH ONE of the following states the basis for this action? a. loss of Recirc M-G set winding cooling l l b. loss of Recirc M-G set oil cooling ' c. loss of Recirc pump seal cooling d. loss of Recirc pump oil cooling , l 59) *PV:1.0 Following a LOCA, the HV-C-01-1F020 (Main Steam Line Equalizer Valve) is l closed and cannot be opened.

l All MSIV's are closed.

' WHICH ONE of the following describes how leakage past the MSIV seats is controlled? a. directed to the Main Condenser via Main Stop Valve Above Seat Drain lines b. directed to the Main Condenser via Hotwell Heating Coils c. directed to the Reactor Enclosure via Main Steam Line Barrier Vent valves d. directed to the Reactor Enclosure via "1C" Main Steam Line Vent

     ,
     !

PAGE: 30 EXAM: SROWRITTEN I

     '

60) *PV:1.0 Unit 2 plant conditions are as follows: l l

-
"2B" RHR operating in Shutdown Cooling in OPCON 4  "
-
"2B" Reactor Recirc Pump SUCTION and DISCHARGE valves  1 (HV43-2F023 and 2F031) are OPEN.

- Reactor Pressure: 25 psig j

-
"2B" RHR Suction Temperature: 120 F   l
-
"2B" RHR Flow:  6200 gpm  j
-

Reactor Level: +54"  ! WHICH ONE of the following reflects plant status?  ! i Shutdown Coolina Flow Reactor Water Temperature 1 a. thru core 120 F f b. bypassing core greater than 120 F l c. thru core greater than 120 F j d. bypassing core 120oF , I 61) *PV:1.0 l Plant conditions are as follows:

-

RPV Pressure: 50 psig

-

Drywell Pressure: 30 psig j

-

Drywell Temperature: 350*F

-

Suppression pool level: 20.6 ft

     !
     '

Reactor Level indications:

-

Wide Range: -70"

-

Shutdown Range: +80" l

-

Upset Range: +60"

-

Narrow Range: +10"

-

Fuel Zone: Upscale WHICH ONE of the following describes Reactor water level? a. unknown b. -60" to -80" i c. +0" to +20" d. +70" to +90"

     )

PAGE: 31 EXAM: SROWRITTEN .

..

62) *PV:1.0 WHICH ONE of the following describes the basis for maximum Containment water level of 115.8 ft? l a. Drywell pressure tap becomes covered with water l l b. Drywell Purge Exhaust line fills with water l l c. Drywell Spray headers become covered with water

d. Drywell equipment hatch seal failure i

63) *PV:1.0 i Unit 1 is operating at 35% TIP operations are in progress Reactor water level drops to -75".

" REACTOR ENCLOSURE AREA HI RADIATION" Annunciates.

An EO reports " NEUTRON MONITORING SYSTEM AREA" ARM is alarming.

WHICH ONE of the following describes the status and cause of this MCR alarm? a. expected, as TIP withdraws and stops at the indexer b. expected, as TIP withdraws and stops at the shield c. not expected, as TIP withdraws and stops at the indexer d. not expected, as TIP withdraws and stops at the shield

l PAGE: 32 EXAM: SROWRITTEN

   ~

l 64) *PV:1.0 Plant conditions are as follows:

-

RWCU resin spill has occurred in the Reactor Enclosure

-

Reactor Enclosure HVAC Exhaust rad level is 8.7 mr/hr

-

T-290 readings above MNO as follows: RWCU "A" pump room 121 mr/hr RWCU regen Htx room 102 mr/hr Access to the Reactor Enclosure is required.

WHICH ONE of the following actions is required? a. isolate Refuel Floor HVAC b. restore Reactor Enclosure HVAC c. ensure Standby Gas Treatment System running d. manually scram the reactor at 50% core flow 65) *PV:1.0 Unit 2 Reactor Power is 3%

"2A" Recirc Pump trips WHICH ONE of the choices below states required Immediate Operator Action (s)?

a. SCRAM the Reactor and PLACE mode switch in " SHUTDOWN" b. Drive rods to exit the Restricted Area of Power / Flow Map c. Close " DISCHARGE" Valve (HV43-2F031A) for tripped Recirc Pump d. MONITOR and CONTROL Reactor Level until normal level restored

PAGE: 33 EXAM: SROWRITTEN 66) *PV:1.0 Refueling activities are in progress on Unit 1.

All control rods are fully inserted.

A fuel bundle is being moved from the Spent Fuel Pool to the Core.

WHICH ONE of the following conditions is required if the Refuel Bridge is to enter the fuel transfer / cattle chute area at normal speed? a. Auxiliary Hoists are not loaded b. Boundary Zone Computer in " Bypass" c. Reactor Mode Switch in " SHUTDOWN" d. Grapple a the normal full up position 67) *PV:1.0 Plant conditions are as follows:

-

Unit 1 is at 3% power

-

Mechanical Vacuum Pump operating

-

All MSIVs and Main Steam Line Drain valves open

"1A" and "1B" Main Steam Line Radiation Monitors both trip (>3xNFPB)

WHICH ONE of the following describes plant status? MSIVs Steam Line Drains Mechanical Vacuum Pumn a. open open tripped b. isolated open running c. open isolated running d. isolated isolated tripped

"

l i i PAGE: 34 EXAM: SROWRITTEN 68) *PV:1.0 Reactor power is 20% i Control Rod 28-29 is selected l WHICH ONE of the following describes Rod Block Monitor (RBM) status? a. bypassed, will not enforce a rod block i b. bypassed, will enforce a rod block at 107% i

     !

c. enforcing, will enforce a rod block at 112% I d. enforcing, will enforce a rod block at 117% , 69) *PV:1.0 1 l l Plant conditions are as follows: i

-

In OPCON 5

-

Reactor Cavity is flooded l

-

Spent Fuel Pool gates are removed 1

-

Reactor Cavity Water Level begins to drop

     {
-

Spent Fuel Pool makeup cannot stabilize Reactor Cavity Water i Level  !

     !

WHICH ONE of the following describes the long term effects? ,

Fuel Pool Fuel In Spent Coolina Pumos Fuel Pool a. tripped uncovered b. running uncovered c. tripped covered d. running covered l a

I , \ l l l PAGE: 35 EXAM: SROWRITTEN l 70) *PV:1.0 l l The following parameters are reported for Unit 1:

-

HPCI Pump Room: 160'F

-

RCIC Pump Room: 100 F

-
"1A" & "1C" RHR Pump Room: 150*F
-

HPCI Room Water Level: 8"

-

All other T-290, " Instrumentation Available For T-103", parameters are normal i WHICH ONE of the following systems are no longer assured to be available for safe shutdown of the plant? a. HPCI b. RCIC c. HPCI and RCIC d. "1A" & "1C" RHR pumps 71) *PV:1.0 The Unit 2 RO is requested to support a PMT which requires data collection from the Containment Hydrogen Recombiner panel 2AC696.

The data will take 20 minutes to obtain.

WHICH ONE of the following describes the necessary steps for the RO to obtain the data? a. notify the PRO, short term relief is not required b. obtain CRS authorization, short term relief is not required c. short term relief is required, no log entry is required d. short term relief is required, log entry is required f ! ~

PAGE: 36 EXAM: SROWRITTEN 72) *PV:1.0 The Unit is in OPCON 1 Manual Scoop Tube operation is required at the M-G set The Floor Gupervisor is standing by at the M-G set to provide needed support WHICH ONE of the individuals below is permitted to manipulate the Scoop Tube? a. Duty Reactor Engineer b. Turbine Enclosure EO (nonlicensed) c. Engineer in current SRO Certification class d. EO in current RO licensing class 73) *PV:1.0 ST-6-092-364-1, D14 DIESEL GENERATOR OPERABILITY VERIFICATION, is in progress.

The EO working locally at the EDG reports that the procedure directs operation of LOCAL-REMOTE SELECTOR SWITCH "43-DG207".

The EO verifies that this switch number should be "43-DG501".

WHICH ONE of the following describes the actions necessary to complete this ST? a. stop, submit a TC for the change and then continue b, stop, submit a PPIS for the change and then continue c. complete the ST, then submit a TC for the change d. complete the ST, then submit a PPIS for the change

_-- i 1

i PAGE: 37 EXAM: SROWRITTEN l

     '

74) *PV:1.0 Clearance removal is being evaluated for Independent and Double Verification requirements? Verification of several steps in the clearance will require exposure of 12 to 15 mR.

WHICH ONE of the following reflects verification requirements? Independent Double Verifications Verifications a. can be waived can not be waived b, can not be waived can be waived c. can not be waived can not be waived d. can be waived can be waived 75) *PV:1.0 Plant conditions are as follows:

-

An ATWS is in progress

-

T-101, RPV CONTROL, and T-117, POWER / LEVEL CONTROL, are being implemented

-

SAMP procedure entry is now required WHICH ONE of the following states the procedures which are required to be implemented? a. SAMPs only b. SAMPs and T-101 c. SAMPs and T-117 d. SAMPs, T-101 and T-117 i ! ! l ! !

- PAGE: 38 EXAM: SROWRITTEN I l 76) *PV:1.0 ) Plant conditions are as follows:

-

Unit 2 is in OPCON 1

-

Unit 1 is in OPCON 5,, Refueling operations are in progress.

- Dil D/G is INOP i

-

D13 D/G is INOP l It is discovered that D14 D/G undervoltage relay 127-11X will not trip.

101 Safeguard Bus was removed from service two hours ago.

WHICH ONE of the following describes the required actions? Unit 1 Unit 2 a. Restore at least one D/G Restore off site source in 70 hr or within 12 hours or suspend shutdown.

core alts.

b. Core alts may continue Restore D13 or D14 to operable indefinitely within 70 hours or shutdown c. Suspend core alts Restore offsite source in 7 days or shutdown.

d. Suspend core alts Restore offsite source in 70 hours or shutdown

i l l PAGE: 39 EXAM: SROWRITTEN I

 ..

77) *PV:1.0 l l Unit 1 plant conditions are as follows- ' l

-

Reactor is shutdown

-

Reactor Pressure: 300 psig

-

Reactor Level: +34"

-

Irradiated fuel is being moved in Unit 2 Spent Fuel Pool The following battery charger test current data is provided: l CHARGER CURRENT 1BCA1 310 1BCA2 324 1BCB1 291 1BCB2 279 1BCC 86 1BCD 97 WHICH ONE of the following describes the required Tech Spec action? a. stop fuel movements b. COLD SHUTDOWN in 32 hours c. COLD SHUTDOWN in 36 hours d. COLD SHUTDOWN in 44 hours l l

PAGE: 40 EXAM: SROWRITTEN 78) *PV:1.0 Plant conditions as follows:

-

Unit 1 in OPCON 5

-

Reactor Level is 217"

-
 "1A" RHR is in Shutdown Cooling
-

HV-51-1F008, SHUTDOWN COOLING SUCTION OUTBOARD, fails closed and cannot be reopened.

WHICH ONE of the following describes actions that must be completed within 1 hour? a. place "1B" RHR in Shutdown Cooling b. place "1A" Recirc pump in service c. raise Reactor Level to 490" d. initiate SGTS aligned to Refuel Floor 79) *PV:1.0 Reactor Pressure reaches 1338 psig.

WHICH ONE of the following states the required actions? Notified Future Critical Operations a. NRC within 1 hour approved by NRC b. Plant Manager within 1 hour approved by NRC c. NRC within 1 hour approved by NRB d. Plant Manager within 1 hour approved by NRB _ _ _

     ,

PAGE: 41 EXAM: SROWRITTEN

    . .

80) *PV:1.0

* Unit 1 is operating at 20% power.

Drywell Chilled Water Inboard and Outboard Isolation valves are bypassed.

WHICH ONE of the following describes the required Tech Spec action? a. STARTUP in 12 hours, HOT SHUTDOWN within the following 24 hours b. HOT SHUTDOWN within 12 hours, COLD SHUTDOWN within the following 24 hours c. isolate Inboard valves within 12 hours, HOT SHUTDOWN within the following 12 hours d. isolate Outboard valves within 12 hours, HOT SHUTDOWN within the following 24 hours 81) *PV:1.0 Unit 1 plant conditions are as follows:

-

Reactor is Shutdown

-

Reactor Level: -60" and slowly lowering

-

CST Level: 26 ft

-

HV-51-1F017A (LPCI INJECTION) valve is stuck closed

-
"1B" RHR pump is injecting at 10,000 gpm WHICH ONE of the following methods can be used to increase injection to the RPV?

a. T-240, Maximizing CRD ficw b. T-243, Alternate Injection from RHRSW c. T-244, Alternate Injection from Fire Water d. T-245, RPV Injection from RHR Shutdown Cooling

______-______ - ___ _ - - -- - - PAGE: 42 EXAM: SROWRITTEN 82) *PV:1.0 Unit 2 is at 37% power.

Both CRD pumps are tripped and cannot be started.

15 minutes later, 23 HCU Accumulator Trouble annunciators are alarming.

A GP-4 Shutdown is performed.

t WHICH ONE of the following describes expected plant response? a. 23 rods will not insert b. all rods will insert with normal scram times c. all rods will insert with significantly longer scram times I d. all rods will insert, only 23 rods will have significantly k longer scram times 83) *PV:1.0 Unit 2 plant conditions are as follows:

-

Reactor Power: 100% i

-

A/C RHR Pump Room Level: 20" and rising slowly The source of the water leaking into the A/C RHR pump room has been determined to be the " :C" LPCI injection line (water is leaking past HV51-2F017C and through RHR Heat Exchanger inlet flange).

WHICH ONE of the following actions is required? - a. scram the Reactor, enter T-101 b. perform a GP-3, Normal Plant Shutdown , c. enter Tech Spec 3.5.1 for "2C" RHR pump INOP ! d. perform Emergency Depressurization per T-112 $ ,

-
  . . _ _ .
     - . . . . . . .

____m

PAGE: 43 EXAM: SROWRITTEN

  .

84) *PV:1.0 The Main Control Room is abandoned due to high toxi; gas concentrations.

Control has been established at the Remote Shutdown Panel per SE-1.

WHICH ONE of the following describes the level control mechanisms specified in SE-1? a. manual RCIC control only b. manual HPCI control only c. manual RCIC control with HPCI cycling between +12.5" and +54" d. manual HPCI control with RCIC cycling between +12.5" and +54" 85) *PV:1.0 Purging the Drywell with air per T-228 can only be performed if Drywell pressure is less than 0.75 psig.

WHICH ONE of the following describes the : aason for this limitation? a. prevents exceeding 1.68 psig Drywell pressure b. prevents subjecting Post-LOCA Recombiner Blower to excessive s"ction pressure c. allows Reactor Enclosure Supply fans to discharge air into the Drywell d. ensures Drywell pressure remains within the operating range of the Downcomer Vacuum Breakers u. _

   .-_____- - _ -_ _ _ _ _

PAGE: 44' EXAM: SROWRITTEN 86) *PV:1.0 The Refuel Platform Aux Hoist grapple is out of the water, and cannot be re-submerged due to Aux Hoist motor overload.

The West wall Fuel Floor ARM is alarming.

WHICH ONE of the following actions is required? a. immediately evacuate the Fuel Floor b. lower Aux Holst grapple using the handcrank c. place the alarming ARM mode switch to ZERO d. reset the motor overload, then lower the Aux Hoist 87) *PV:1.0 Plant conditions are as follows:

-

Reactor Pressure: 850 psig

-

Drywell Pressure: 1.9 psig ' - Drywell Temperature: 155*F

-

Drywell Head Tank Level on PMS: " Low"

-
"B" Drywell Chiller:   running WHICH ONE of the following actions is required?

a. start the "A" Drywell Chiller b. align RECW to Drywell and bypass DWCW c. bypass DWCW after verifying DWCW suction pressure greater than 35 psig d. align RECW to Drywell after verifying RECW suction pressure greater than 80 psig

PAGE: 45 EXAM: SROWRITTEN 1 v . 88) *PV:1.0 Plant conditions are as follows:

-

An ATWS is in progress

-

Reactor Power: 30%

-

Reactor Pressure: 930 psig

-

Suppression Pool Level: 23 ft

-

Suppression Pool Temperature: 170*F WHICH ONE of the following actions is required? a. stabilize Reactor Pressure at- 930 psig b. raise Suppression Pool level to 26 ft c. perform Emergency Depressurization per T-112 d. reduce Reactor P?; essure to between 850 and 900 psig 89) *PV:1.0 i

     !

WHICH ONE of the following protective devices may be reset, if the cause of the trip is thought to be known, without further investigation? a. Control Rod Drive Pump Breaker magnetics  ; i b. Core Spray Pump Breaker Relay Target  !

c. RHR Suppression Pool Cooling MOV Thermals d. Drywell Chiller Breaker Auxiliary Relay Target i

     ;

l l l l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ -- l l PAGE: 46 EXAM: SROWRITTEN

        . .

90) *PV:1.0 An EO is performing ST-6-041-241-1, Reactor Vessel Valve Test, which requires Drywell entry.

WHICH ONE of the following states procedural requirements for completing steps in the Drywell? PROCEC'JRE IN HAND PROCEDURE a. required original required b. required copy permitted c. not required original required

.

d. not required copy permitted 91) *PV:1.0 WHICH ONE of the following describes the tracking mechanism required for a non-safety related, motor-operated valve, backseated while hot to limit a bonnet pressure seal leak? a. Equipment Status Tag the MOV handswitch and valve operator b. apply an Equipment Trouble Tag to the MOV handswitch c. apply an Administrative Clearance with activities to repair valve d. enter a Regulatory Action Log entry in the Unified Control Room Log 92) *PV:1.0 WHICH ONE of the following describes appropriate use of a Special Condition Tag (SCT)? a. manual valve with an existing SCT applied b. air operator to a valve danger tagged "OPEN and GAGGED" c. Y-panel feed tagged out in an energized state d. motor feed with a green " SUSPENSION" label applied !

 -

_ _ _ _

PAGE: 47 EXAM: SROWRITTEN

93) *PV:1.0

 ** REFER TO THE ATTACHED REFERENCE **  ;

i Plant conditions are as follows:

-

Unit 2 is in OPCON 5* l

-

Step #17 of the attached CCTAS is in progress l

-

LSRO reports the bundle is about 3 feet from being seated in location 45-48 NW ,

WHICH ONE of the following describes the Outage Shift Supervisor's direction to the Refuel Bridge? a. seat the bundle, perform a pen and ink change to the CCTAS q per RE-C-40, continue with Step #18 ) b. stop fuel moves until corrective actions are evaluated and appropriate management is informed c. raise the bundle above the top guide, re-orient the bundle and inform Reactor Engineering for Shuffleworks update

     !

I d. complete the step, contact Reactor Engineering for Shutdown ! Margin determination, if satisfactory continue with step #18 94) *PV:1.0 WHICH ONE of the following must be done to use portions of ST-6-051-205-1 for a PMT on HV-051-1F017B? ) a. mark Test Frequency as "N/A" and have SQR sign Test Results b. Write " PARTIAL" on the front page and have signed by an SQR prior to use c. mark Test Results " PARTIAL" and annotate reason in Test Comments Section d. write "N/A" on Acceptance Criteria and have signed by PRO /RO prior to use

I PAGE: 48 EXAM: SROWRITTEN 95) *PV:1.0 Entry is required to a Level II Locked High Radiation Area.

WHICH ONE of the statements below describes requirements for entry to this area? HP Technician Document Kev Issue i

     !

a. required before entry b. required after entry c. not required before entry l

     !

d. not required after entry

     !

96) *PV:1.0 i l An Operator has declared pregnancy.

WHICH ONE of the following tasks can she perform without a Special Exception? a. apply block in Safeguard Room 309 posted as a Contaminated Area b. restore Y-panel power in Radwaste MCC Room 145 posted as an Airborne Area c. perform a C.O.L. on HCU's inside posted Radiation Area d. complete an IV on HPCI valves in Feedwater Pipe Chase Room 407 posted as a High Radiation Area

p PAGE: 49 EXAM: SROWRITTEN ! 97) *PV:1.0 l l An area on the Refuel Floor has been surveyed with the following results:

-

area

- 2 mrem 2,000 /hrgeneragbetaloosesurface dpm/100 cm
-

10,000 cpm fixed on several Refuel Floor tools WHICH ONE of the choices below describes the required posting for this area? a. Radiation Area b. Contaminated Area only c. Red Zone only d. Both Contaminated Area and Red Zone 98) *PV:1.0 l You have declared an Alert.

During the initial 15 minute notifications, conditions change and you escalate to a Site Area Emergency.

WHICH ONE of the following describes the requirements for the initial 15 minute notification? j a. complete Alert notification, then perform notifications for a Site Area Emergency l b. continue Alert notification noting escalation to Site Area Emergency on remaining calls ] c. stop Alert notification, perform notifications for a Site Area Emergency without noting escalation

d. stop Alert notification, perform notifications for a site Area ! Emergency noting the escalation i i

I
     !

l

     :

1 i

r- 1 i PAGE: 50 EXAM: SROWRITTEN ! l 99) *PV:1.0 I An injured man has been reported on RE Elevation 217'. WHICH ONE of the following will respond as a member of the Medical Team? a. Shift Manager i i b. Shift Technical Advisor a c. Medical Review Officer d. Health Physics Technician 100) *PV:1.0

Plant conditions are as follows: )

-

SAMP procedures have been entered

-

Reactor Level is unknown

-

A reactor scram occurred 30 minutes ago; all rods fully inserted

-

RPV Injection Flow: 700 gpm and stable

-

Reactor Pressure: 280 psig and stable

-

Suppression Pool Pressure: 20 psig

-

Suppression Pool Level: 42 ft

-

Drywell Pressure: # 33 psig and-stable

     +-

WHICH ONE of the following SAMP-1 sheets must be implemented? a. Sheet 4 b. Sheet 5 c. Sheet 6 d. Sheet 7

  :

l l

 ,

L _ _

            .
            .

_ g n c a _ g.<c _

 .

M I" I _ E I C" um, uOn uO, uW- m o- > om I I ON u4n um, uOn uW. =&a m 4 o, a- os I _ OMu4n umn i I D C S N C P I u O *. uWn H A O O A O E

       ,

m9 .o' m t os I I W9 , oa . O r, ,uW n %3 A AV ET Y M C PM R U C .

        . . m. o m, . > , sa

_ _

'

E P A t A I E N R O i . I I Gmo4n umn uOn uW, O R N L T S N t-m u m, . > )ca

            .

_ WEV Y S E U . I _ I WO u4n uOf uO uWn r E IT C rm um, u>nma

    ,N I / C  L     I I

umn uOn uO, oWn I E P U T L E GN .<, H W E R E A . m.. i uo,um,a>as I E C I R I W um, uOn uOn awn 0 <<~F J,VA D T . mh Uo, aa, <> wa E O Y

        .

I A~ A P _ I WG omn uOn uOn oWn N N A N 1m, Uo, a>, ws I Y U A _ I

@Ou4n uOn uOn u35n  E D R M t a  . m, h don umn

aI IT

I umn .On aOn uWn H U O B E s t m_ Oe E N L amn i Uon o m, u > n Oa I

            .
            ._

R D L R .-

            .

_ I WN u4n uOn uOn uWn E vm, t uon u m ,. . > n ew

            -.
            .
     #      .

I - G R V TS omn o >, ow I

@Mo4n .On uOn uWn
    !

um, h I

            .

E A m.

I

@4u4n omn uOn uWn  N N    umn   omn ..> n sw I m_

I Om u4n uon .On uWn N D om, h J'o, um, u>now _ _ _ O T - I m_ I CC u 4 n umn uOn uWn R H simn uon umn mw _ R E I _

            .

I CN umn uOn uOn uWn E C umn umn a >, aw I _ C O _ _ I Wm umn uON uOn uWn E I R um, uon u>n ww I . V R -

            .

_

:

I

@O u 4l'

f omn uO, uWn E E .- m n h eton 1 a>, wa I

            .

D CT I NO u4n umn uOn uWn ;m,, i uon u >n .w _ A E I . I Neu4n omn uOn uWn S S D .i m n

        . ton am, J

Ow I F I Q s r E S t E D I NNu4n umn .On uWn T U um, , uo o>now I _ _ A N :Z I T I NM omn uOn uOn uWn t m ,. a u m , e > n mw I H I C E L A SI NTu4n umn .O4r uWn L c m .,

        .

u o ,. u a .- sw I D I R I Nc umn uOn uOn uWn W in rn uo, a > n ow I E O E S CI Nc u4n umn uOn uWn R X T am, k .'o,_m, a>nvw J I T i I OI NNu4n uOn uOn uWn K A AIT im,h . o, u m, aw M

          .

N O O t J I I Nmu4n uOn uOn uWn N r m N um, uon o > n ww I I NO omn , Qq oOn uWn $

T S P B um,. h Jon umn t.

ww I a n S I' W R/

- I QOu4n uOn uOn uWn  t ur E

um, k uon amn o>n . w I e I c* u4n umn uOn

 -  uWn  X A

M

     '

Oh umn h bo, u > n Ow

           ,>no-I I

eN u4!*t uOn uOn uWn I i m, s uon i N I mM om, uOn uOn uWn A 6:m, uan o>,a- 1 I m4 u 4 n umn uOn uWn T I O % /r} tm,

        .

umn a > n s. I I mm u 4n umn uOn uWn N e t m, u m, u >n a-. Tf 2 I

     -

I mC omn oOn uOn uWn smn Jo, e a > n n.u. I I WNu4n umn uCn a uWn .-Jm, h k o, u a , o > n a-J I I mmu4n umn aOn uWn o * * um, uo, a > n w- I E E U I mm u4n omn uOn uWm R X S ( mo J a m, o > n w-. I A A E I

@Ou4n .On uOn uWn    S M #  umn h  um, a>n ..- I E P 2 I
@" umn uOn oOn uWn
   -

C L .mn . m , a>, Om

          .
          .

P I

E O : E I

@Nu4n umn oOn awn    M c N  .m 7 i ao, mm  m>no i A C I      P 2 em, h . o, u m , > , m
@Mu4n uOn uOn awn    L  I L
        .-
          .

E c I

@4o4n uOn uOn uWn    T B  . m,
        ,  4 o, u>,s 1 E >

I Gne4n .On uOn uWn L = i..m, om,u>,e Y $=

I

@Cu4n umn uOn 6We w   T   m,  .o,.m,_>,u
          - . .

n I O c I GNo4n uOn uOn uWa C D

      ~
       ~
        .m-2  .-o, ;e- a I
   ',

H ' m>,w I

@mu4n umn .On  aWo ' ..- -   A :  ,im-  w o ,. I N E I
@Oa4n umn uOn  W,   G 2 ms  .o  .> w I E

I OC u 4 n aOn uOn uWn . m ,. o, &mu . 1

        -

m

       . -
       . 4$y
       . < rf  J u,  5

}}